Edinburgh Airport (EDI): One Runway at Ingliston, a 1977 Terminal and a Tram Since 2014
16,970,685 passengers and 120,927 aircraft movements in 2025, on a single asphalt runway, 06/24, 2,558 metres long. The airport sits 9 kilometres west of the city centre, began as a military aerodrome in 1916, opened to commercial traffic in 1947, and gained its present terminal in 1977 and its first rail connection in 2014.
A West Edinburgh Site Between Two Motorways
Edinburgh Airport stands at Ingliston, 6 miles or 9 kilometres west of the city centre, just off the M8 and M9 motorways and on the A8 road.
The article also records access from the M90 by way of the Queensferry Crossing, which puts Fife and the north within one road journey.
By passenger numbers it is the busiest airport in Scotland and the sixth busiest in the United Kingdom, with 35 airlines and more than 152 international destinations.
| Item | Detail |
|---|---|
| Codes | IATA EDI, ICAO EGPH |
| Location | Ingliston, Edinburgh, Scotland |
| Distance to the centre | 6 miles, 9 km, to the west |
| Opened to commercial traffic | 19 May 1947 |
| Owner | Vinci SA 50.01 percent, Global Infrastructure Partners 49.99 percent |
| Operator | Edinburgh Airport Limited |
| Elevation | 112 ft, 34 m |
| Runway | One, 06/24, asphalt, 2,558 m, 8,392 ft |
One Runway, and a Second Strip Withdrawn in 2018
The airport has one runway, 06/24, 2,558 metres long and 8,392 feet, with an asphalt surface. A second runway, 12/30, was withdrawn from use on 29 March 2018.
The article gives no length or surface for 12/30, so none is stated here. It records the withdrawal date and nothing else about the strip.
One runway sets the shape of the operation. Every arrival and departure in 2025 used the same 2,558 metres, with no second strip to separate landing traffic from departing traffic. The record shows what that constraint carries: 120,927 movements.
Spread across the year, that is about 331 movements a day, arithmetic on the annual figure. The 16,970,685 passengers work out at about 140 per movement. In 2019 the airport handled 14,737,497 passengers on 127,335 movements, about 116 per movement. The 2025 aircraft carried more people on about 6,400 fewer movements, while passengers rose by about 15 percent.
That matches the article's note about 2014, when passenger numbers rose while flights fell because aircraft were operating at a higher capacity. Growth has come from filling and upgauging the aircraft, not from a second strip.
06/24, asphalt, 2,558 m. The only runway listed for the airport.
12/30, withdrawn on 29 March 2018. The article gives no dimensions.
3,900 ft, 1,189 m, paved for the Spitfire. Less than half the length of today's runway.
From a Wartime Aerodrome to a Civil Airport
The site began as a military airfield. Turnhouse Aerodrome opened in 1916 as the northernmost British air defence base of the First World War, used by the Royal Flying Corps.
In 1918 the Royal Air Force was formed, the airfield was renamed RAF Turnhouse, and ownership passed to the Air Ministry. From 1925 the base housed 603 (City of Edinburgh) Squadron, which flew DH 9As, Westland Wapitis, Hawker Harts and Hawker Hind light bombers from a grass airstrip.
In 1939, when the Second World War broke out, RAF Fighter Command took control. A runway of 3,900 feet was paved to handle the Supermarine Spitfire. During the Battle of Britain, 3, 65 and 141 Squadrons were present. The article marks some of these early details as needing a citation.
After 1945 the airfield stayed under military control, so the civil airport opened inside a working RAF station rather than on a clean site. Commercial traffic was officially opened on 19 May 1947. The first commercial flight was a British European Airways service from London Northolt to Shetland, with Edinburgh and Aberdeen as intermediate stops, flown by an 18 seat Douglas C47.
International service took another fifteen years. It began in 1962 with a direct service to Dublin, but for a long time international flights were charter and private only. The scheduled map widened in the late 1970s, with Amsterdam in 1975, and by the mid 1980s included Paris, Düsseldorf, Brussels, Frankfurt and Copenhagen.
The transatlantic gap was legal rather than technical. Direct flights were not possible because Glasgow Prestwick was the only designated gateway in Scotland under the Bermuda II agreement. Edinburgh could handle the aircraft but did not have the designation. RAF Turnhouse remained operational near the terminal through the post war period and closed in 1997.
The Terminal That Replaced a Building at Eight Times Its Design
The British Airports Authority took over on 1 April 1971, when the original terminal was running at about eight times its design capacity. Six years later, on 27 May 1977, Queen Elizabeth II opened the replacement.
The first response was cosmetic: extra seating and television monitors went into the old building, and it took two years for plans for a new terminal and runway redesign to be proposed. Public consultation started in November 1971 and ended in February 1972.
The initial stages of redevelopment began in June 1973 and included a diversion of the River Almond. Construction of the new terminal, designed by Sir Robert Matthew, started in March 1975. The building opened two years later and is still the terminal in use, which makes everything since 1977 an addition or a reorganisation rather than a replacement.
When BAA took control in 1971 the airport handled 681,000 passengers. By the time BAA was privatised in 1987 it handled over 1.8 million a year, about 2.6 times the 1971 figure.
A later extension was announced in 2013, taking the terminal up to the tram stop. A separate project added a 6,000 square metre security and retail building, but the article flags the £25 million cost and the floor area as unverified and gives no completion date.
Two Sales, One Majority Stake and a £500 Million Plan
The airport has changed hands twice since 2012, and in September 2026 its owners announced a five year investment plan. The dates and the figures matter, because both are easy to misquote.
On 19 October 2011 BAA Limited announced its intention to sell, following a Competition Commission decision that required it to sell either Glasgow Airport or Edinburgh Airport. On 23 April 2012 it sold Edinburgh to Global Infrastructure Partners for £807.2 million, which the article also expresses as £1,161 million in 2025 money.
On 17 April 2024 Vinci SA announced an agreement to acquire a 50.01 percent shareholding for £1.27 billion, with GIP retaining 49.99 percent. The transaction was concluded on 25 June 2024. Dividing the stake price by the share gives an implied value of about £2.54 billion for the whole airport, which is arithmetic on the published figures rather than a valuation stated in the article.
On 21 September 2026 Vinci and GIP announced that they would invest £500 million over the next five years. The plan covers an expanded check in hall, expanded arrival facilities, an expanded baggage reclaim area and departure lounge, and new areas for food and drink. That is an announcement, not a finished building: the article gives no construction start, completion date or breakdown of the sum.
16,970,685 Passengers on 120,927 Movements
In 2025 the airport handled 16,970,685 passengers and 120,927 aircraft movements, increases of 7.5 percent and 3.6 percent on 2024. The statistics table gives 15,780,353 passengers and 116,693 movements for 2024.
Two descriptions of 2024 appear in the article and they do not match exactly. The opening text says 15.8 million passengers in 2024, a 10 percent increase on 2023. The statistics table gives 15,780,353 for 2024 and 14,396,794 for 2023, an increase of about 9.6 percent, arithmetic on the two table figures. Both are reported here, because quoting one without the other is choosing a version rather than reporting the source.
The long run is steeper than the last two years. In 1985 the airport handled 1,578,000 passengers on 36,926 movements. The pandemic broke the line: 3,474,879 passengers in 2020 and 3,024,960 in 2021, on 43,634 and 39,457 movements. The article notes that scheduled flights were suspended for periods during 2020 because of the COVID-19 pandemic. Recovery took the airport to 14,396,794 in 2023 and 15,780,353 in 2024, and in December 2024 it became the first airport in Scotland to record over 15 million passengers in a calendar year.
Movements tell a different story from passengers. The 2025 figure of 120,927 was still below the 2019 level of 127,335, even though passengers were well above the 2019 level of 14,737,497. The airport is carrying more people with fewer flights, the same pattern the article describes for 2014.
| Year | Passengers | Aircraft movements |
|---|---|---|
| 1985 | 1,578,000 | 36,926 |
| 1997 | 4,214,919 | 99,352 |
| 2014 | 10,160,004 | 109,545 |
| 2019 | 14,737,497 | 127,335 |
| 2020 | 3,474,879 | 43,634 |
| 2021 | 3,024,960 | 39,457 |
| 2022 | 11,250,211 | 93,004 |
| 2023 | 14,396,794 | 111,335 |
| 2024 | 15,780,353 | 116,693 |
| 2025 | 16,970,685 | 120,927 |
Thirty Five Airlines and a Short Haul Centre of Gravity
The article describes 35 airlines flying to more than 152 international destinations. The route tables show where the weight sits: Dublin, Amsterdam, Paris, Doha and the London airports, with a thinner long haul layer across the Atlantic.
Dublin is the busiest international route in 2025 with 788,784 passengers, followed by Amsterdam with 751,969 and Paris Charles de Gaulle with 499,517. Doha is fourth with 373,727, down 2 percent, which makes it the busiest long haul route in the table and the clearest sign of how the Gulf connection serves the airport.
The domestic table is led by London Heathrow with 1,089,492 passengers, then London Stansted with 723,196, Belfast International with 517,412, London Gatwick with 451,265 and Bristol with 436,664. Five London airports appear in the domestic top ten, which shows how much of the traffic stays inside the United Kingdom.
The long haul map is narrow but real. United Airlines flies to Newark and Washington Dulles with seasonal Chicago O'Hare. Delta Air Lines flies to New York JFK with seasonal Atlanta and Boston. American Airlines and JetBlue are seasonal to New York and Boston, Virgin Atlantic to Orlando, and Air Canada and WestJet cover Canada.
The eastern map is thinner. Hainan Airlines flies to Beijing Capital. Emirates flies to Dubai, Qatar Airways to Doha, Turkish Airlines to Istanbul and Pegasus Airlines to Istanbul Sabiha Gökçen. The European list is the bulk of the schedule, carried by large easyJet, Ryanair and Jet2.com programmes alongside Aer Lingus, Air France, KLM, Lufthansa, Finnair, Brussels Airlines and Iberia Express.
There is no Southeast Asian destination in the airline table, and no Philippine destination anywhere in it. Seasonal winter routes include Chambéry, Innsbruck, Salzburg, Grenoble and Turin, so the year has a summer season and a winter season.
| Rank | Destination | Passengers | Change on 2024 |
|---|---|---|---|
| 1 | Dublin | 788,784 | up 7 percent |
| 2 | Amsterdam | 751,969 | up 10 percent |
| 3 | Paris Charles de Gaulle | 499,517 | up 9 percent |
| 4 | Doha | 373,727 | down 2 percent |
| 5 | Tenerife South | 362,386 | up 4 percent |
| 6 | Copenhagen | 280,574 | up 3 percent |
| 7 | Barcelona | 268,386 | up 27 percent |
| 8 | Frankfurt | 257,262 | steady |
| 9 | Alicante | 249,926 | steady |
| 10 | Geneva | 244,051 | up 10 percent |
| Rank | Destination | Passengers | Change on 2024 |
|---|---|---|---|
| 1 | London Heathrow | 1,089,492 | down 6 percent |
| 2 | London Stansted | 723,196 | up 4 percent |
| 3 | Belfast International | 517,412 | steady |
| 4 | London Gatwick | 451,265 | down 5 percent |
| 5 | Bristol | 436,664 | down 3 percent |
| 6 | London City | 333,312 | down 1 percent |
| 7 | London Luton | 318,694 | down 6 percent |
| 8 | Birmingham | 300,226 | up 10 percent |
| 9 | Belfast City | 126,670 | down 3 percent |
| 10 | Southampton | 82,130 | down 1 percent |
A Tram Since 2014 and Still No Railway Station
Edinburgh Trams opened in May 2014 and gave the airport its first rail connection. The airport still has no dedicated railway station, and the heavy rail link planned for it was cancelled in 2007.
The tram is light rail, not a train. From the airport it runs east through the western suburbs and the city centre, then north to Leith, terminating at Newhaven. The airport is the other terminus, so a passenger can reach the centre without changing.
Rail passengers change instead of through running. Edinburgh Gateway station is nearby and serves as an interchange with the trams. The tram line also connects the airport to Edinburgh Park railway station. Those two stations are the route from the airport to the national rail network, and the article names no other.
A direct heavy rail link was planned and then cancelled. The Edinburgh Airport Rail Link project was cancelled in 2007 because of increasing costs. That is why the tram, not a train, is the fixed track connection today.
The bus map is wider. Ember runs to Aberdeen, Dundee, Fife, Fort William and Inverness. Scottish Citylink runs to Glasgow, Oban, Stirling and West Lothian. Stagecoach South Scotland runs to Fife, Xplore Dundee runs to Dundee, and Lothian Buses runs local services. A coach park handles the long distance operators.
By road the airport is on the A8, reached from the M8 and M9 and from the M90 by way of the Queensferry Crossing. It sits on the motorway network at the western edge of the city, so a van does not cross the centre to reach the terminal.
Edinburgh Trams since May 2014. Airport to Newhaven through the western suburbs, the centre and Leith.
No station at the airport. Change at Edinburgh Gateway or Edinburgh Park. The direct rail link was cancelled in 2007.
Ember, Scottish Citylink, Stagecoach, Xplore Dundee and Lothian Buses, plus a coach park.
The honest version. The tram fixed the airport's missing rail link in 2014, but it is a city line, not a main line. A passenger going to Glasgow, Aberdeen or London still changes at a station.
Rank 34 Among the World's Mid-sized Airports
TIME and Statista placed Edinburgh 34th in the World's Best Mid-sized Airports for 2027. The tier is a size band, not a claim that the airport is the thirty fourth best in the world at every scale.
A mid-sized ranking measures different things from a passenger count. An airport of this size is judged on how quickly a passenger clears the building, how far the walk is and whether the ground transport works. The article makes the record visible: one terminal from 1977, extended rather than replaced, one runway, and a tram that arrived thirty seven years after the terminal opened.
The airport is the busiest in Scotland and the sixth busiest in the United Kingdom. For a buyer the distinction is practical: Edinburgh has reach, but not the frequency of a hub, so a shipment routed through it will usually connect somewhere else.
Three Cargo Carriers and a Long Road From Tagum City
The article lists three cargo carriers at Edinburgh: ASL Airlines France to Paris Charles de Gaulle and Teesside, DHL Aviation to Leipzig/Halle, and FedEx Express to Paris Charles de Gaulle and Teesside.
No cargo tonnage figure appears in the article. Passenger and movement totals are published year by year; freight is not. That absence is stated rather than filled with an estimate.
The cargo map is short and European. Two of the three carriers use Paris Charles de Gaulle, two use Teesside, and one uses Leipzig/Halle. There is no freighter route to Asia in the table. A garment shipment from the Philippines would therefore arrive in the belly hold of a passenger aircraft, or connect through a European or Gulf hub before reaching Edinburgh.
There is no nonstop service between Edinburgh and the Philippines. The airline table lists no Philippine destination and no Southeast Asian destination at all. A journey from Manila or Cebu changes aircraft at least once, and the plausible change points are the ones the table names: Dubai, Doha, Istanbul, Amsterdam, Paris, Frankfurt or London.
RB Advertising is a manufacturer based in Tagum City and Cagayan de Oro, in the Philippines. It produces corporate uniform, industrial workwear, sublimated performance garments and branded merchandise programmes. The distance to Edinburgh shapes every quote. Production has to be planned, because a top up mid contract travels as a small shipment and pays the same fixed costs as a full order.
The traffic mix points to buyers in hospitality, tourism, retail, education, facilities management and professional services. A hotel group, a visitor attraction or a campus orders uniforms as a programme, and needs a reorder that matches two years later.
The honest position. Edinburgh is a smaller market than London, and a Philippine factory does not win on landed cost against a supplier inside the United Kingdom. It wins on programme consistency, documentation and a price that holds across a multi year agreement. For a Scottish buyer the calculation is whether those three things are worth a longer lead time.
Frequently Asked Questions About Edinburgh Airport
Where is Edinburgh Airport?
At Ingliston, 6 miles or 9 kilometres west of Edinburgh city centre, just off the M8 and M9 motorways and on the A8 road. The M90 is reachable by way of the Queensferry Crossing.
How many runways does Edinburgh Airport have?
One, 06/24, asphalt, 2,558 metres or 8,392 feet. A second runway, 12/30, was withdrawn from use on 29 March 2018. The article gives no length or surface for 12/30.
When was the airport built and when did it open to passengers?
The site opened in 1916 as Turnhouse Aerodrome, a military airfield used by the Royal Flying Corps. Commercial traffic was officially opened on 19 May 1947 with a British European Airways C47 service from London Northolt to Shetland.
When did the current terminal open?
Queen Elizabeth II officially opened it on 27 May 1977. Construction started in March 1975 and the building was designed by Sir Robert Matthew. It has been extended since rather than replaced.
How many passengers use Edinburgh Airport?
16,970,685 in 2025 on 120,927 aircraft movements, up 7.5 percent and 3.6 percent on 2024. The statistics table gives 15,780,353 passengers and 116,693 movements for 2024. The lead text describes 2024 as 15.8 million and a 10 percent rise, while the table implies about 9.6 percent.
Who owns Edinburgh Airport?
Vinci SA holds 50.01 percent and Global Infrastructure Partners holds 49.99 percent. Vinci agreed to buy the majority stake for £1.27 billion on 17 April 2024, and the transaction was concluded on 25 June 2024.
Is there a railway station at Edinburgh Airport?
No. There is no dedicated station. Edinburgh Gateway station serves as an interchange with the trams, and the tram also connects the airport to Edinburgh Park railway station. A direct heavy rail link was cancelled in 2007 because of increasing costs.
When did the tram start and where does it go?
Edinburgh Trams opened in May 2014 and gave the airport its first rail connection. The line runs east through the western suburbs and the city centre, then north to Leith, terminating at Newhaven. The airport is the other terminus.
Does Edinburgh Airport have nonstop flights to the Philippines?
No. The airline table lists no Philippine destination and no Southeast Asian destination. A journey from Manila or Cebu changes aircraft at least once, and the named change points include Dubai, Doha, Istanbul, Amsterdam, Paris, Frankfurt and London.
Which is the busiest route from Edinburgh?
London Heathrow is the busiest domestic route with 1,089,492 passengers in 2025. Dublin is the busiest international route with 788,784, ahead of Amsterdam with 751,969.
What cargo airlines serve Edinburgh?
ASL Airlines France to Paris Charles de Gaulle and Teesside, DHL Aviation to Leipzig/Halle, and FedEx Express to Paris Charles de Gaulle and Teesside. The article publishes no cargo tonnage figure.
What is the £500 million plan announced in 2026?
On 21 September 2026 Vinci and Global Infrastructure Partners announced £500 million of investment over five years, covering an expanded check in hall, arrival facilities, baggage reclaim area and departure lounge, plus new food and drink areas. The article gives no construction start or completion date.
Talk to the RB Advertising Team
Four channels, one sales desk. Tell us what you are making, where it ships, and when you need it.
Fastest route for quotes, samples and production questions.
Chat on WhatsAppBusiness hours: Mon to Sat, 8:30 AM to 5:00 PM
