Independent market dossier

Zephyrus Wing Energies, the Polish wind platform and the Philippine component base

A Tel Aviv listed producer with 257 megawatts of operating wind in Poland, 82 megawatts of solar running since May 2026, and a pipeline of 585 megawatts of wind, 500 megawatts of solar and 400 megawatt hours of storage. The company publishes no Philippine office, project or investment. This page reads its published unit counts as procurement, and asks what a Philippine plant must prove to serve that kind of order.

Wind rose with sixteen compass points N E S W

Wind rose reference, sixteen points.
Rotor geometry is schematic, not a site measurement.

257 MW Operating wind at Potegowo, Poland
98 Turbine units on that site
115,080 Bifacial modules at Potegowo PV
589 km Cable infrastructure on the solar park
01 / Company file

What the company is, and what it is not

Zephyrus is a small pure play producer with one very large wind farm, a solar park that came online in 2026, and a development pipeline about three times the size of what it operates. Everything below is from the company's own disclosures and market reporting. The last row is the one that matters most for this page.

Legal identity
Zephyrus Wing Energies Ltd, a public company incorporated in Israel, head office at 35 Hamasger Street, Sky Tower 9th floor, Tel Aviv.
Listing
Tel Aviv Stock Exchange, ticker ZPRS. The initial public offering closed at the end of March 2021, raised NIS 145 million, and priced the company at about NIS 935 million.
Controlling shareholder
Doral Group Renewable Energy Resources holds 56.44 percent, acquired from Israel Infrastructure Fund in a transaction completed on 22 April 2025.
Self described scope
Develops, constructs and operates renewable energy assets, described by the company as a fully integrated producer, working through relationships with international construction firms, turbine and photovoltaic suppliers, and lenders.
Operating geography
Poland. Potegowo wind sits in Slupsk County in the Pomeranian voivodeship, close to the Baltic shoreline. Potegowo PV was energised in May 2026, and a Romanian hybrid portfolio was acquired during 2026.
Published contacts
Telephone +972 74 753 9132 and info@zephyrus.co.il. Investor materials sit in the investors section of the company site.
What it does not publish
Turbine make and model, the supplier roster, procurement volumes by component, local content ratios, and the component level detail of the Romanian acquisition.
Philippine presence
None published as of November 2026. No office, project, investment, supplier agreement or visit is disclosed anywhere in the company's own material.

Read this before the rest of the page. This is an independent analysis of a published business, written for Philippine manufacturers and for buyers evaluating the country. It is not affiliated with, endorsed by or authorised by Zephyrus Wing Energies, and it does not describe any announced Philippine activity by that company. Where the page states a number, it is the company's own figure or a public agency figure, and the source note at the foot of the page says which.

02 / Capacity ladder

One operating wind farm, one new solar park, and a pipeline about three times larger

Scale on this page is drawn on a single axis so that the operating assets and the development pipeline cannot be confused. Solid bars are built and producing. Hatched bars are consent, land and interconnection work in progress, and they carry no delivery date in the company's own disclosure.

Potegowo wind 257 MW
Pipeline wind 585 MW
Pipeline PV 500 MW
Potegowo PV 82 MW
Storage pipeline 400 MWh
  • Built and producing
  • Development pipeline, no delivery date published

Potegowo wind carries 98 turbines, produces about 647 gigawatt hours a year at the P50 estimate, and absorbed roughly EUR 340 million of investment. Potegowo PV adds 82 megawatts from 115,080 bifacial modules across 209 inverters, with 589 kilometres of cable infrastructure and an estimated 70,000 tonnes of carbon dioxide avoided each year. Storage is a pipeline figure in megawatt hours, and megawatt hours are not megawatts, so it is drawn on this ladder as a separate measure rather than compared against the generation bars.

03 / Bill of materials

Every unit count the company publishes is an order that went somewhere

This is the whole argument of the page in one table. A producer does not publish turbine counts and module counts because it finds them interesting. Those numbers exist because they were procured, shipped, installed and commissioned, and the next portfolio of this shape will place the same class of order again. The Philippine column records what the country can already do, and what it cannot yet document.

Published quantities are asset disclosures, not invitations to tender
ComponentPublished quantityWhat it tells a fabricatorPhilippine status
Wind turbine units98Tower sections, nacelle transport frames, and blade handling equipment at port scale.No turbine assembly. Structural steel and heavy fabrication exist for other industries.
Bifacial modules115,080Frames, mounting rails, clamps and export crates, all specified per module format.Module assembly exists. Cell production does not.
Inverters209Sheet metal enclosures, thermal management, harnesses and terminal blocks.Enclosure and harness work exists, at electronics rather than utility scale.
Cable infrastructure589 kmDrum logistics, terminations, jointing, and test labour across a wide site.Harness assembly exists. Transmission and medium voltage cable extrusion does not.
Battery storage400 MWhContainer enclosures, fire suppression housings, thermal systems, and skid steelwork.No published grid scale container assembly.
Balance of systemNot publishedTracking structures, foundations, scour protection and site cabling, usually subcontracted.Structurals and galvanising exist. Certification for wind and marine exposure does not.
04 / Capability proof

Five things a Philippine plant would have to prove before it wins a line on that table

A bill of materials is not a capability statement. Between the two sits a qualification file: welding procedure, coating system, test certificate, traceability and a delivery date somebody will hold you to. Each row below names the work, then says honestly whether the country can document it today.

Tower steel, rolling and galvanising

Tower sections are rolled, welded, blasted and hot dip galvanised to a coating specification that is audited, not merely claimed. The country has plate rolling, heavy welding and galvanising capacity serving construction and shipbuilding. What it does not publish is a wind tower line qualified to a turbine maker's own procedure, and that qualification, not the steel, is the barrier.

Adjacent capacity exists

Cable harness, jointing and test

Five hundred and eighty nine kilometres of cable is a drum logistics problem before it is a manufacturing problem. Harness assembly, crimping, labelling and continuity testing are established here for automotive and electronics customers. Medium voltage jointing and termination for wind collection systems needs certified crews and a test record, and that certification is the gap rather than the copper.

Harness work exists

Sheet metal and thermal enclosures

Inverters and battery containers are boxes with a thermal problem, a fire problem and an ingress rating. Sheet metal fabrication, powder coating and electrical enclosure assembly exist at a scale that serves electronics, food equipment and construction. Utility grade enclosure work needs ingress testing, arc flash documentation and a fire suppression housing that passes a third party standard.

Scale gap

Composite finishing and blade repair

Blades are moulded by a handful of global suppliers, and that is not a Philippine entry point. Blade repair, leading edge protection, lightning receptor service and composite structural work are a service market that follows an operating fleet, running on rope access crews, vacuum equipment and a repair log the owner accepts. The skill exists in aerospace and marine composites.

Service only

Heavy haul and port marshalling

A nacelle is not a container. Abnormal loads need route surveys, bridge assessment, escorts and a laydown area at the port of discharge. The country moves heavy cargo every day through Batangas, Subic, Cebu and Davao, and the constraint on a wind project is the last fifty kilometres and the crane, not the ocean leg.

Route capability exists
05 / Grid and auction reality

The order book is set by interconnection dates, not by ambition

A component supplier reading the Philippine market should ignore headline targets and read three things instead: what is installed, what is committed with a commercial operation date, and what sits in an auction round with a delivery window. The figures below are the January 2026 position from the Department of Energy, plus the current auction and contract counts.

23,450 MW Installed capacity across the system, January 2026
360 MW Wind installed, against 404 MW committed
66 GW Potential capacity across 92 offshore service contracts
3,300 MW Fixed bottom offshore sought in the fifth green energy auction

Wind is 1.5 percent of installed capacity, which is a small number for a country with this coastline and this wind resource. The pipeline behind it is not small. The 2026 committed pipeline runs to 26.8 gigawatts, 84 percent of it renewable, with about 1,199 megawatts of wind inside it. Offshore service contracts cover roughly 66 gigawatts of potential across 92 awards, and the fifth green energy auction is scoped at 3,300 megawatts of fixed bottom offshore capacity for delivery between 2028 and 2030. The Department of Energy's own estimate of what the 2040 target requires is about 102 gigawatts of new capacity, of which about 17 gigawatts is wind.

For a fabricator, the useful reading is a shipping window. Contracted capacity that must reach commercial operation between 2028 and 2030 has to be procured between 2026 and 2028. That is the same window in which a new plant would be qualifying its process, which means the realistic play is a subcontract, a licensed line or a joint venture inside an existing facility, not a greenfield build sold on a promise. The auction rounds also reward projects that can demonstrate delivery, so a supplier with a documented test record becomes an asset to the developer's bid rather than a cost line.

06 / Zone comparison

Where a component plant would sit, compared with the two European routes

Zephyrus builds inside the Polish system and has entered Romania, so those are the honest comparisons rather than an abstract benchmark. The differences that decide a plant are administrative, not rhetorical: who signs the registration, how long the fiscal package lasts, and whether imported components can sit in a bonded area before duty is settled.

Regime comparison, general terms, confirm each with the agency before committing capital
QuestionPhilippine routePolish equivalentRomanian equivalentPractical difference
Who registers the sitePhilippine Economic Zone Authority, or the Board of Investments for a project outside a zone.Special economic zone under the zone management company.Industrial park with state aid granted through the regional scheme.One national agency signs here. In Europe the park operator and the state aid grant are separate approvals.
Income tax positionCREATE MORE at 20 percent corporate income tax, with an income tax holiday of four to seven years.Zone relief on qualifying income, with a cap on the total aid.Regional aid with a maximum aid intensity by region.The Philippine holiday is time based and stated up front. The European route is aid intensity based and reviewed.
Foreign ownershipFull foreign equity in export enterprises above 60 percent of output under RA 11647.Full ownership available inside the zone for qualifying activity.Full ownership available inside the European Union framework.Comparable, but the Philippine route carries a paid in capital floor for the domestic market case.
Duty on imported componentsDuty free importation of capital equipment inside the registered project, with bonded warehousing for inputs.Customs procedure inside the zone with duty suspension available.Bonded warehouse or inward processing relief.The Philippine regime is simpler to explain to a buyer and slower to clear in practice at peak volume.
Destination marketASEAN, with the regional trade agreements and the European Union scheme on top.European Union internal market.European Union internal market.Different market, not a cheaper copy of the same one. A Polish plant selling into Poland is a different business from a Philippine plant selling into ASEAN.
07 / Incentive ledger

The instruments, by number, without the sales language

Six instruments matter to a component plant. Each is named by its number because the number is what an accountant and a lawyer will ask for, and because the terms change between the fiscal package and the implementing rules. This ledger is a starting point for a due diligence file, not a position on eligibility.

CREATE MORE (RA 12066) Corporate income tax at 20 percent, with an income tax holiday of four to seven years depending on tier and location, followed by either enhanced deductions or a special corporate income tax at 5 percent on gross income for ten years. The two routes are mutually exclusive and the election is made once.
RA 11647 The amended Foreign Investments Act. It allows full foreign equity in enterprises that export at least 60 percent of output, with a paid in capital floor of USD 100,000 for a domestic market enterprise that qualifies under the thresholds.
PEZA (RA 7916) 441 economic zones holding about 4,400 locators, on the zone authority's last published count. A zone locator gets the fiscal package, duty free capital equipment, zero rated local purchases and a single agency interface, in exchange for export orientation and zone rules on site and reporting.
Renewable Energy Act (RA 9513) The framework behind the service contracts, the green energy auctions and the net metering and distribution rules a project has to work inside. A supplier does not register under it, but the schedule of the projects that order from them is set by it.
Duty free capital equipment Machinery and equipment imported inside a registered project are exempt from duty, subject to the list approved with the registration. Anything outside the list, and anything bought after the commencement date, follows the ordinary tariff.
Maximum duration The income tax holiday runs four to seven years, then the special corporate income tax or enhanced deduction regime runs up to 17 years, and up to 27 years for the most qualified tier. A component plant should model the post incentive rate, not the holiday rate, because a tower line is a longer asset than the holiday.
08 / The operations workforce

A wind fleet is a crew business long after the last turbine is bolted down

Operations is where the recurring spend sits, and where the Philippine labour pool is strongest. A two hundred megawatt class fleet needs technicians on rope access, high voltage switching crews, a control room, planners and a stores function, all inside a tropical climate that changes the maintenance calendar rather than the maintenance list.

The crew model that works here is a core team plus a surge contractor. Core technicians hold electrical and mechanical qualifications, work at height certification and a switching authorisation from the owner. The surge contractor brings the crane, the blade team and the major component exchange crew when a gearbox or a main bearing has to come down, and that is a planned mobilisation, not an emergency one.

Heat and humidity move the workday. Cable terminations and composite work are scheduled for the early morning, inspection flights and rope work are scheduled around wind windows rather than office hours, and the typhoon season sets a shutdown and restart procedure that every technician rehearses before it is needed. None of that is unusual in the region, and all of it is priced into the maintenance contract.

The garment side of this is unglamorous and constant. Technical workwear for a wind and solar crew has to survive arc flash rated layering, sun exposure, salt air at a coastal site, and repeated industrial laundering without losing its reflective trim or its fit. That is a specification conversation, and it is the part of this page that describes what we actually make in Tagum City.

Technical workwear, private label

Made in Tagum City, Davao del Norte, for crews, contractors and corporate uniform programs. Fabric, trim, sizing, branding and packaging are specified per order.

₱320.00 / about $5.10 / €4.45 / £3.85 per piece

Indicative unit price for a standard program piece at volume. Final pricing depends on fabric weight, reflective trim, embroidery, packaging and order quantity. No minimum is implied by this line, and no supply relationship with any company named on this page is implied either.

09 / Four limits

What this page will not pretend

A dossier that only argues is a brochure. These four statements are the ones a careful buyer would raise in the first meeting, written down before they are asked.

No Philippine site exists for this company

Nothing here describes an announced project, office or investment. The page exists because the component demand in the published figures is real and the Philippine capability question is worth answering on its own terms.

Asset disclosures are not tender documents

Turbine and module counts are commissioning facts. They do not disclose the bill of materials, the supplier split, the local content position or the packaging specification, and no supplier should plan a line on them without a request for quotation.

Local content is set per project and per agency

Thresholds differ between the zone authority, the investment board and the auction rules, and they are negotiated inside a registration. A number quoted on a web page, including this one, is not the number that binds a project.

The Romanian portfolio is too new to read

The acquisition closed during 2026 and the component level detail is not published. Anything said about it here would be inference, so the page does not use it as evidence for a supply chain argument.

10 / Questions

Zephyrus Wing Energies and the Philippines, answered

Eight questions that come up in the first conversation, including the one about whether this page is an offer to the company. It is not.

What is Zephyrus Wing Energies?

It is a renewable energy producer listed on the Tel Aviv Stock Exchange under the ticker ZPRS, with its head office at 35 Hamasger Street in Tel Aviv. It develops, builds and operates renewable assets in Poland. Its operating portfolio is the Potegowo wind farm at 257 megawatts and the Potegowo solar park at 82 megawatts, with a further pipeline of 585 megawatts of wind, 500 megawatts of solar and 400 megawatt hours of storage under development.

Does Zephyrus Wing Energies operate in the Philippines?

No. No Philippine office, project, investment or supplier relationship is published as of November 2026. The company works in Poland and has acquired a Romanian portfolio. This page is an independent analysis written from published disclosures, and it is not affiliated with, endorsed by or authorised by the company.

Why does a Philippine page exist for a Polish wind producer?

Because the unit counts a wind producer publishes are a procurement statement. Ninety eight turbines, 115,080 modules and 589 kilometres of cable are orders that have to be placed with someone, and the question worth answering is what a Philippine plant would have to prove to win a share of that kind of order the next time it is placed.

What can a Philippine factory actually supply today?

Structural steel fabrication and galvanising, cable harness assembly and testing, sheet metal enclosures, and composite finishing exist in the country at industrial scale, mostly serving construction, electronics and automotive harness work. Turbine nacelle assembly, blade moulding, transmission cable extrusion and grid scale battery container assembly are not published capabilities. Module assembly exists, cell production does not.

Which incentives apply to a component manufacturer?

The main instruments are the Corporate Recovery and Tax Incentives for Enterprises Act, also called CREATE MORE, which sets corporate income tax at 20 percent with an income tax holiday of four to seven years, the amended Foreign Investments Act which allows full foreign equity in export enterprises above 60 percent of output, the PEZA framework across 441 zones with about 4,400 locators, and the Renewable Energy Act. Capital equipment importation is duty free inside the registered regime.

What does the grid queue mean for an order book?

It sets the date a factory can expect to ship. As of January 2026 the system held 23,450 megawatts of installed capacity, with wind at 360 megawatts installed and 404 megawatts committed. Offshore wind has 92 service contracts covering roughly 66 gigawatts of potential, and the fifth green energy auction targets 3,300 megawatts of fixed bottom offshore capacity for delivery between 2028 and 2030. A supplier should read those dates as the shipping window, not as a market forecast.

Is this an offer to supply Zephyrus?

No. Nothing on this page is a claim of a commercial relationship with the company, and no product is offered to it. The commercial part of this page is a Philippine garment and workwear line, described for what it is, for buyers who are already sourcing technical apparel in the country.

How do I start a conversation about sourcing or a site visit?

Use one of the four channels at the bottom of this page. Tell us whether you are pricing a component, evaluating the country for a plant, or buying technical workwear, and what the volumes and the delivery window look like. We answer within office hours, Mon to Sat, 8:30 AM to 5:00 PM Philippine time.

Talk to us

Price a component, test the country, or specify a crew uniform

We make corporate uniforms, technical workwear and private label apparel in Tagum City, Davao del Norte, and we host teams evaluating the Philippines for manufacturing. Tell us which of the three conversations you are in, and what the volumes and the delivery window look like. Office hours: Mon to Sat, 8:30 AM to 5:00 PM (PHT). Address: Naungayan Building, Aala Road, Barangay Mankilam, Tagum City, Davao del Norte, Philippines.

Sources and scope

Sources and scope: company description, head office, telephone, project names, turbine and module counts, inverter count, cable length, operating dates, pipeline figures and the statement that the company develops, constructs and operates in Poland follow the Zephyrus Wing Energies company site, its projects and about pages, read in November 2026. The listing year, the NIS 145 million raised and the NIS 935 million valuation follow reporting on the Tel Aviv Stock Exchange listing. The 56.44 percent shareholding follows the Doral Group announcement and market reporting on the transaction completed on 22 April 2025. The Romanian hybrid portfolio acquisition follows power sector trade reporting during 2026. Philippine capacity figures follow the Department of Energy electric power industry management bureau summary for January 2026, including 23,450 megawatts installed and wind at 360 megawatts installed against 404 megawatts committed. Offshore contract counts, the solar and wind pipeline and the fifth green energy auction scope follow Department of Energy statements and law firm commentary on the auction rounds, with the 2040 requirement estimate taken from the department's own capacity projection. Incentive terms follow CREATE MORE (RA 12066), the PEZA Act (RA 7916), the amended Foreign Investments Act (RA 11647) and the Renewable Energy Act (RA 9513). This page is an independent market analysis. It is not affiliated with, endorsed by or authorised by Zephyrus Wing Energies, and it does not describe any announced office, investment, supplier agreement or partnership between that company and any Philippine entity. Nothing here is legal, tax or investment advice. Confirm current requirements with the investment promotion agency, the zone authority, the Department of Energy and a licensed professional before committing funds.