Rank 28 World's Best Large Airports 2027

London Gatwick Airport (LGW): One Main Runway, Two Terminals and a Station Under the South Concourse

43,242,000 passengers in 2024 on a single runway. Gatwick sits in Crawley, West Sussex, 30 miles south of Central London, and runs almost all of its traffic on one strip, 08R/26L. The second runway is 200 metres away, too close to use at the same time, so for most of the day it works as a taxiway. The railway station is next to the South Terminal.

IATA / ICAO LGW EGKK, elevation 203 ft
Passengers 2024 43,242,000 second in the United Kingdom
Movements 2024 265,358 takeoffs and landings
Main runway 3,316 m 10,879 ft, 08R/26L
Distance to London 30 miles 48 km to Central London
Runway layout at Gatwick, drawn to scale in length and separation Main runway 08R/26L at 3,316 metres, secondary runway 08L/26R at 2,565 metres, 200 metres apart, both 45 metres wide. 08R 26L 08L 26R 3,316 m main runway, 45 m wide 2,565 m secondary runway, normally a taxiway 200 m 12 m shift approved 2025
Drawn to scale. The strips are 200 metres apart. That gap is why the airport is described as single runway: it is too narrow for simultaneous use, so 08L/26R is a standby strip and a taxiway for most of the day.
08R/26L

The Runway Does Most of the Explaining

Gatwick handles more passengers than most two-runway airports in Europe, and it does it with one usable runway. The numbers that matter are the takeoff run available, the gap to the standby strip and the share of departures that go west.

The main runway is 3,316 metres long and 45 metres wide. The planning figure is the takeoff run available, which is shorter: 3,255 metres west on 26 and 3,159 metres east on 08. The standby runway is 2,565 metres both ways. The strips are 200 metres apart, centreline to centreline, which is not enough for independent parallel operations. During normal operations the northern strip is a taxiway. That is the design, not an emergency measure.

Nearly three quarters of takeoffs, 74 percent over a 12 month period, go west on 26. Wind and noise preferential routes both push traffic that way. When the wind reverses, the airport turns around, and the northern strip can be used if the main runway is out of service. The main runway has a Category III instrument landing system, which allows arrivals in very low visibility. The northern strip has no ILS. When it is used, arrivals take a satellite based RNAV approach if the aircraft and operator are approved, or a surveillance radar approach with heading and altitude callouts from the controller.

Runway data
Item08R/26L08L/26R
Physical length3,316 m (10,879 ft)2,565 m (8,415 ft)
Takeoff run available3,255 m west, 3,159 m east2,565 m both directions
Width and separation45 m wide, 200 m apart45 m wide, 200 m apart
Normal roleAll takeoffs and landingsStandby and taxiway
Approach aidCategory III instrument landing systemNo ILS, RNAV or surveillance radar approach

Until March 2017 Gatwick held the title of the world's busiest single use runway, with a maximum of 55 aircraft movements an hour. In 2015 it became the first single runway airport to handle more than 40 million passengers in a year. A single strip can be pushed a long way with dense scheduling, but it has no spare capacity when weather or an incident interrupts the flow.

Single runway record 40 million passengers a year, first in the world, 2015

On 3,316 metres of asphalt, with a standby strip that is normally a taxiway.

Terminals

Two Terminals, One Landside Shuttle and No Airside Link

The South Terminal is the older and larger building. The North Terminal opened in March 1988. They are connected on the landside by a 0.75 mile automated shuttle. Once you pass security, there is no connection at all.

The South Terminal covers 160,000 square metres and the North 98,000, so the older building is still the bigger one. The South has 32 gates with jetbridges and 7 remote gates. Its central pier opened on 9 June 1958 with 11 aircraft stands, and the building was one of the first airports in the world to use an enclosed pier design, where passengers walk under cover to a waiting area near the aircraft. Its modular structure was intended to allow phased expansion, and it did.

The North Terminal has 31 gates with jetbridges, three of which can take an Airbus A380. Construction began on land earmarked for a second runway in the May 1970 draft plan. It was the largest construction project south of London in the 1980s, at a cost of 200 million pounds. Pier 6 opened on 16 May 2005 at a cost of 110 million pounds, adding 11 pier served stands and linked to the main building by the second largest air passenger bridge in the world, spanning a taxiway.

Terminal comparison
ItemSouth TerminalNorth Terminal
OpenedCentral pier 9 June 1958March 1988, by Queen Elizabeth II
Floor area160,000 m298,000 m2
Jetbridge gates3231, three A380 capable
Rail accessStation is adjacentReached by shuttle to the station
Airlines since 2017British AirwayseasyJet and most short haul

The gate count is not consistent. Published figures give 65 gates in one place and 115 in another, and the pier detail adds up to 70 by simple arithmetic. Treat the total as approximate.

The shuttle is also misdescribed as a monorail. It runs on a dual concrete track with rubber tyres, using two automatic three car driverless trains. It opened in 1987 and reopened on 1 July 2010 after a 45 million pound refurbishment, using six Bombardier CX-100 vehicles. It runs every five minutes by day and every ten minutes overnight.

If you are connecting between terminals, allow real time. The shuttle is quick, but the walk to it, the wait and the second security check are not. A passenger who lands in the South and departs from the North has to exit and be screened again.

1928 to 1958

From a Grass Aerodrome to the Beehive

Gatwick is older than its main terminal by three decades. The land was first developed as an aerodrome in the late 1920s, the Air Ministry approved commercial flights in 1933, and the first terminal, the Beehive, was built in 1935.

Scheduled services began in 1936. During the Second World War the military took the site over and it was known as RAF Gatwick. After the war it returned to civilian use. The airport proper was rebuilt in the mid 1950s, with 1956 given as the opening in one account and 30 May 1958 in another. A 1956 to 1958 reconstruction is also recorded, so the safe reading is that the rebuilt airport came into service across that period. The buildings were designed by Yorke Rosenberg Mardall between 1955 and 1988.

In the 1960s British United Airways and Dan-Air were two of the largest British independent airlines at the airport. British United was the dominant scheduled operator, Dan-Air the leading inclusive tour charter operator, and the Ministry of Aviation encouraged the growth by moving regular charter flights out of Heathrow. Caledonian Airways took over British United at the start of the 1970s, and the resulting airline, British Caledonian, became the dominant scheduled carrier for that decade and most of the 1980s. After British Airways bought it, and after Dan-Air and Air Europe collapsed, British Airways built Gatwick into a secondary hub. Its later decision to de-hub created the space for easyJet to build its largest base.

Ownership in one paragraph

The British Airports Authority and its successor BAA owned and operated Gatwick from 1 April 1966 to 2 December 2009. BAA sold to a consortium led by Global Infrastructure Partners for 1.51 billion pounds, completed on 3 December 2009. Vinci agreed in December 2018 to buy a 50.01 percent stake for 2.9 billion pounds, completed by the middle of 2019. Baroness Ford became chair in September 2023.

Passenger numbers tell the growth story. Gatwick handled 186,172 passengers in the first seven months after the 1956 to 1958 reconstruction, 368,000 in 1959 and 470,000 in 1960. It reached one million in the 1962 to 1963 fiscal year and three million in 1969 to 1970, with British United accounting for nearly half at that point. Numbers doubled to 10 million within a decade and to more than 20 million by the late 1980s.

Treaty and runway

Bermuda II, Open Skies and the Twelve Metre Decision

Two decisions shaped modern Gatwick, and neither was made by the airport. A treaty moved transatlantic traffic in and then out. A planning row that began in 1979 ended with approval to shift a runway by 12 metres.

From 1978 to 2008, restrictions on Heathrow under the Bermuda II agreement pushed a large share of United States flights to Gatwick. The EU and United States Open Skies agreement took effect on 30 March 2008 and removed the reason. Airlines moved to Heathrow, where the premium traffic wanted to be. Continental transferred its seasonal Cleveland service on 3 May 2009. US Airways ended Charlotte on 30 March 2013, leaving Gatwick without a scheduled United States airline for the first time in 35 years. Delta planned Boston in summer 2020, but the pandemic put the plan on hold. JetBlue became the first American carrier back in 2021 with New York JFK and Boston.

The long haul map that remained is hub based. Emirates flies to Dubai, Qatar Airways to Doha, Singapore Airlines to Singapore, Air China to Beijing Capital and Shanghai Pudong, China Eastern to Shanghai Pudong, and Turkish Airlines to Istanbul. These routes feed the short haul network rather than making Gatwick a transatlantic gateway.

The runway argument

An agreement not to build a second runway was made with West Sussex County Council in 1979, and by its terms it expired after 40 years. A proposal for a new runway south of the boundary was unveiled in July 2013 and shortlisted by the Airports Commission that December. In July 2015 the commission recommended expanding Heathrow instead. Gatwick disputed the finding.

The current scheme is smaller. A consultation opened on 9 September 2021 on moving the northern emergency runway north to meet the standards for regular dual runway use, raising capacity from 64 million passengers a year to 75 million. The new strip would handle takeoffs by all but the largest aircraft. The cost was put at around 2.2 billion pounds, financed privately. The Transport Secretary, Heidi Alexander, approved the 12 metre move on 21 September 2025. The High Court upheld it on 23 June 2026 and the Court of Appeal on 4 August 2026.

The phrase to be careful with is "second runway". Gatwick already has two. What has been approved is a realignment of the northern one so it can be used routinely, not a third strip. If you read that Gatwick is "getting a second runway", the number to check is 12 metres.

Routes

Spain, Dublin and Dubai: Where the Passengers Actually Go

Gatwick's route map is European and leisure led. Six of the twenty busiest international destinations in 2025 are in Spain. The largest single route carried 1,239,808 passengers, and the largest domestic route carried 476,152.

Busiest international routes, 2025
RankDestinationPassengersChange 2024 to 2025
1Malaga, Spain1,239,808up 3.5%
2Barcelona, Spain1,227,092down 9.2%
3Dublin, Ireland1,000,460down 5.0%
4Dubai, United Arab Emirates963,164up 4.1%
5Alicante, Spain854,016up 8.4%
6Rome Fiumicino, Italy822,305down 11.4%
7Faro, Portugal810,451down 5.0%
8Milan Malpensa, Italy751,460down 3.5%
9Geneva, Switzerland728,821down 4.6%
10Palma de Mallorca, Spain683,890down 5.8%

Malaga and Barcelona are effectively one market each, carrying more than a million passengers a year. Dublin at 1,000,460 is the largest non Spanish route and the only one in the top three that is not a sun destination. Dubai at 963,164 is the biggest long haul route by a wide margin and reflects Emirates rather than a British leisure market. The rest of the top twenty includes Tenerife South, Antalya, Madrid, Marrakesh, Istanbul, Amsterdam, Malta, Copenhagen, Shanghai Pudong and Nice. Shanghai is the outlier: a long haul business and student route among holiday airports.

The domestic network is Scotland and the islands

Busiest domestic routes, 2024
RankDestinationPassengers
1Edinburgh476,152
2Glasgow455,095
3Belfast International444,142
4Jersey381,611
5Belfast City277,800
6Guernsey254,601
7Inverness222,417
8Aberdeen196,469
9Isle of Man165,643
10Newquay83,252

Belfast is split between two airports. Adding Belfast International at 444,142 and Belfast City at 277,800 gives 721,942, which would put the city first by a clear margin. That is arithmetic on the published figures, not a ranking. There is no Philippine destination anywhere in the published route list. A passenger between Gatwick and Manila changes at a Gulf or European hub, or flies through Heathrow or another London airport.

Statistics

Forty Six Million, Then Six Million, Then Back Again

Gatwick's traffic history contains one of the sharpest collapses any British airport has recorded. It handled 46,574,786 passengers in 2019, 10,171,867 in 2020 and 6,260,072 in 2021. By 2024 it was back above 43 million.

Passengers, movements and freight, selected years
YearPassengersAircraft movementsFreight (tonnes)
201540,269,087267,76073,371
201745,516,700285,96996,983
201846,075,400283,926112,600
201946,574,786282,896110,358
202010,171,86779,48926,063
20216,260,07252,00011,623
202232,800,000217,52436,407
202340,894,242253,04761,123
202443,242,000265,358103,961
202542,769,000263,113120,315

The 2020 fall was 78.2 percent and 2021 fell another 38.5 percent. Recovery was fast once travel restarted: 2022 rose 423.9 percent, 2023 rose 24.7 percent and 2024 rose 5.7 percent. Then 2025 fell 1.1 percent to 42,769,000. Against 2019, the 2025 figure is down about 8.2 percent, which is arithmetic on the two published totals.

Dividing passengers by movements gives about 163 people per aircraft movement in both 2024 and 2025. The stability across the two years suggests the recovery is no longer being driven by adding flights. Movements in 2025 were 263,113, which is 2,245 fewer than 2024 and 19,783 fewer than the 2019 peak.

Freight reached 120,315 tonnes in 2025, up from 103,961 in 2024 and the highest figure in the table since 2007, when it was 171,078. The passenger business is measured in tens of millions of people while freight is measured in thousands of tonnes. Gatwick is a passenger airport with belly cargo, not a dedicated cargo hub.

Surface access

The Station Is the Front Door to the South Terminal

Gatwick Airport railway station has served the airport since 1958 and sits directly beside the South Terminal. It is on the Brighton Main Line, and it is the reason the airport can work without a dedicated express bus to central London.

Four operators use the station. Gatwick Express runs non-stopping to London Victoria and manages the station. Thameslink runs to London Bridge and through the Thameslink core to St Pancras International, Bedford, Peterborough and Cambridge. Southern runs to Victoria, London Bridge, Brighton, Eastbourne, Littlehampton, Bognor Regis and Portsmouth Harbour. Great Western Railway runs a half hourly service on the North Downs Line to Reading via Guildford. Oyster and contactless cards are accepted on all rail routes into London. Heathrow and Luton are reachable with one change, at Farringdon for the Elizabeth line and at Luton Airport Parkway for the DART.

Surface options
OptionWhere it goesWhat to know
Gatwick ExpressLondon Victoria, non-stopAdjacent to the South Terminal, contactless accepted
ThameslinkLondon Bridge, St Pancras, Bedford, Peterborough, CambridgeNorth London and the City
National ExpressHeathrow, Stansted and cities around the countryCoach services, useful for other airports
MetrobusCrawley, Horley, Redhill, Horsham, CaterhamLocal services, including the Fastway bus rapid transit route
National Cycle Network 21Horley to the north, Three Bridges and Crawley to the southPasses under the South Terminal, lift near Zone L

The airport has a motorway spur at junction 9A of the M23, which joins the main motorway one mile east at junction 9. The M25 is nine miles north. The A23 serves Horley and Redhill to the north and Crawley and Brighton to the south, and the A217 goes north to Reigate. Long and short stay car parks are on site and off site, and they are often full in summer.

National Express runs coaches to Heathrow, Stansted and cities around the country. Oxford Bus Company runs direct to Oxford, and EasyBus runs mini coaches to Earls Court and West Brompton. Local Metrobus services use the Fastway network, a partly guided bus rapid transit system described as the first of its kind built outside a major city. Route 21 of the National Cycle Network passes under the South Terminal, with a goods style lift near Zone L.

There is no direct rail link to Heathrow or Luton and no station at the North Terminal. A high speed link to Heathrow was studied under the name Heathwick, with a route parallel to the M25 covering 35 miles in 15 minutes, but the reaction was largely negative and it was not built. A later proposal called HS4Air was rejected in 2018.

Noise

Night Quotas, Quota Count and the Airline Noise Table

Gatwick does not have a full curfew, where takeoffs stop altogether. It has a night regime built on aircraft noise certification, flight counts and quota points, and it publishes an annual ranking of how its airlines perform.

Between 11 pm and 7 am, noisier aircraft rated QC/8 and QC/16 may not operate. Between 11.30 pm and 6 am, the night quota period, three limits apply at once: the number of flights, a Quota Count system that caps total permitted noise, and a ban on night QC/4 flights. An airline cannot comply by using fewer aircraft if those aircraft are louder, and it cannot comply by using quieter aircraft if it uses too many of them. Both count.

The operational response is a continuous descent approach on both runways, which keeps aircraft higher for longer and reduces the noise footprint near the ground, particularly at night. The northern runway relies on RNAV or a surveillance radar approach rather than an instrument landing system, and both can be flown with a continuous descent.

In late 2020 the airport introduced the Airline Noise Performance Table. It scores the busiest airlines on noise Quota Count per seat, continuous descent approach performance and departure track keeping against the noise preferential routes. Quota Count per seat is a calculated value. The other two are measured results expressed as percentage compliance. Track keeping violations on Lambourne departures from runway 26, route 4, are disregarded for the table. That is a deliberate exclusion, not an oversight.

In 2025 the airport added an interactive dashboard that replicates the quarterly and annual reports. It adds a column called "Final rank" whose derivation and significance are not explained. That is a fair warning about league tables generally. A rank is only as useful as the method behind it, and here the method for the final column is not published.

Security and the site

Policing the Perimeter, Chaplains and a Museum at Charlwood

The airport is policed by the Gatwick District of Sussex Police. The district is responsible for the entire airport, including aircraft, and in certain circumstances for aircraft in flight. About 150 officers are attached to it.

That number covers armed and unarmed officers and community support officers who deal with minor offences. The district runs patrols in and around the airport to counter man-portable surface-to-air missiles, and a separate sub unit carries out vehicle checks on the approaches. Access to airside areas is controlled by the airport's own security team and regulated by the Civil Aviation Authority. The police own the criminal side, the airport owns access control, and the regulator audits the process. Brook House, an immigration removal centre run by Immigration Enforcement, opened near the airport on 18 March 2009.

Gatwick is a workplace for thousands of people. It has Anglican, Catholic and Free Church chaplains, multi-faith prayer rooms and counselling rooms in each terminal, and a daily service led by one of the chaplains. A large airport operates around the clock, and the people who clean, load, screen and repair aircraft are there at hours when most of the country is asleep.

The Civil Aviation Authority Safety Regulation Group is in Aviation House. WesternGeco has its head office and its Europe, Africa and Russia offices in Schlumberger House, a 124,000 square foot building near the South Terminal. Fastjet has its registered and head offices at Suite 2C in First Point. GatwickConnects, the free connection service for passengers whose airlines do not provide one, began in 2013 and was rebranded on 15 September 2015.

The Gatwick Aviation Museum sits to the northwest of the airfield near the village of Charlwood. It holds original items and photographs from Gatwick's history along with a variety of military aircraft, and it is open Friday, Saturday and Sunday all year round. The original terminal, the Beehive, survives inside the City Place Gatwick office complex. Airlines that once had offices there include BEA and British Airways Helicopters, Jersey Airlines, Caledonian Airways, Virgin Atlantic and GB Airways.

Safety record

Seven Events That Changed Procedures

Gatwick's accident record is short, and each entry is specific. Each one changed a procedure, a check or a piece of equipment. The largest loss of life near the airport happened on approach, not on the airfield.

1959: the Viscount at Newdigate

On 17 February 1959 a Turkish Airlines Vickers Viscount 794D on an international charter flight crashed in heavy fog at Newdigate in Surrey after striking trees on approach. Fourteen of the 24 people on board died. The Turkish prime minister, Adnan Menderes, was among the survivors. The accident underlined how quickly a stable approach can become an unstabilised one when visibility falls.

1969: the Ariana 727 at Fernhill

On 5 January 1969 a Boeing 727-113C operating Ariana Afghan Airlines Flight 701 from Frankfurt crashed into a house at Fernhill near Horley in low visibility. The flaps had not been extended to maintain flight at final approach speed. Forty eight of the 62 people on board died, along with two on the ground. It remains the worst accident associated with the airport.

1972 and 1975: two hard lessons

On 28 January 1972 a British Caledonian Vickers VC10 arrived on a short ferry flight from Heathrow, where it had been diverted because of fog at Gatwick. It touched down on runway 08, spoilers and reverse thrust were applied, and the aircraft became airborne again, bounced twice and landed heavily. The airframe was bent out of shape. Repairs were judged uneconomic, and the aircraft was cannibalised for parts before being scrapped at Gatwick in 1975. On 20 July 1975 a British Island Airways Handley Page Dart Herald departing for Guernsey lifted off after a 2,490 foot ground run, stayed airborne for 411 feet with the gear retracting, then settled back onto the runway. The investigation found the gear was retracted before the aircraft was established in a climb, and that the flap setting and takeoff speed were wrong. None of the 45 occupants were hurt.

2014, 2018 and 2020

On 29 December 2014 a Virgin Atlantic Boeing 747-400 bound for Las Vegas lost hydraulic fluid. The crew returned to Gatwick and found that an improperly installed actuator had stopped the right wing landing gear from deploying. The aircraft landed on three main landing gear bogies and returned to service on 11 January 2015.

Between 19 and 21 December 2018 reports of drone sightings close to the runway closed the airport. All flights were suspended for about six hours on 19 December. The airport reopened at 03:01 the next morning, then closed again about 45 minutes later after another reported sighting. By 00:15 on 21 December about 110,000 passengers and 760 flights had been affected. The army was deployed to assist the police. The runway reopened with limited capacity around 06:00, and flights were suspended again from 17:10 to 18:23. A man and a woman were arrested and released without charge on 23 December, with Sussex Police saying they were no longer suspects.

On 26 February 2020 a Titan Airways Airbus A321-211 reported an engine surge after takeoff. Moments later the other engine stalled. The aircraft landed safely back at Gatwick 11 minutes after departure. The Air Accidents Investigation Branch found that fuel contamination following defective maintenance had gone undetected for two days. Safety recommendations went to the European Union Aviation Safety Agency, and changes were made by organisations including Airbus and the International Air Transport Association.

The pattern is maintenance and approach discipline, not runway length. A jammed gear, a wrong flap setting, a contaminated fuel load and an unstable approach are all system failures. They are also the reason checklists exist and why they are read aloud.

Procurement

What Gatwick Means for a Philippine Apparel Programme

RB Advertising makes apparel in Tagum City and Cagayan de Oro, in the Philippines. Gatwick is not a factory town and it is not a garment market. It is a passenger airport serving a large leisure and business region, and the useful question is what that region buys and how a Philippine supplier reaches it.

The airport sits in the Gatwick Diamond, the economic corridor between Crawley and Gatwick itself. The employment base is airlines, ground handlers, retail, hotels, security, facilities management, logistics and the offices around City Place. Those are all uniform-wearing employers. Ground handlers need high visibility outerwear. Hotels need housekeeping, front desk and food and beverage uniforms. Security firms need durable shirts and trousers. Facilities teams need workwear that survives daily washing.

What is specific is the scale and the churn. A campus with tens of thousands of daily passengers and thousands of staff consumes uniforms continuously, and a rebrand or a contract change can replace a whole wardrobe on a fixed date. That is the kind of order a manufacturer can plan for.

How freight actually reaches the region

Gatwick handled 120,315 tonnes of freight in 2025. That is a real number and it is small next to the passenger operation. The airport is not a dedicated cargo hub, and the published route list contains no Philippine destination. A Philippine shipment does not fly direct to Gatwick. It flies to a hub such as Dubai, Doha, Istanbul or Singapore and connects, or it travels by sea to a United Kingdom container port and moves by road.

That routing has consequences. Air freight is fast but expensive per kilogram, which suits samples, urgent replenishment and high value technical garments. Sea freight is slow but cheap per unit, which suits a full production run. A programme that mixes the two, air for the launch and sea for the bulk, usually lands in a better place than one that chooses a single mode for everything.

What we can and cannot do

We can build a programme, document the specification, keep the shade consistent across reorders and produce to a date. We can handle sublimation, compression and rashguard construction as well as woven and knitted uniform pieces. We cannot match a British decorator on a 48-hour rush job, and we do not hold a warehouse in the United Kingdom.

The honest fit is a buyer who plans a season ahead and wants the same product twice, not a buyer who needs one hundred shirts by Friday.

Ask where the fabric is woven, not just where the garment is sewn. Ask what happens to the pattern if the mill changes. Ask for shade numbers and a physical swatch card, because a screen rendering is not a colour match. Ask how a repeat order is handled six months later, and make sure the labels and fibre content are correct for the United Kingdom. Those questions are more useful than a price list. A cheap first order that cannot be repeated is not cheap.

RB Advertising Manufacturer in Tagum City and Cagayan de Oro

Corporate uniforms, workwear, sublimation and performance garments, produced to a documented specification.

Questions

Frequently Asked Questions About London Gatwick Airport

How many runways does Gatwick have?

Two, 08R/26L and 08L/26R. Only the main runway is normally used. The strips are 200 metres apart, too close for simultaneous operations, so the northern runway is a standby strip and a taxiway for most of the day.

How long are the runways at Gatwick?

The main runway is 3,316 metres or 10,879 feet. The northern runway is 2,565 metres or 8,415 feet. Both are 45 metres wide. The takeoff run available on the main runway is 3,255 metres west and 3,159 metres east.

Which terminals do British Airways and easyJet use?

British Airways moved all flights to the South Terminal and easyJet consolidated in the North Terminal on 25 January 2017.

How do you get between the North and South terminals?

On a 0.75 mile elevated automated shuttle every five minutes during the day and every ten minutes overnight. It is landside and also links the North Terminal to the railway station. The terminals are not connected past security.

Is there a train station at Gatwick Airport?

Yes. Gatwick Airport railway station is adjacent to the South Terminal and has served the airport since 1958. It is on the Brighton Main Line and is used by Gatwick Express, Thameslink, Southern and Great Western Railway.

How far is Gatwick from central London?

30 miles or 48 kilometres south of Central London, in Crawley, West Sussex. Gatwick Express runs non-stopping to London Victoria, and contactless and Oyster cards are accepted into London.

Does Gatwick have a night curfew?

Not a full ban. Between 11 pm and 7 am, QC/8 and QC/16 aircraft may not operate. Between 11.30 pm and 6 am there are limits on flight numbers, a Quota Count cap on noise and a ban on night QC/4 flights.

Why is Gatwick called a single runway airport when it has two runways?

The runways are only 200 metres apart, which is insufficient for simultaneous use. The northern strip is normally a taxiway and can only be used when the main runway is out of service.

Is Gatwick getting a second runway?

It already has two. On 21 September 2025 the Transport Secretary approved moving the secondary runway 12 metres so it can be used regularly. The High Court upheld the decision on 23 June 2026 and the Court of Appeal on 4 August 2026. The scheme is estimated at 2.2 billion pounds and is not yet built.

How many passengers use Gatwick?

43,242,000 in 2024 and 42,769,000 in 2025, on 265,358 and 263,113 movements. It was the second busiest airport in the United Kingdom in 2024 and the tenth busiest in Europe.

Which airlines are based at Gatwick?

British Airways is the hub carrier. BA EuroFlyer, easyJet UK, Jet2.com, Norse Atlantic UK, TUI Airways, Vueling and Wizz Air UK are listed as operating bases. It is easyJet's largest base.

Are there flights from Gatwick to the Philippines?

No nonstop service appears in the published route list. Passengers connect through a Gulf or European hub. Freight follows the same pattern and totalled 120,315 tonnes in 2025.

What happened at Gatwick in December 2018?

Reports of drone sightings closed the runway from 19 to 21 December. About 110,000 passengers and 760 flights were affected, the army was deployed, and two people were arrested and later released without charge.

How many gates does Gatwick have?

The published figures are inconsistent. One gives 65 gates, another gives 115, and the pier counts add up to 70 by arithmetic. Treat the total as approximate.

Next step

Talk to the RB Advertising Team

Four channels, one sales desk. Tell us what you are making, where it ships and when you need it.

WhatsApp +63 946 048 0491

Fastest route for quotes, samples and production questions.

Viber +63 946 048 0491

Preferred by most Philippine corporate buyers.

Open in Viber
Phone +63 946 048 0491

Call the desk directly for time critical programmes.

Call the desk
Email sales@phshirt.com

Best for specifications, artwork and purchase orders.

Email export sales

Business hours: Mon to Sat, 8:30 AM to 5:00 PM