Taguig · 38 Barangays · 2 Districts

Sublimation Printing Services in Taguig

Full dye sublimation jerseys, corporate sportsfest kits, hospital and clinic staff shirts, mall crew uniforms, village league sets, and school intramural kits delivered across Taguig. Colour is printed into the polyester itself, so a roster name or a company mark survives the season and the laundry.

1,223,595 Residents, 2020
38 Barangays
12 pcs Batch minimum
5 to 7 days Production window
Who orders here

Six Kinds of Buyer Behind the Glass Towers

Taguig runs two economies at once. One is the tower corridor around Bonifacio Global City and McKinley Hill, where companies order by headcount and by floor. The other is the residential side, where villages, schools, and parishes order by team and by family. Both are served from the same print floor. Start with the sublimation printing catalog if you want the production detail first.

01

BGC Corporate and BPO Floors

Recruitment runs, department shirts, sportsfest kits, and year end tournament sets for offices inside the tower corridor. A single order can carry six department colourways with a roster per floor, and each colourway keeps its own name list.

02

Hospitals and Clinic Staff

Department shirts, scrub style tops, and inter facility league kits for the medical teams along the BGC and Western Bicutan rows. Collars and plackets hold shape in 170 to 180 GSM honeycomb, and print inside the fibre survives industrial laundering.

03

Mall and Retail Crews

Staff shirts for the large retail centres and the dining rows, where a uniform has to look sharp through a full shift and still read clearly across a concourse. Role colour coding and printed badges replace loose pins.

04

Village and Condo Leagues

Residential leagues across the Bicutan side and the Embo barangays order basketball and volleyball sets by cluster. Batches are packed per team and labelled per barangay, so a coordinator hands out kits cluster by cluster.

05

Schools and Universities

Intramural kits, recognition day shirts, and student organisation sets. Department marks, class numbers, and sponsor blocks print in one pass, and youth through adult sizing stays inside the same run.

06

Security and Facilities Crews

Tower security, housekeeping, and construction crews need high visibility role colours and a shirt that survives daily washing. Printed reflective style bands and printed logos stay flat, so nothing catches on equipment.

Four currency pricing

Taguig Rates per Piece

The peso column is the contract price. Dollar, euro, and pound figures are approximate and follow the live currency switcher in the header. Names, numbers, and marks are inside the per piece rate.

ItemPesoApproximate
Jersey setShirt and shorts, 140 to 160 GSM polydex₱495.00about $7.88 · €6.87 · £5.90
Performance shirtMicrodex singlet or tee, moisture wicking₱320.00about $5.10 · €4.45 · £3.85
Collared poloHoneycomb, 170 to 180 GSM₱450.00about $7.16 · €6.24 · £5.36
Basketball or volleyball shortsMatching set piece with side panels₱280.00about $4.46 · €3.89 · £3.34

Minimum of 12 pieces per design. Volume steps begin at 50, 100, and 300 pieces for the same artwork, and freight is quoted with the batch rather than per piece.

Fabric matching

Knits Chosen for Outdoor Games and Tower Shifts

Taguig play happens on covered courts and open fields, often in the wet season window, while staff uniforms are worn indoors under air conditioning. Those two conditions want different knits, and the table below is how we choose between them.

Knit weights and their best use
KnitWeightWhere it belongs
Microdex140 to 150 GSMFun runs, volunteer shirts, outdoor warm up sets
Polydex150 to 165 GSMVillage league sets, school intramural kits
Honeycomb170 to 180 GSMCorporate staff shirts, hospital departments, mall crews
Interlock180 to 200 GSMVarsity sets that need opacity and a heavier drape
Spandex blend200 to 220 GSMCompression tops, cycling kits, four way stretch panels
Delivery coverage

All 38 Barangays, Two Delivery Sides

The city has 38 barangays after the ten Embo barangays joined in October 2023. Purely for dispatch, we split them into the Embo side and the Bicutan and Tipas side. Each batch is packed by team and labelled per barangay before it leaves the plant.

Embo side 10 barangays
  1. Cembo
  2. Comembo
  3. East Rembo
  4. Pembo
  5. Pitogo
  6. Post Proper Northside
  7. Post Proper Southside
  8. Rizal
  9. South Cembo
  10. West Rembo
Bicutan and Tipas side 28 barangays
  1. Bagumbayan
  2. Bambang
  3. Calzada
  4. Central Bicutan
  5. Central Signal Village
  6. Fort Bonifacio
  7. Hagonoy
  8. Ibayo Tipas
  9. Katuparan
  10. Ligid Tipas
  11. Lower Bicutan
  12. Maharlika Village
  13. Napindan
  14. New Lower Bicutan
  15. North Daang Hari
  16. North Signal Village
  17. Palingon
  18. Pinagsama
  19. San Miguel
  20. Santa Ana
  21. South Daang Hari
  22. South Signal Village
  23. Tanyag
  24. Tuktukan
  25. Upper Bicutan
  26. Ususan
  27. Wawa
  28. Western Bicutan
Season planning

Four Quarters, Four Buying Waves

Corporate orders follow budget quarters, school orders follow the academic calendar, and the village leagues follow the summer season. Planning by quarter is the simplest way to place a batch ahead of the date that matters.

First quarter

New budget, new kits

Companies release annual budgets and order department shirts and sportsfest kits early, while village leagues register teams for the summer season.

Artwork by mid January
Second quarter

Summer leagues and graduations

League play peaks, school programs close out with recognition days, and the city marks its foundation date on April 25 and the patronal feast on July 26.

Artwork 4 weeks ahead
Third quarter

Intramurals and wet season

School intramurals and university festivals land here, and outdoor games move to covered courts when the afternoon rain arrives.

Artwork by early July
Fourth quarter

Year end tournaments

Corporate tournaments, holiday events, and village finals all converge, and this is the busiest production window of the year.

Artwork by mid October
Order flow

From Mockup to Taguig Loading Bay

Four steps, each one closed with a written approval before the next begins.

Step 01

Brief and mockup

Send the mark, the roster, and the event date. A mockup returns with knit weight, colour reference, and sizing advice for the group.

Step 02

Approval and downpayment

Approve the mockup in writing and settle the 50 percent downpayment. The batch takes the next free production slot.

Step 03

Print, cut, and sew

Production runs 5 to 7 working days in house, with the roster checked against the approved sheet before packing.

Step 04

Pack and dispatch

Batches are bundled per team and per barangay, then released to courier or cargo. Tower drops are booked with the loading bay in advance.

Before you order

Taguig Buyer Questions

The questions that come up most from admin officers, HR teams, facilities managers, and league coordinators.

Do you deliver to all 38 barangays of Taguig?

Yes. Tracked courier and cargo dispatches cover all 38 barangays, including Fort Bonifacio and the BGC towers, the Bicutan and Signal Village side, the Tipas barangays along the river, and the ten Embo barangays. Tower deliveries are scheduled with the building loading bay and dropped by appointment.

What is the minimum order for a Taguig batch?

Twelve pieces per design, with individual names and numbers included at no extra charge. A single corporate run can cover several departments with different colourways, and each colourway keeps its own roster sheet.

How long does production and delivery take?

Production takes 5 to 7 working days after mockup approval, then 3 to 5 working days transit to Metro Manila by LBC, J&T, AP Cargo, or 2GO. Rush orders can move by air freight into NAIA when an event date is close.

Which fabric suits Taguig outdoor play and wet season rain?

For court and field play use 140 to 160 GSM polydex or microdex, which moves air and dries quickly between downpours. For collared staff uniforms worn indoors in BGC towers, 170 to 180 GSM honeycomb keeps a crisp collar through a full shift.

Do you have an office in Taguig or BGC?

No. Production runs in our Tagum City plant and the Cagayan de Oro facility, then ships to your address or tower loading bay in Taguig. Nothing is subcontracted to a local print shop, so the colour reference and roster stay in one production line.

Can you handle corporate sportsfest kits for BGC offices?

Yes. One design can carry several department colourways, and rosters can be provided per floor or per team. We print tournament brackets, staff numbers, and company marks in the same run, which is how most BGC sportsfest orders are built.

What artwork do you need?

A logo at 300 DPI, the roster with names and numbers, and any sponsor or department marks. If the only file is a low resolution logo pulled from a slide deck, our design team rebuilds it before the mockup.

How do payments and official receipts work?

A 50 percent downpayment starts production and the balance settles before dispatch. Official receipts are issued, and BIR 2307 details can be added for companies, schools, and hospitals that need them.

Request a Taguig Quote

Send the barangay or tower, the program, the headcount, and the date. A mockup and a rate card come back, usually inside one working day.

Mankilam main office, Tagum City · Ficcoville, Iponan, Cagayan de Oro City · Mon to Sat, 8:30 AM to 5:00 PM