Rank 36 World's Best Large Airports 2027

London Stansted Airport (STN): The 1991 Foster Terminal, One Runway and the Low Cost Model That Filled It

Stansted is London's third busiest airport and, as of 2022, the fourth busiest in the United Kingdom. Almost everything about it follows from a decision taken in 1985: build a terminal for 15 million passengers beside a wartime runway, and refuse the second runway. What opened six years later is a square of eleven bays by eleven bays with its services buried underground, filled by short haul, high frequency, price sensitive traffic.

IATA / ICAO STN / EGSS Uttlesford, Essex
Opened 1943 as a bomber base
Passengers 2024 29,694,000 table figure, see note
Movements 2024 201,031 about 551 a day
Runway 3,049 m one, 04/22
From central London 31 miles 37 miles by road
Plan grid of the 1991 terminal at Stansted, eleven bays by eleven bays A square grid of eleven columns and eleven rows. One bay is filled red. Three thin leader lines point to notes about the bays, the buried services and the roof trusses. 11 bays 11 bays One bay of the grid Eleven bays each way, 1991 Services run below Not in the concourse ceiling Roof on inverted trusses Each truss base is a utility pillar
The 1991 terminal in plan. A square grid of eleven bays by eleven bays, with the building services moved underground so the concourse could stay open and legible.

01 The building

A Square of Eleven Bays, With the Services Buried Below

The terminal that opened in 1991 was not designed as a shed with a roof over it. It was designed as a structural grid, and the grid is the architecture.

Foster Associates, founded by Norman Foster, designed the building. Structural engineering was led by Peter Rice at Ove Arup and Partners, and John Laing built it between 1988 and 1991 for 100 million pounds. It opened to the public in 1991 and received the European Union Prize for Contemporary Architecture, the Mies van der Rohe Award, in 1990.

The original building was a square of eleven bays by eleven bays. The roof is a space frame carried on inverted pyramid trusses, and each truss rests on a base the design calls a utility pillar. That pillar provides indirect uplighting, carries the air conditioning, water, telecommunications and electrical services, and holds the roof up. Putting that machinery below the floor left a naturally lit hall with a clear span, and let a passenger walk from the car park through check in and security to the gates on one level.

A railway branch was built at the same time, with the station at ground level within the terminal, directly below the main concourse. A 1988 proposal by Foster and the artist Brian Clarke to clad the east and west elevations in stained glass along the full 162 metre length was dropped for technical and security reasons. A smaller 1991 commission followed, two friezes and a six metre glass tower; the tower was removed by 1994 and the friezes later.

02 The plan

Three Satellites, Fifty Two Gates and a Two Mile People Mover

There are no departure gates in the main terminal. Every flight leaves from one of three satellite buildings, and how you reach your satellite decides how long the walk takes.

Check in and the concourse run along the front, departures towards the southern end and international arrivals at the northern end. The airport has 52 gates with 12 serviceable jetbridges, plus four bussing gates accessed from below the main terminal.

Satellite buildings and gate access
BuildingGatesAccessUsed by
Satellite 11 to 19Transit, about 4 minutesBritish Airways, Emirates, Pegasus, TUI and Jet2
Satellite 229 to 39 and 81 to 88Transit or walkway, about 7 to 10 minutesAJet, Ryanair, Transavia and easyJet
Satellite 340 to 59Walkway, about 15 minutesRyanair only. No jetbridges

Satellite 1 has ten jetbridges, at gates 1, 2, 3, 4, 6, 7, 12, 13, 16 and 19, while gates 5, 11, 14, 15 and 18 have airbridges with steps at the end. Only four of the satellite 2 jetbridges were in service as of October 2024, at gates 30 and 88, 31 and 87, 33 and 37, and gates 27 and 28 are bus gates on the ground floor. Satellite 3 has no jetbridges at all. The transit system is a free automated people mover running two miles on dual concrete tracks with Adtranz C-100 and CX-100 vehicles, accessible only airside, and it is due to be decommissioned in 2027 and replaced with pedestrian bridges.

Choose your airline, choose your walk

The satellite assignment is effectively an airline assignment. Ryanair at satellite 3 is the longest walk and Emirates at satellite 1 the shortest ride. If mobility is a concern, ask which satellite the flight uses before booking.

03 1943

A Bomber Base With a Maintenance Depot Attached

Stansted did not begin as a civil airport with a wartime past. It began as a United States Army Air Forces heavy bomber base, and the maintenance work done there mattered as much as the aircraft that flew from it.

The airfield opened in early July 1943 with a dedication ceremony and a parade of the builders: the 825th and 850th Engineer Aviation Battalions of the United States Army, with a small group of British Royal Engineers who had offered to help. The article's infobox gives 7 August 1943 as the opening date while its text says early July, and both are recorded here rather than reconciled.

The station was allocated to the Eighth Air Force in August 1942 as a heavy bomber airfield. It was also an Air Technical Services Command maintenance and supply depot, concerned with major overhauls and modification of B-26 Marauders, and a 1944 photograph shows a B-26 of the 344th Bomb Group there. After D-Day those activities moved to France, but the base stayed a supply storage area for aircraft supporting the campaign.

The Americans withdrew on 12 August 1945. The Air Ministry used the site for storage under No. 263 Maintenance Unit, and between March 1946 and August 1947 it housed German prisoners of war. In November 1946 the cargo airline London Aero and Motor Services moved in with ex RAF Handley Page Halifaxes and stayed until it was wound up in July 1948. The Ministry of Civil Aviation took control in 1949, the United States military returned in 1954 to extend the runway in case the site went to NATO, and the airport passed to the British Airports Authority in 1966. Through the 1960s, 1970s and early 1980s the eastern side housed the Fire Service Training School.

04 The third airport

Cublington, Maplin, and the Site That Kept Being Spared

For thirty years Stansted was the airport London kept in reserve. It was studied, shortlisted, rejected and reconsidered, and every argument was about where the third London airport should go.

Stansted had been held in reserve since the 1950s. After a public inquiry at Chelmsford in 1966 and 1967 the government set up the Roskill Commission. It sat from 1968 to 1971, did not shortlist Stansted, and recommended Cublington in Buckinghamshire. The Conservative government under Ted Heath then backed a minority recommendation for Foulness in the Thames Estuary, later renamed Maplin, and the incoming Labour government under Harold Wilson cancelled Maplin in 1974 because of the economic situation.

Stansted was then considered by the Advisory Committee on Airports Policy and the Study Group on South East Airports, and was selected from a shortlist of six in December 1979. The proposal was a new terminal beside the existing runway, plus land safeguarded for a second runway. It went to the Airports Inquiries of 1981 to 1983. The Inspector's Report appeared in 1984, and the white paper of 1985 approved development in two phases to raise capacity to 15 million passengers a year, and rejected the second runway. That decision is the origin of almost every constraint described on this page.

Outline planning permission followed in 1985 for a terminal able to handle up to 15 million passengers. Phase one was designed for 8 million and phase two for 15 million. Anything beyond that was assumed to need a second major terminal, which is why the later runway proposals were treated as a change of policy rather than an extension of the original plan.

05 The numbers

From One Million to Twenty Nine Million, and Back Again

Stansted's traffic history is a low cost carrier curve. It stayed small for decades, climbed after 1997, peaked in 2007, fell for five years, then climbed to a higher peak than the first.

In 1988 over 1.1 million passengers passed through, the first time the annual total exceeded one million. By 1997 it was over 5 million and by 2000 almost 12 million. Numbers peaked at nearly 24 million in 2007, declined to around 17.5 million in 2012, then recovered to 24.3 million in 2016, which made Stansted the fourth busiest airport in the United Kingdom.

Passengers, movements and freight, selected years
YearPassengersMovementsFreight, tonnes
200011,878,190165,779167,823
200723,779,697208,462203,747
201217,472,699143,511214,160
201928,139,051199,925224,139
20207,536,86986,107254,573
20217,145,80293,316263,631
202327,951,291179,135251,864
202429,694,000201,031294,355

The pandemic produced the sharpest fall in the table. In 2020 the airport served just over 7.5 million passengers against the levels before the pandemic of around 28 million, and footfall was down 95 percent against 2019. Cargo operations saw a 53 percent increase. Recovery ran to 23,289,652 in 2022, 27,951,291 in 2023 and 29,694,000 in 2024.

The article gives two figures for 2024. Its infobox lists 29,760,000 passengers and 179,135 movements. Its table lists 29,694,000 passengers and 201,031 movements. The 179,135 figure matches the table's 2023 movement count, which suggests the infobox carries a stale number. This page uses the table and does not average the two.

Some arithmetic, offered as arithmetic rather than as a published statistic: 201,031 movements across 365 days is about 551 a day. 29,694,000 passengers across 365 days is about 81,353 a day. Passengers divided by movements gives about 148 per movement. Freight reached 294,355 tonnes in 2024, and in 2016 Stansted was the third busiest freight airport in the United Kingdom behind Heathrow and East Midlands.

06 The model

Ryanair's Largest Base, and the Carriers That Came and Went

Stansted is a base for European low cost carriers. That explains the route map, the satellite assignments, the walking distances and the absence of a long haul network that survives more than a few years at a time.

The airport serves over 180 destinations across Europe, Asia and North Africa. It is the largest base for Ryanair, with over 150 destinations served by that airline alone. Jet2.com, Ryanair and TUI Airways are all based here. As of 2022 Stansted was the fourth busiest airport in the United Kingdom after Heathrow, Gatwick and Manchester, and during the pandemic in 2021 it ranked second in the country, which says more about the collapse of long haul traffic elsewhere than about growth here.

The low cost model arrived in force after 1997, and the traffic curve above is the result. The airport was configured around it: no gates in the main building, satellites reached on foot or by people mover, and a concourse designed to move people quickly rather than to hold them.

easyJet is the clearest illustration of how exposed a base airport is. It announced the closure of its Stansted base in August 2020. The base had existed for more than a decade and had more than two dozen routes, and it closed because the pandemic removed the demand that made a secondary London base worthwhile, not because the airport was unattractive.

What a base airport means for a supplier

A base airport has based aircraft, based crews and based engineering. Those are buyers for uniforms, workwear and branded clothing, and they buy on a franchise or seasonal schedule. The buying is repetitive, which suits a manufacturer more than a one off order.

07 Routes

Dublin First, Istanbul Second, and No Long Haul in the Top Ten

The busiest route in 2025 was Dublin at 993,744 passengers. The second was Istanbul Sabiha Gökçen at 964,152. Neither is a surprise once you look at which airlines are based here.

Busiest routes, 2025
RankAirportPassengersChange
1Dublin, Ireland993,744up 4.1 percent
2Istanbul Sabiha Gökçen, Turkey964,152up 9.4 percent
3Edinburgh, United Kingdom720,275up 4.0 percent
4Rome Ciampino, Italy564,539up 0.9 percent
5Belfast International, United Kingdom562,813down 1.0 percent
6Barcelona, Spain505,957down 0.4 percent
7Alicante, Spain499,052up 2.6 percent
8Bergamo, Italy490,293down 1.8 percent
9Tenerife South, Spain474,326down 8.7 percent
10Budapest, Hungary456,267down 8.2 percent

The table is a picture of the low cost market rather than a picture of London. Dublin is the largest route because it operates as a high frequency link between two countries that share a labour market and a family network. Istanbul Sabiha Gökçen is second because Pegasus and AJet use it as a low cost gateway into Turkey and beyond. The Spanish entries are the holiday market, and Ciampino and Bergamo do for Rome and Milan what Stansted does for London.

The only Gulf route in the top twenty is Dubai at 16, with 417,773 passengers and a 4.3 percent decline. The rest are in Europe, Turkey or the United Kingdom. That is the honest shape of the airport: a very large short haul machine with a single twice daily wide body operation at its edge.

08 Long haul

Every Attempt at Long Haul Since 1987

Stansted has tried to be a long haul airport at least six times. The record is a sequence of short lived routes, collapsed airlines and one route that finally stuck.

Long haul scheduled services began in 1987 with a short lived Highland Express service to Newark Liberty via Prestwick. In the early 1990s American Airlines flew to Chicago O'Hare, but the route was unprofitable and was withdrawn in 1993. Continental Airlines ran a short lived service from Newark from 2 May 2001, which stopped shortly after the September 11 attacks.

Long haul to the United States returned in late 2005, when Eos Airlines and MAXjet Airways began all business class services to New York JFK. In 2006 MAXjet added Washington Dulles, Las Vegas and Los Angeles, and American Airlines began a daily JFK flight in October 2007. The 2000s energy crisis, the 2008 financial crisis and the credit environment that followed removed all three.

Two more attempts followed. In June 2010 Sun Country Airlines ran a seasonal weekly service to Minneapolis and St Paul with a refuelling stop at Gander, because the 737-800 could not complete a nonstop westbound flight. It operated from 11 June to 15 August 2010. In March 2009 AirAsia X began flights to Kuala Lumpur, which moved to Gatwick on 24 October 2011 and were later withdrawn. Primera Air then launched Boston, Newark, Toronto Pearson and Washington Dulles, and collapsed, leaving the routes gone by 2018.

The one that worked began in 2018, when Emirates started a daily Boeing 777-300ER service to Dubai International. It has since increased to twice daily, and it works because Dubai is a connecting hub, so the flight does not depend on point to point demand between Essex and the Gulf. The rest of the map is thin: Turkish Airlines to Istanbul, Royal Jordanian to Amman, Royal Air Maroc to Casablanca, Air Algérie to Algiers and Arkia to Tel Aviv. British Airways is withdrawing, with Florence ending on 11 April 2027.

09 Ground

A Station Under the Concourse and the M11 at the Gate

Stansted has a rail station inside the terminal, directly below the main concourse, which is rare for an airport serving London. It has had that connection since the building opened.

The Stansted Express runs to Liverpool Street every 15 minutes, with a usual journey time of 45 to 53 minutes. Liverpool Street is served by the Underground and the Elizabeth line, and the train also calls at Tottenham Hale for the Victoria line. Some services call at Stansted Mountfitchet, Bishop's Stortford or Harlow Town. CrossCountry runs hourly to Birmingham New Street via Cambridge, Peterborough and Leicester, and Greater Anglia runs to Norwich via Cambridge.

National Express and Flibco run express coaches to London from a bus station next to the terminal. National Express also runs direct coaches from Luton Airport and Heathrow, and from Birmingham, Oxford, Norwich and Cambridge. Essex Airlink and First Essex cover Southend on Sea, Chelmsford, London Southend Airport, Colchester, Braintree and Basildon.

By road the airport is connected to north east London and Cambridge by the M11, and to Braintree, Colchester and Harwich by the A120. The road distance to London is 37 miles against 31 miles as the crow flies, which is why the train usually wins. Parking includes long, mid and short stay, plus valet and meet and greet. As of October 1996 there were 2,500 short stay spaces within walking distance and over 8,000 long stay spaces near the M11 and A120 junction, linked by a courtesy bus; those are historical figures, not current capacity. The express drop off near the short stay car park charges a fee, the free drop off is in the mid stay area, and Terminal Road North closed shortly after MAG took over in 2013.

10 Expansion

The Second Runway That Never Happened, and the Third of a Terminal That Is

Stansted has spent more than thirty years arguing about a second runway. The argument is settled for now, and the money has moved to the building: a 600 million pound extension to the 1991 terminal.

On 11 March 2008 the British Airports Authority submitted a planning application known as G2 to expand the airport by three square miles and build a second runway and terminal, in line with the 2003 Air Transport White Paper. If approved, it would have allowed Stansted to handle more passengers than Heathrow did at the time. The White Paper expected a runway by 2011, the application said 2015, and in 2009 the date moved to 2017. Before the May 2010 election all three major parties pledged not to approve it. The application was withdrawn on 24 May 2010, after nearly 200 million pounds had been spent on the inquiry and on buying properties.

Stop Stansted Expansion had been formed in 2002 as a working group of the North West Essex and East Herts Preservation Association. In September 2012 the government set up the Airports Commission under Sir Howard Davies. It concluded that an additional runway was needed for the South East and that it should go to Heathrow or Gatwick, and its final recommendation in 2015 was Heathrow.

In July 2023 MAG announced a three bay extension to the existing terminal, increasing its size by a third at an expected cost of 600 million pounds. It adds 16,500 square metres and raises capacity from 35 million to 43 million annual passengers. The Planning Inspectorate approved it on 1 November 2023. The design includes a larger departure lounge, an enlarged security hall, new shops, bars and restaurants, new baggage carousels, new check in desks and next generation security scanners. The transit system is due to be retired in 2027 and replaced with walkways, the immigration hall will move downstairs, and a 14.3 megawatt solar farm is part of the programme. Construction was planned to begin in 2025 and last two to three years, and the wider 1.1 billion pound plan is expected to add 200 flights a day and over 5,000 jobs over five years.

Two cancellations explain the shape of the airport. Satellite 4 was approved in 1999 as part of a strategy to take capacity from 8 to 15 million passengers, revised in 2005, never built, and its site became remote stands in 2018. A 130 million pound arrivals terminal, announced in December 2016 and intended to give Stansted separate arrivals and departures buildings, was put on hold in 2019, refused by Uttlesford District Council in 2020, approved on appeal in 2021, and cancelled in 2023 in favour of extending the existing building.

11 Security

The Airport Britain Sends Hijacked Aircraft To

Stansted has a role that has nothing to do with holiday traffic. The United Kingdom government has designated it as the preferred airport for any hijacked aircraft requesting to land in the country.

The reason is the layout. The design allows a hijacked airliner to be isolated well away from terminal buildings and runways, so the airport can keep operating while negotiations are carried out, or even while an assault or rescue mission is under way. For that reason Stansted has been involved in more hijack incidents than might be expected for an airport of its size.

On 27 February 1982 an Air Tanzania Boeing 737-2R8C landed after being hijacked on an internal flight from Mwanza to Dar es Salaam and flown to the United Kingdom via Nairobi, Jeddah and Athens, where two passengers had been released. The hijackers demanded to speak to the exiled Tanzanian opposition politician Oscar Kambona. The request was granted, and after 26 hours on the ground they surrendered. On 6 February 2000 an Ariana Afghan Airlines Boeing 727 with 156 people on board was hijacked and flown to Stansted via Tashkent and Moscow. After a four day stand off the hostages were freed. Nine hijackers were jailed, their convictions were quashed in 2003, and in July 2004 a court ruled they could not be deported.

On 22 December 1999 Korean Air Cargo Flight 8509, a Boeing 747-200F, crashed shortly after take off because of pilot error. All four crew were killed, and the aircraft came down in Hatfield Forest near Great Hallingbury. On 30 March 1998 an Emerald Airways Hawker Siddeley HS 748 carrying Leeds United was brought down immediately after take off when its starboard engine exploded; 40 passengers were on board, 18 of them from Leeds, and only two were injured.

On 24 May 2013 Pakistan International Airlines Flight 709 from Lahore was escorted by RAF Typhoons after being diverted from Manchester, and on 21 September 2013 SriLankan Airlines Flight UL503 inbound to Heathrow was escorted to Stansted after a diversion. In 2008, 57 people were arrested after the group Plane Stupid broke through the barriers and created a stockade on a taxiway, which resulted in 52 flights being cancelled. In March 2018 activists delayed a deportation flight to Nigeria, and fifteen of them were found guilty of intentional disruption of services at an aerodrome.

12 Philippines

No Nonstop to Manila, and What That Means for a Shipper

The route list for Stansted does not include a nonstop passenger service to the Philippines. A Philippine traveller reaches London through a Gulf or European hub, and a Philippine supplier reaches the United Kingdom the same way.

The useful connections in the record are Dubai and Istanbul. Emirates operates Dubai International twice daily from Stansted, and Turkish Airlines operates Istanbul. Both are large hubs with onward connections into Asia, and the European network from Stansted, including Amsterdam and Paris Charles de Gaulle, provides the alternative.

Air cargo is a different map. The operators listed are AirZeta to Almaty, Frankfurt and Seoul Incheon, Cargolux to Luxembourg, China Southern Cargo to Guangzhou, Emirates SkyCargo to Brussels and Dubai Al Maktoum, FedEx Express to Dublin, Frankfurt, Memphis and Paris Charles de Gaulle, Qatar Airways Cargo to Doha, Turkish Cargo to Istanbul, and UPS Airlines to Cologne Bonn, Hong Kong, Louisville and Philadelphia. The East Asian points in that list are Hong Kong, Guangzhou and Seoul Incheon. Manila is not among them, so a Philippine shipment connects through one of those airports or a Gulf cargo hub before it reaches the United Kingdom. That is an inference from the route list, and it is the kind of thing to confirm with a freight forwarder.

What a UK buyer can source here

RB Advertising is a manufacturer in Tagum City and Cagayan de Oro, in the Philippines. We make corporate uniforms for office, front desk, retail, security and facilities roles; industrial and high visibility workwear for airside, warehouse, construction and logistics work; technical and performance garments including sublimation, compression and rashguard construction; and branded merchandise produced to a date. An airport of this size buys all of those categories for security, cleaning, retail, catering, fire service, engineering and ground handling staff.

What makes a programme work is the reorder rather than the first order. A security contract runs for three years and the guards need the same shirt in the same navy in month thirty. A hotel refurbishment opens on a date that does not move. An airport concession changes its retail uniform across a dozen outlets in a fortnight. Those are the situations where a manufacturer with its own production line is more useful than a decorator with a catalogue.

We need a specification, a size set, a colour reference and a date. If there is a logo, send vector artwork rather than a photograph of an old garment. If the garment is for airside use, say whether it has to meet a high visibility standard, because that changes the fabric and the construction. Sizing is the most common source of delay: the United Kingdom does not use the same scale as the Philippines, so send measurements rather than size labels.

The limits are worth stating plainly. We hold no stock in the United Kingdom, we cannot match a local decorator on a same week rush, and we cannot put a representative in Essex at short notice. A sea shipment takes weeks, and air freight costs enough that it suits samples or a launch that cannot wait. A buyer with a single small order and a two week deadline should use a local supplier. A buyer with a multi site programme, a defined specification and a date four months out is the buyer we can help.

13 Questions

Frequently Asked Questions About London Stansted Airport

Where is London Stansted Airport?

Near Stansted Mountfitchet, in the district of Uttlesford, Essex, England. It lies 31 miles north east of central London, and the road distance is 37 miles.

Which airlines are based at Stansted?

Jet2.com, Ryanair and TUI Airways. Stansted is the largest base for Ryanair, with over 150 destinations served by that airline, and the airport serves over 180 destinations in total.

How many terminals does Stansted have?

One main passenger terminal, opened in 1991, plus three satellite buildings containing the gates. There are no gates in the main terminal, and the airport has 52 gates with 12 serviceable jetbridges.

Who designed the Stansted terminal?

Foster Associates, founded by Norman Foster, with structural engineering led by Peter Rice at Ove Arup and Partners. John Laing built it between 1988 and 1991 for 100 million pounds, and it won the Mies van der Rohe Award in 1990.

How do I get from Stansted to central London?

The Stansted Express runs to Liverpool Street every 15 minutes, with a usual journey time of 45 to 53 minutes. Coaches also run to London, Luton, Heathrow, Birmingham, Oxford, Norwich and Cambridge.

How many passengers did Stansted handle in 2024?

The traffic table gives 29,694,000. The infobox gives 29,760,000. The article is not consistent on this figure, and both numbers are recorded rather than averaged.

Does Stansted have a second runway?

No. The airport has one runway, 04/22, which is 3,049 metres of grooved asphalt. A second runway was proposed in the G2 application of 2008, which was withdrawn on 24 May 2010.

Why is Stansted used for hijacked aircraft?

The government has designated it as the preferred airport for hijacked aircraft requesting to land in the United Kingdom, because the layout allows an aircraft to be isolated away from terminals and runways.

What happened to Korean Air Cargo Flight 8509?

It crashed shortly after take off from Stansted on 22 December 1999 because of pilot error. The Boeing 747-200F came down in Hatfield Forest near Great Hallingbury, and all four crew were killed.

Is there a direct flight from Stansted to the Philippines?

No nonstop passenger service to the Philippines appears in the route list. Passengers connect through Dubai, served twice daily by Emirates, or Istanbul, served by Turkish Airlines.

Where does Stansted rank in the TIME list?

It is ranked 36 in the TIME World's Best Large Airports 2027 list.

When did Stansted open as a military airfield?

The text says early July 1943, and the infobox gives 7 August 1943. It was allocated to the Eighth Air Force in August 1942 as a heavy bomber airfield and also served as a B-26 maintenance depot.

What is the terminal expansion at Stansted?

A three bay extension costing 600 million pounds, adding 16,500 square metres and raising capacity from 35 million to 43 million annual passengers. It was approved on 1 November 2023, with construction planned from 2025.

How many gates does Stansted have?

52 gates with 12 serviceable jetbridges across three satellite buildings, plus four bussing gates accessed from below the main terminal.

Next step

Talk to the RB Advertising Team

Four channels, one sales desk. Tell us what you are making, where it ships, and when you need it.

WhatsApp +63 946 048 0491

Fastest route for quotes, samples and production questions.

Viber +63 946 048 0491

Preferred by most Philippine corporate buyers.

Open in Viber
Phone +63 946 048 0491

Call the desk directly for time critical programmes.

Call the desk
Email sales@phshirt.com

Best for specifications, artwork and purchase orders.

Email export sales

Business hours: Mon to Sat, 8:30 AM to 5:00 PM