Korea rewrote its economic government on 2 January 2026. The former finance ministry was split, and the Ministry of Finance and Economy (MOFE) kept the money, the currency, the tax code and the offshore finance file. This page sets out what MOFE now decides, how the concessional money it governs through the Economic Development Cooperation Fund reaches Philippine roads, bridges and power, what the Philippines Korea free trade agreement changed at the tariff line, and why Korean manufacturers are adding Philippine capacity in the ecozones, in Luzon and increasingly in Mindanao.

02 Jan 2026 MOFE opens at Government Complex Sejong after the finance ministry split
US$2.01B EDCF new approvals targeted each year under the 2026 to 2028 plan
11,164 Philippine product lines on Korea's duty free or reduced schedule, 87.4 percent of imports
Mandate Register

The Korean Ministry That Holds the Money, the Rate and the Offshore Finance File

MOFE is not a trade ministry and it does not register foreign investment. It sets the macro and financial conditions under which a Korean company decides where to build. Read the mandate row by row, because the function that moved away in January 2026 is the one most investors still assume sits here.

MOFE functions after the January 2026 reorganisation
FunctionWhere it sits nowWhy a Philippine investor notices
Economic policy formulation and coordinationMOFESets the growth stance, the inflation response and the direction of the won against the peso and the dollar
Currency, foreign exchange and international financeMOFEDrives hedging cost, capital flow rules and the terms on which Korean capital leaves the country
National treasury and government accountingMOFEGoverns sovereign borrowing, bond issuance and the guarantee capacity behind overseas projects
TaxationMOFEWrites the corporate and international tax positions, including treaty treatment of Philippine income
Oversight of public institutionsMOFECovers the development finance bodies and the policy lenders that run Korean overseas programmes
Economic cooperation and state owned propertyMOFEHosts the bilateral economic committees where Philippine and Korean agencies settle project pipelines
Budget, funds, fiscal policy and national debtMinistry of Planning and BudgetA cofinanced package or a fiscal support line now needs the second ministry as well
Mid and long term national strategyMinistry of Planning and BudgetIndustrial strategy documents that frame outbound manufacturing support are prepared there
Private investment policyMinistry of Planning and BudgetPublic private partnership rules and project preparation support sit with the new ministry
Korea's stated frame for this period is the 3.4.5 Vision: a 3 percent potential growth rate, a place among the world's top four exporters, and US$50,000 per capita income. Exports reached a record US$496.3 billion in the first half of 2026, which is the backdrop against which outbound manufacturing capacity is being planned.
Structural Change

What the January 2026 Split Changes for a Korean Exporter

The reorganisation separated the money side from the budget side. For a company moving production offshore, the practical effect is a two door process: macro and finance questions still go to MOFE, while fiscal support and project preparation now go to the Ministry of Planning and Budget.

Stays with MOFE

The money and the rate

  • Economic policy coordination and the inflation response.
  • Currency, foreign exchange and international finance.
  • National treasury, government accounting and state property.
  • Tax policy, including international tax positions.
  • Oversight of public institutions and policy lenders.
  • Economic cooperation and the EDCF management committee.
Moved to Planning and Budget

The budget and the strategy

  • Mid and long term national strategy.
  • Fiscal policy and the national debt.
  • Budget and fund preparation and execution.
  • Performance management of spending.
  • Private investment policy and project preparation.

For a Korean manufacturer eyeing a Philippine plant, three things did not change. The won still trades on policy set at MOFE, the concessional window that finances Philippine infrastructure still reports to MOFE, and the tax treaty position that governs dividend and interest flows still sits with MOFE. What changed is the counterpart for a fiscal support request, which is now the Ministry of Planning and Budget rather than the finance ministry of the past.

Development Finance

How EDCF Money Reaches Philippine Projects

The Economic Development Cooperation Fund is Korea's concessional loan window, established on 1 June 1987 and operated by the Export Import Bank of Korea on behalf of MOFE. Terms run from 0.01 to 2.5 percent a year for up to 40 years, including a grace period of up to 15 years. Procurement is tied to eligible source countries, and on the largest Philippine projects the bidding is limited to Korean companies.

Station 01 · Seoul

MOFE sets the envelope

The ministry approves the medium term plan and chairs the EDCF management committee. The 2026 to 2028 plan targets about KRW 3 trillion, roughly US$2.01 billion, a year in new approvals, with artificial intelligence, cultural infrastructure and critical minerals added as priorities.

Station 02 · Manila

The counterpart signs

The Philippine Department of Finance signs the loan agreement for the government, while the implementing agency runs procurement. On the Laguna Lakeshore Road Network and the Panay Guimaras Negros bridge, MOFE confirmed in October 2024 that each carries a record US$1 billion facility.

Station 03 · Site

The corridor is built

Roads, bridges, flood control and power reach the industrial land where factories sit. Korean contractors and suppliers win the tied packages, and Philippine subcontractors, fabricators and service firms join the delivery chain.

Why a garment factory should care about a bridge: the Panay Guimaras Negros project alone covers 32.47 kilometres of sea crossing and connecting road. Power reliability, port access and truck travel time are the three line items that decide whether an export order lands on schedule, and all three are shaped by this pipeline.
Tariff Ledger

The Philippines Korea Free Trade Agreement in One Ledger

The agreement is the commercial counterpart to the finance relationship. It entered into force a year earlier than expected, on 31 December 2024, the 75th anniversary year of diplomatic ties. These are the entries a buyer or a factory manager needs.

Signed
7 September 2023, on the sidelines of the ASEAN summit in Jakarta.
Ratified
Philippine Senate concurred on 23 September 2024. The Korean National Assembly ratified in November 2024.
In force
31 December 2024, implemented on the Philippine side by Executive Order No. 80, series of 2024.
Korea's schedule
11,164 Philippine product lines get duty free or reduced treatment, worth US$3.18 billion or 87.4 percent of Korean imports from the Philippines.
Philippine schedule
96.5 percent of lines liberalised, including automobiles and electric vehicles. Full implementation runs to 2038.
Origin paperwork
Certificate of origin or an approved exporter declaration, with product specific rules of origin for textiles and apparel. Bureau of Customs guidelines followed on 6 January 2025.
Fallback routes
The ASEAN Korea agreement and RCEP remain available. The bilateral schedule is usually the better rate, so confirm the route line by line before you quote.
Safeguards
Trade remedies and standards rules continue to apply. Origin claims can be verified after release, so keep costed production records for the audit window.

For apparel, the operational point is documentation rather than duty. A Korean buyer importing teamwear, uniforms or rash guards from a Philippine plant should see the origin certificate, the bill of materials and the cost build before the first shipment, because an origin claim that cannot be supported turns into an assessment later.

Investment Tally

Where Korean Capital Already Sits in the Philippines

Korean investment in the Philippines is not a proposal, it is an installed base. The economic zone authority counts Korea as its leading investor nationality, and the largest single approval of the CREATE MORE era belongs to a Korean electronics group.

180+ Korean companies operating inside PEZA ecozones
₱120B+ Invested by those companies, supporting more than 43,000 Filipino employees
16.12% Korea's share of PEZA approved investments from January to May 2025, the top nationality

The flagship is Samsung Electro Mechanics Philippines, which received the first presidential incentive granted under CREATE MORE for a ₱50.7 billion expansion in Calamba. The plant produces automotive multilayer ceramic capacitors, already employs more than 7,000 people and accounts for nearly half of the group's worldwide output of that component. The expansion adds more than 3,500 jobs, with commercial operations targeted for July 2027.

The incentive environment behind those numbers is set out in Republic Act No. 12066, the CREATE MORE Act, signed on 8 November 2024 and effective on 28 November 2024. Registered enterprises under the enhanced deduction regime pay 20 percent corporate income tax. The special corporate income tax remains at 5 percent on gross income earned. The income tax holiday runs four to seven years, and the total incentive period now reaches 17 to 27 years, with a further extension available for labour intensive projects. The additional deduction on power expenses doubled to 100 percent, which matters most to energy heavy manufacturing. Complete incentive applications carry a 20 day turnaround commitment.

Filing speed has a second channel. The Board of Investments Green Lanes programme had approved 176 strategic projects worth over ₱4.54 trillion by December 2024, covering renewable energy, digital infrastructure, manufacturing and food security. A Korean investor with a strategic project can ask for that route instead of the standard queue.

Manufacturing Base

The Mindanao Manufacturing Base and What It Can Absorb

Korean cost pressure and the tightening supply of industrial land in Vietnam are pushing manufacturers to look again at the Philippines. Mindanao is the part of the country where land, power and labour costs still leave room for a competitive export factory, and where an established apparel plant can take a pilot order while a larger site is being prepared.

Main plantMankilam, Tagum City
Second siteIponan, Cagayan de Oro
Core processesSublimation, cut and sew, embroidery, screen print, DTF
Product familiesTeamwear, uniforms, activewear, corporate gifts, bags
Uniform minimum12 pieces
Business hoursMon to Sat, 8:30 AM to 5:00 PM

Where the cost advantage actually sits

Three inputs decide an export garment factory: labour, power and freight. Mindanao wages sit below Metro Manila rates for comparable skill levels, the regional grid has added capacity since the coal and hydro build out, and the island carries three international cargo gateways at Davao, Cagayan de Oro and General Santos. Add an English speaking workforce and a school system that produces ready technical staff, and the recruitment curve for a new line is shorter than in most competing sites.

What a Korean buyer can place here now

The plant already produces sublimated jerseys and full team kits, corporate and school uniforms, rash guards and grappling apparel, outerwear, bags and promotional merchandise. A Korean sports club, school, retailer or corporate buyer can run a pilot order, approve the sample, and scale into a seasonal programme without waiting for a new factory to be commissioned. Colours are matched to Pantone, and the sublimation line prints before cutting, so design changes cost a file revision rather than a production line change.

If the plan is a wholly owned plant rather than a sourcing contract, the sequence is different: register the vehicle, choose the incentive route, secure industrial land, then contract power and port access. The checklist below covers both paths.
Operating Sequence

Setup Checklist for a Korean Investor or Buyer

Eight steps, in the order they usually block a project. Each one belongs to a different Philippine agency, and doing them out of order is the most common cause of a delayed start.

  1. Register the vehicle. Incorporate with the Securities and Exchange Commission, or open a branch or representative office. Confirm the foreign equity treatment for the sector before the articles are filed.
  2. Choose the incentive route. PEZA for export manufacturing inside an ecozone, the Board of Investments for projects under the Investment Priorities Plan, or the Fiscal Incentives Review Board for large domestic projects. Confirm the CREATE MORE menu that applies to the project.
  3. Register the capital with the central bank. Inward foreign investment needs Bangko Sentral ng Pilipinas registration if capital and dividends are to be repatriated later. Keep the bank certificates.
  4. Open the tax file. Bureau of Internal Revenue registration, books, and the VAT treatment that applies to an export enterprise. Confirm the zero rating on local purchases attributable to the registered activity.
  5. Secure land and utilities. Industrial park or ecozone lot, power supply contract, water, wastewater and telecom. Check the flood history of the site, not only the lease price.
  6. Staff the line. Technical hiring in Tagum and Cagayan de Oro draws from a regional pool, with vocational and university partners available. Budget for training weeks, not days.
  7. Run the pilot order. Sample approval, size set, colour approval, quality standard, packing and carton marking. Agree the inspection method before bulk starts.
  8. Lock the logistics and origin file. Book the Davao or Cagayan de Oro leg to Busan or Incheon, and assemble the origin certificate, bill of materials and costed records that support the FTA claim.
Questions

Ministry of Finance and Economy: Frequently Asked Questions

Short answers for Korean buyers, Philippine exporters and compliance teams working across the two jurisdictions.

StructureIs MOFE the same ministry that used to be called the Ministry of Economy and Finance?

It is the successor, but the organisation changed on 2 January 2026. MOFE kept economic policy coordination, currency and foreign exchange, treasury, government accounting, taxation, international finance, oversight of public institutions, economic cooperation and state property. The Ministry of Planning and Budget was separated from it and took fiscal policy, the budget and funds, performance management, private investment and national debt.

RolesDoes MOFE approve Korean investment in the Philippines?

No. MOFE sets the macro, foreign exchange, tax and offshore finance conditions, and it governs the EDCF window. Investment registration in the Philippines runs through PEZA, the Board of Investments or another investment promotion agency. Trade policy and FTA implementation sit with the Korean trade ministry, and customs clearance sits with the Korea Customs Service.

TariffWhat did the Philippines Korea FTA change for apparel?

The agreement entered into force on 31 December 2024. Korea places 11,164 Philippine product lines on a duty free or reduced schedule, covering 87.4 percent of its imports from the Philippines by value. To claim the rate, the shipment needs a valid certificate of origin or an approved exporter declaration and must meet the product specific rule for the garment. Full implementation of both schedules runs to 2038.

CapitalIs Korean investment in the Philippines still growing?

Yes. Korea was the top investor nationality in PEZA ecozones in 2024, and from January to May 2025 it accounted for 16.12 percent of approved investments. PEZA hosts more than 180 companies with major Korean equity, over ₱120 billion in invested capital and more than 43,000 Filipino employees. The Samsung Electro Mechanics expansion in Calamba, at ₱50.7 billion, was the first project to receive a CREATE MORE presidential incentive.

LocationWhy locate in Mindanao rather than near Manila?

Land, labour and power costs are lower, the regional grid has more headroom than Luzon, and Davao, Cagayan de Oro and General Santos provide cargo gateways to Korea. The trade off is a thinner supplier base and longer inland trucking to some ports, so the site decision usually turns on whether your product is freight sensitive or labour sensitive.

OrderingCan a Korean buyer start with a small apparel order?

Yes. Uniform programmes start at 12 pieces, and teamwear, rash guards, corporate gifts and bags can be quoted at pilot volumes before a seasonal commitment. The usual path is a sample, a size set and a colour approval, then a first production run. Contact the sales desk through any of the four channels below.

Contact

Talk to Our Korea and Export Manufacturing Desk