Bacoor · 47 Barangays · 2 Districts

Sublimation Printing Services in Bacoor

Jerseys, subdivision league kits, school intramural sets, marching band performance shirts, coastal barangay uniforms, and retail crew apparel. Colour goes into the polyester fibre, so a band name or a team number survives parade season and laundry.

664,625 Residents, 2020
47 Barangays
2 Districts
12 pcs Minimum
Who orders 01

Six Groups at the Cavite Gateway

Bacoor sits between Metro Manila and the rest of Cavite, so it carries both a commuter population and a strong local culture. Subdivision leagues and school programs dominate, with marching bands and coastal barangays adding orders no other city sends. The sublimation printing catalog covers production detail if that comes first.

01

Subdivision Leagues

The Molino and Queens Row side runs the largest concentration of village leagues in the province. Orders are built per team, with a bundle label for each village so a coordinator can hand out kits without sorting.

02

School Programs

Intramural kits, recognition day shirts, and org sets. House colourways and section numbers print in one pass, and youth through adult sizing stays inside a single run.

03

Marching Bands and Drum Corps

Bacoor is known for its bands, and the city emblem carries eleven marching band figures. Performance shirts carry the band name, section colours, and member numbers, and printed fabric does not restrict movement on a parade route.

04

Coastal Barangay Teams

Zapote, Talaba, Niog, and Panapaan sit below sea level and handle humidity differently from the hills. Light polydex dries faster there, and drops are timed around access rather than assumed.

05

Mall and Retail Crews

Shops along the Aguinaldo Highway and Molino Boulevard strips order staff shirts with printed names and role colours. Printed marks stay flat under an apron and do not peel at the edge.

06

Health Workers and Volunteers

Barangay health workers, clean up crews, and feeding program volunteers order matching shirts by cluster, with bright printed panels that make a team visible in a crowd.

Rates 02

Price per Piece in Four Currencies

The peso column is what a purchase order quotes against. Conversions in dollars, euros, and pounds track the header switcher and move with the rate, so treat them as a guide rather than a fixed number.

Jersey setShirt and shorts, polydex 140 to 160 GSM
₱495.00
about $7.88 · €6.87 · £5.90
Performance shirtMicrodex, quick drying
₱320.00
about $5.10 · €4.45 · £3.85
Collared poloHoneycomb 170 to 180 GSM
₱450.00
about $7.16 · €6.24 · £5.36
League shortsPrinted side panels included
₱280.00
about $4.46 · €3.89 · £3.34

Roster names, squad numbers, and band section marks carry no surcharge. A design starts at a dozen pieces and steps down again at fifty, a hundred, and three hundred.

Fabrics 03

Five Weights for Coast and Hills

Bacoor has two climates inside one city boundary: bay humidity in the coastal barangays and dry heat on the Molino hills. The knit follows the address.

Knit selection
KnitWeightUse
Microdex140 to 150 GSMCoastal league kits and volunteer shirts
Polydex150 to 165 GSMSubdivision leagues and school intramurals
Honeycomb170 to 180 GSMSchool staff and retail collared uniforms
Interlock180 to 200 GSMBand performance shirts and heavier kits
Spandex blend200 to 220 GSMCompression pieces and stretch panels
Coverage 04

Bacoor West and Bacoor East

The city has 47 barangays split between two local electoral districts. Dispatch follows the district, and every bundle carries the barangay name on the outside. These are the barangays we ship to most often.

Bacoor West Coastal and bay side
  • Zapote
  • Talaba
  • Niog
  • Panapaan
  • Sineguelasan
  • Bayanan
Bacoor East Inland and hillside
  • Molino
  • Queens Row
  • Mambog
  • Ligas

A barangay not named here is still covered. The city has 47 in total, and the full list is confirmed when the order is booked.

Calendar 05

When Bacoor Buys Shirts

Subdivision leagues and the school year set the pace, with band season adding a distinctive stretch in the last quarter.

First quarter

League registration opens and campuses place their first orders of the year.

Second quarter

Summer league play collides with graduation and the first school opening kits.

Third quarter

Intramural season, and the rains push games under cover, which shortens practical lead times.

Fourth quarter

Parade season arrives with fiesta programs and year end tournaments. A December parade needs artwork locked in early October.

Process 06

How a Bacoor Batch Moves

Two approvals hold the line: one on the artwork, one on the payment. Between them the floor runs on its own schedule.

First

Design and size sheet

Send the band or team mark with a roster that lists sizes per member. We place the artwork and return a scaled proof.

Second

Sign off

Your signature on the proof and the deposit together lock the production week.

Third

Print and assemble

The floor takes five to seven working days, matching every name against the signed sheet.

Fourth

Handoff

One bundle per team or band section, each tagged with its barangay, then handed to the courier.

Questions 07

Bacoor Buyer Questions

Delivery, band shirts, subdivision drops, and payment.

Do you deliver to both districts of Bacoor?

Yes. The city has 47 barangays split between Bacoor West and Bacoor East, and both districts are on the dispatch list. Bundles are labelled per barangay, and subdivision drops are booked through the association or guard house before the courier leaves.

Can you make performance shirts for a marching band?

Yes, and it is one of the orders we like most here. Bands and drum corps order matching performance shirts with the band name, section colours, and member numbers. Printed marks do not restrict movement the way a heavy stitched uniform does during a parade.

How do subdivision leagues order?

Most subdivisions in the Molino and Queens Row side run several teams, so the order is built per team with a bundle label for each. A village coordinator can hand out kits team by team without opening every box.

What is the smallest order?

Twelve pieces per design. A single team, one class section, or one band section fits at that size, and several groups can share a delivery while staying separately packed and labelled.

How long does delivery to Bacoor take?

Production is five to seven working days from approval, and transit into Cavite adds three to five. Because Bacoor sits at the Metro Manila gateway, courier routes into the city are among the fastest in the province.

Which fabric suits the coastal barangays?

Coastal humidity and salt air punish heavy knits, so open courts use 140 to 160 GSM polydex. Collared school and retail uniforms use 170 to 180 GSM honeycomb, which holds shape without trapping heat.

Is there a Bacoor branch?

No. Everything is printed and sewn in Tagum City and Cagayan de Oro, then shipped into Cavite. Nothing is subcontracted locally, so the colour reference approved on the mockup is the one used on the run.

How does payment work?

Half on approval and half before release. Official receipts come with every order, and BIR 2307 details can be prepared for schools, companies, and cooperatives.

Request a Bacoor Quote

Send the barangay or subdivision, the group, the headcount, and the date. A mockup and a rate card come back, usually within one working day.

Mankilam main office, Tagum City · Ficcoville, Iponan, Cagayan de Oro City · Mon to Sat, 8:30 AM to 5:00 PM