Vienna solar and storage producer / Philippine dossier

CCE Holding and the Philippines: Solar, Storage and Manufacturing Hub

CCE Holding is a Vienna based producer of photovoltaic plants and battery storage, formed in 2021 from an Austrian and a German developer, with 5.2 gigawatts of solar and 1.8 gigawatts of storage in operation, construction or development across six European countries. This page reads that record against a market that added 899 megawatts of solar in one year, awarded 10.2 gigawatts in a single auction round, and now requires storage on every new variable renewable plant above 10 megawatts.

CCE publishes no Philippine office, project, investment or supplier agreement. Nothing on this page describes a relationship with the company. It is an independent analysis, written from public sources, for buyers and site selection teams.

10,195 MW Awarded in the fourth green energy auction, 123 projects, delivery 2026 to 2029
20 percent Storage required on every new variable renewable plant of 10 megawatts or more
3,852 MW Installed solar in the Department of Energy list as of 30 April 2026
25 GW Further capacity the department plans to auction by 2035

01 / The company

Two developers, one holding, sixteen years of project history

CCE is not a startup with a slide deck. It is the merger of Clean Capital, an Austrian photovoltaic developer founded in 2010, and enernovum, a German developer founded the same year, brought under one roof in 2021 with a German institutional investor. The company describes itself as a fully integrated independent power producer, which in practice means it keeps the development, financing, construction, operation and trading functions inside the group rather than handing them to a contractor.

2010 Clean Capital and enernovum are founded in Austria and Germany, both to invest in photovoltaic projects and energy efficiency.
2011 to 2016 Italian and German transactions build the transaction record, then own project development starts in Austria and Italy, and the first own megawatt plant is built in Austria in 2016.
2017 to 2020 Italy, the Netherlands, France and Chile. A joint venture is established in Italy in 2017, development starts in the Netherlands and France in 2018, 330 megawatts of Chilean project rights are acquired in 2019, and the La Huella plant starts construction in 2020, the year the pipeline passes one gigawatt.
2021 The holding is formed by Clean Capital and enernovum together with a German institutional investor.
2022 Omnes Capital enters through its Capenergie 5 fund, giving the group an infrastructure investor alongside the founding developers.
2023 The operating companies and a pipeline above four gigawatts are acquired from the two founders, bringing around 200 employees into the holding.
2024 to 2025 Storage moves from plan to plant. Construction starts on a 10 megawatt battery in Germany with preparation for a further 40 megawatts, and photovoltaic and battery assets are commissioned in Germany, the Netherlands, Italy and Romania.
2026 Portfolio concentration. The group sells its Romanian platform, sells a 42 megawatt Italian plant, spins out its Austrian commercial business as Volturo, and states that it will concentrate on large scale open space solar and storage in its core markets.
Legal name CCE Holding GmbH
Head office Wiedner Guertel 13, Turm 24/12, 1100 Vienna, Austria
Company register FN 562460 y, Commercial Court Vienna
VAT identifier ATU77268868
Telephone +43 50 264 0
Country units Austria, Germany, Italy, France, the Netherlands, Romania
Model Fully integrated independent power producer, development through trading
Investors Founding developers and a German institutional investor, with Omnes Capital through Capenergie 5 since 2022

02 / The operating chain

Six functions kept inside the group, and what each one buys

The value of an integrated producer to a supplier is not the headcount. It is that one organisation controls the specification at six points, so a component that clears the engineering gate can be carried into every project the group builds. Read the six functions as six procurement gates rather than as a corporate brochure.

03 / The portfolio by country

Where the steel, the modules and the containers actually went

The published project list is a map of built assets rather than a pipeline chart. It is useful because each country shows a different buying pattern: commercial rooftops in Austria, grid scale storage in Germany, ground mounted and agricultural solar in Italy, former landfill and polder sites in the Netherlands, and a Romanian platform that was built and then sold as a whole.

Selected projects and country activity, from the CCE project and location pages read in November 2026.
CountryWhat was built or heldWhat it tells a supplier
AustriaCommercial and industrial rooftop and ground systems for TCG Unitech at Rohr, AMAG Austria Metall, Grimmenstein, danubia Speicherei, AGRU Kunststofftechnik, EurothermenResort Bad Schallerbach, Bernegger, Burg Design, Raiffeisenbank Steyr, Autohaus Pichler and Apex. The commercial business became Volturo on 28 September 2026.Small systems, many sites, high specification and short installation windows. A supplier here wins on documentation and delivery reliability rather than on price alone.
GermanyBESS Halle, the first grid connected battery, at 12.5 MVA installed power and 22.8 MWh installed capacity, with 11.11 MW and 21.05 MWh guaranteed, supplied by Intilion. Commercial rooftops for Netto Marken Discount, Rinn Beton at three sites, Hemslingen, FIM Unternehmensgruppe, Otto Vollmann and Rollermarkt Nuernberg.The container, power conversion and control package is bought as a system from an EPC partner. The enclosure, harness and thermal work behind that package is the addressable scope for a new market entrant.
ItalyGround mounted and agricultural solar since 2010, with Servigliano, Ardea, Ponzano, IGEP, Berchidda and Belpower. Montalto di Castro, 42 megawatts on 43.5 hectares with single axis tracking, about 67 gigawatt hours a year and 80 percent of output under a ten year power purchase agreement, completed November 2025 and sold to Iberdrola in April 2026.Utility scale ground mount with tracking, which is a steel, pile, cable and harness order far larger than a rooftop programme and far more sensitive to freight cost.
NetherlandsA former landfill at Rafelder, Marknesse, and a battery at the 's Heer Arendskerke solar park in Zeeland, where the permit is granted and the design is complete. The country unit buys ready to build projects when the permits and the funding are already in place.Difficult ground and constrained grid connections reward mounting systems that need less civil work and containers that can be sited on a small footprint.
FranceProject development since 2018, managed from Paris through CCE France, with ground mounted solar in the national market.A second mature European market with its own permitting rhythm, which spreads order timing rather than concentrating it in one country.
RomaniaHoria 1, about 40 megawatt peak, in commercial operation since September 2025, inside a platform of seven photovoltaic projects totalling about 766 megawatt peak and four paired battery projects at 112 megawatts and about 390 megawatt hours, all under development.A platform can be built and sold as a unit. The sale to Zephyrus Wing Energies, signed on 10 November 2026, transfers the projects, the local platform and the Romanian team together.
ChileLa Huella, built in the Chilean market that CCE entered through 330 megawatts of project rights in 2019 and left as the group concentrated on Europe during 2026.Market entry and exit are portfolio decisions. A supplier should read the current country list, not the historical one, when estimating order flow.

04 / The year in four moves

A company selling assets is a company funding the next build

Four announcements in 2026 explain the shape of the group better than any strategy paragraph. Read together, they describe a producer that builds, sells a finished asset to a long term owner, and recycles the proceeds into the next development batch. For a manufacturer, the relevant signal is that new construction keeps being funded.

28 April 2026

Montalto di Castro sold to Iberdrola

A 42 megawatt plant completed in November 2025, financed with equity and a bridge facility, then sold to a European utility. The sale validates the development and execution record and returns capital for the next batch.

28 September 2026

Austria spins out as Volturo

The Austrian commercial and industrial business becomes an independent company focused on tailored energy solutions for industry and commerce. CCE keeps large scale open space solar and storage in its core markets.

3 November 2026

GRESB management score of 29.6 out of 30

Fifth of 28 participants in the renewable power sector and 20th of 110 overall, with full marks in four of five management areas. An external score like this is read by lenders and by infrastructure investors.

10 November 2026

Romania sold to Zephyrus Wing Energies

Seven photovoltaic projects at about 766 megawatt peak and four paired battery projects at 112 megawatts and about 390 megawatt hours, plus the local platform and the team. Completion is subject to regulatory approvals.

05 / The Philippine demand signal

A grid adding solar faster than it can store it

The Philippine system reached 32,287 megawatts of installed capacity by 30 April 2026, with renewables at 10,725 megawatts or 33.2 percent, solar at 3,852 megawatts or 11.9 percent, and storage at 845 megawatts. The generation mix tells the harder story: a capacity share near one third delivered roughly a quarter of the electricity. That gap is the arithmetic of a solar led build out, and it is why the auction programme now carries storage.

32,287 MW Installed capacity, Department of Energy list, 30 April 2026
33.2% Renewable share of installed capacity at the same date
3,892 MW Solar at the end of 2025, up 899 megawatts in the year, IRENA
845 MW Energy storage in the department list, 796 megawatts of it battery storage

The target is 35 percent renewable generation by 2030 and 50 percent by 2040, and the department's own projection puts the 2040 requirement at about 102 gigawatts of new capacity, of which roughly 27 gigawatts is solar. Four years is a short window for a target like that, so the auction programme rather than the portfolio standard has become the main instrument. Each round sets a delivery year, and the delivery year is the date a factory can plan against.

Green energy auction rounds, from Department of Energy releases and sector reporting read in November 2026.
RoundVolumeWhat it tells a manufacturer
GEA 1 and 2
2022 and 2023
Just over 5,000 MW between them, mostly solar, with 20 year power purchase agreements.The first scale signal. Developers committed to module and structure orders before a storage market existed.
GEA 3
2025
About 7,500 MW, led by 6,950 megawatts of pumped storage plus a 550 megawatt hydro plant and 30.9 megawatts of geothermal.Dispatchable capacity, which means civil works, penstock steel and long construction schedules rather than a container order.
GEA 4
November 2025
10,195.49 MW across 123 projects: 4,179.09 megawatts ground mounted solar, 2,284 megawatts floating solar, 2,518.29 megawatts onshore wind, 1,189.29 megawatts of solar paired with storage, and 24.82 megawatts of rooftop.The largest order book so far, with delivery from 2026 to 2029. Modules, floats, mounting structures, containers, cabling and harnesses all sit inside it.
GEA 5
2026
3,300 MW of fixed bottom offshore wind for delivery from 2028 to 2030. Suspended on 4 July 2026 for a recalibration of ports, permits and supply chain assumptions, with the auction indicatively set for 1 December 2026.Offshore content is the heaviest fabrication opportunity in the programme, and its schedule is the least predictable. Do not build a factory on this round alone.
GEA 6 to 9
2026 and 2027
Floating solar, rooftop and solar paired with storage, then specialised solar such as canal top and agrisolar, then a final mixed round for solar, biomass, geothermal, hydro and onshore wind. The department plans to auction 25 gigawatts by 2035.A multi year calendar with a storage component in most rounds. That is the difference between a one off order and a line that can be kept loaded.

The fourth round reserve prices were 5.68 pesos per kilowatt hour for ground mounted solar, 6.53 for floating solar, 5.40 for solar with storage, 4.48 for rooftop and 6.09 for onshore wind. Those ceilings matter to a component buyer because they set the room available for a bill of materials. A supplier that cannot land inside the ceiling does not lose a negotiation, it loses the project before the negotiation starts.

06 / Storage as a condition

Twenty percent of the plant, on every new plant above ten megawatts

The single most useful number on this page for a manufacturer is 20 percent. Department Circular 2026-02-0008, issued on 26 February 2026, requires every prospective variable renewable plant of 10 megawatts or more to integrate storage of at least that share of installed capacity. The rule turns storage from an optimisation exercise into a line item on every solar and wind project in the pipeline.

DC 2026-02-0008
26 February 2026

Storage of at least 20 percent of installed capacity for new variable renewable plants of 10 megawatts and above, integrated at project development and grid connection, subject to system impact studies. Grid forming inverters and other grid support capabilities are encouraged, and revenue stacking is recognised in the policy.

House Bill 6676
4 February 2026

The proposed Energy Storage Systems Act passed the House of Representatives on third reading by 192 votes to three, with no abstentions. It sets a national framework for development, commercialisation and use of storage, and it has moved to the Senate. It is not law yet, and this page does not treat it as law.

Draft power development plan
October 2026

The department is planning for about 3,000 megawatts of four hour storage paired with solar by 2040 across all three scenarios in the draft 2026 to 2040 plan, and it is working on a national storage roadmap.

Grid pressure
May to October 2026

The Visayas grid ran through repeated yellow and red alerts from May 2026, under a state of national energy emergency declared by Executive Order 110. The department directed the system operator to contract at least 250 megawatts of reserves and identified about 170 megawatts of battery storage across Cebu, Negros and Panay as part of the medium term response.

The arithmetic is straightforward. A 100 megawatt solar plant carries at least 20 megawatts of storage, and at two hours of duration that is 40 megawatt hours, or roughly ten twenty foot containers at four megawatt hours each. The first 450 megawatt hour tranche of the MTerra Solar project is already operating, and ACEN has financed a 500 megawatt and 1,000 megawatt hour battery at its SanMar solar site in Zambales. The container, rack, enclosure, harness and thermal scope in those projects is the scope a Philippine plant can compete for.

What the storage rule means at three plant sizes, using two hour duration as the worked assumption.
PlantStorage requiredContainers at four megawatt hours
50 MW solar10 MW, or 20 MWh at two hoursAbout 5
100 MW solar20 MW, or 40 MWh at two hoursAbout 10
300 MW solar60 MW, or 120 MWh at two hoursAbout 30

The container count is our arithmetic on a stated assumption, not a published figure. Duration, chemistry, DC or AC coupling and the grid study decide the real number, and a supplier should price from the technical specification rather than from this table.

07 / The bill of materials

What a Philippine plant can build today, row by row

The honest answer is not a single sentence. Some rows are proven at export scale, some are partial and depend on the buyer's specification, and some are absent and should stay absent until a business case is written. The status column is our reading of published capability, not an audit of any named factory.

Component scope for a solar or storage project, with the current Philippine position.
ItemStatusWhat the evidence shows
Photovoltaic module assemblyProvenModule assembly has run at export scale in Batangas since 2017, and the First Philippine Industrial Park hosts more than 160 manufacturers across aerospace, vehicles, food and electronics.
Solar cell productionReturningMaxeon completed the sale of SunPower Philippines Manufacturing to TCL Zhonghuan's Lumetech on 28 February 2025. In September 2026, Philippine Aurion Solar Technologies opened a 1.3 hectare cell plant at the same park, a 3.34 billion peso investment with more than 500 trained workers, producing mainly for the United States and Europe.
Battery container integrationPartialNo grid scale container integration line is published. Sheet metal, enclosure, thermal and harness work exists at industrial scale in the electronics and automotive supply base, which is the transferable part.
Cable harness and low voltage wiringProvenHarness assembly is an established export business serving automotive and electronics buyers, with the testing and traceability discipline that a storage rack also demands.
Steel structures, piles and mountingProvenFabrication and galvanising serve construction, telecommunications and industrial buyers. Ground mount and floating mount designs are a drawing and a quality plan away from that base.
Inverters and transformersAbsentNo published power electronics or transformer manufacturing at project scale. These arrive as imports, and a Philippine plant competes on the balance of system around them.
EPC and operations crewsProvenLocal engineering, procurement and construction firms delivered the auction pipeline to date, and operations crews are the recurring cost line after commissioning.
Technical workwear and site uniformsProvenMade in Tagum City for crews, contractors and corporate uniform programmes, with fabric, trim, reflective tape, sizing, branding and packaging specified per order.

08 / The agricultural variant

Agrivoltaics, the part a European developer learned first

CCE Italia has designed ground mounted systems on agricultural land in close connection with farm activity since 2019, before the first Italian rules on agrivoltaics were published. That experience is the closest thing the company has to a Philippine specific capability, because the Philippine auction calendar has a special round for agrisolar, aquasolar and canal top systems.

An elevated array is a different engineering problem from a ground mount. The structure carries a longer span, the foundations have to leave the root zone intact, the clearance has to let a machine pass, and the module layout has to leave light for the crop rather than maximise output per hectare. CCE's own description of the Italian work is that the array protects crops from extreme weather, reduces irrigation demand and keeps agricultural yield in the same field.

For a Philippine supplier, the transferable scope is steel. An elevated array uses more structure per megawatt than a ground mount, and the fabrication, galvanising and connection detail is the same trade that already serves construction and telecommunications. The second transferable scope is cable: a longer structure run needs more harness, more terminations and more testing.

The Philippine round for specialised solar, including canal top and agrisolar, is planned for late 2026 or early 2027 under the auction programme. A supplier that wants that work should be quoting on a pilot structure now, not after the terms of reference are published.

Elevated array over a crop row A raised photovoltaic table on posts above a crop row, with clearance for machinery and light reaching the plants between rows. CLEARANCE CROP ROW

An elevated table costs more steel per megawatt and earns a different revenue line. The structure, not the module, is the local content opportunity.

09 / Entry route and incentives

Seven instruments, named by number, without the sales language

A renewable energy investor and a component manufacturer enter through different doors, and the fiscal package is only one part of the answer. These are the instruments a due diligence file has to name, written as starting points rather than as advice on eligibility.

Renewable Energy Act
RA 9513
The framework behind service contracts, the green energy auctions, net metering and the distribution rules a project works inside. A service contract runs 25 years and can be renewed for another 25. A supplier does not register under the act, but the delivery calendar of the projects that order from it is set by the act.
Foreign equity
DOE DC 2022-11-0034
The 2022 amendment to the implementing rules removed the Filipino ownership requirement for exploration, development and use of solar, wind, hydro and ocean energy, allowing 100 percent foreign equity. It took effect on 8 December 2022 and it followed a Department of Justice opinion that these energy sources are not natural resources under the constitution.
CREATE MORE
RA 12066
Corporate income tax at 20 percent, with an income tax holiday of four to seven years depending on tier and location, then either enhanced deductions or a special corporate income tax at 5 percent on gross income for ten years. The two routes are mutually exclusive and the election is made once.
PEZA
RA 7916
441 economic zones holding about 4,400 locators on the zone authority's published count. A locator gets the fiscal package, duty free capital equipment, zero rated local purchases and a single agency interface, in exchange for export orientation and zone rules on site and reporting.
Foreign Investments Act
RA 11647
Full foreign equity in enterprises that export at least 60 percent of output, with a paid in capital floor of 100,000 US dollars for a domestic market enterprise that meets the thresholds. This is the route for a component plant that sells to project developers rather than to the local retail market.
EVIDA
RA 11234
The Energy Virtual One Stop Shop, which puts energy related permits, clearances and certifications through a single online platform with prescribed processing times. It is the practical answer to the question of how long a grid application takes.
Microgrid Systems Act
RA 11646
The framework for microgrid systems in unserved and underserved areas, with an authority to operate from the energy regulator instead of a congressional franchise. It is the route for island and off grid solar plus storage, which is where a containerised product has its clearest fit.
Gate 1

Site and zone

Industrial park or zone, power quality, port distance and the ground conditions that decide foundation cost.

Gate 2

Registration

Investment board or zone authority, with the activity code and the capital equipment list fixed at registration.

Gate 3

Grid connection

System impact study, connection agreement and the storage sizing required by the 2026 circular.

Gate 4

Offtake

Auction award or a private power purchase agreement, which decides the revenue line a lender will accept.

10 / The crew side

A solar and storage fleet is a crew business after commissioning

Operations is where the recurring spend sits, and it is where the Philippine labour pool is strongest. A plant needs technicians for high voltage switching, module cleaning, inverter servicing, thermal inspection and battery diagnostics, plus planners, stores and a control room. Heat, humidity, salt air on coastal sites and the typhoon calendar change the maintenance schedule rather than the maintenance list.

The crew model that works in the country is a core team plus a surge contractor. Core technicians hold electrical qualifications, work at height certification and a switching authorisation from the owner. The surge contractor brings the crane, the module handling team and the major component exchange crew when an inverter or a transformer has to come out, and that is a planned mobilisation rather than an emergency one.

Heat moves the workday. Cable terminations and thermal work are scheduled for the early morning, inspections are scheduled around irradiance rather than office hours, and the typhoon season sets a shutdown and restart procedure that every technician rehearses before it is needed. None of that is unusual in the region, and all of it is priced into the maintenance contract.

The garment side of this is unglamorous and constant. Technical workwear for a solar and storage crew has to survive sun exposure, salt air at a coastal site, arc flash rated layering where the switching rules require it, and repeated industrial laundering without losing reflective trim or fit. That is a specification conversation, and it is the part of this page that describes what we make in Tagum City.

Technical workwear, private label

Made in Tagum City, Davao del Norte, for crews, contractors and corporate uniform programmes. Fabric, trim, sizing, branding and packaging are specified per order.

₱320.00 / about $5.10 / €4.45 / £3.85 per piece

Indicative unit price for a standard programme piece at volume. Final pricing depends on fabric weight, reflective trim, embroidery, packaging and order quantity. No minimum is implied by this line, and no supply relationship with any company named on this page is implied either.

11 / Four limits

What this page will not pretend

A dossier that only argues is a brochure. These four statements are the ones a careful buyer raises in the first meeting, written down before they are asked.

No Philippine site exists for this company

Nothing here describes an announced project, office or investment. The page exists because the published portfolio implies a real procurement volume and the Philippine capability question is worth answering on its own terms.

The portfolio is in motion

The Romanian sale and the Austrian spin out both landed in 2026. Any asset list, including the one on this page, is a snapshot. A supplier should ask for the current country list and the current pipeline before quoting capacity.

Auction dates move

The offshore round was suspended in July 2026 and recalibrated, with the auction now indicatively set for 1 December 2026 and awards running to 30 June 2027. A factory that builds its plan on an auction date is building on an indicative date, not a contract.

The grid, not the sun, is the constraint

Repeated yellow and red alerts in the Visayas in 2026, a state of national energy emergency and a reserve contracting dispute show where the bottleneck sits. A project can be fully permitted and still wait on transmission capacity or on a system impact study.

12 / Questions

CCE Holding and the Philippines, answered

Eight questions that come up in the first conversation, including the one about whether this page is an offer to the company. It is not.

What is CCE Holding?

CCE Holding GmbH is a Vienna based energy transition company that develops, finances, builds, operates and trades photovoltaic plants and battery storage systems. It was formed in 2021 from Clean Capital of Austria and enernovum of Germany, two developers that each started in 2010. The company reports 5.2 gigawatts of solar in operation, construction or development and 1.8 gigawatts of battery storage in construction or development across six European countries, with more than 130 staff and Omnes Capital among its investors.

Does CCE Holding operate in the Philippines?

No. No Philippine office, power plant, service contract, investment or supplier agreement is published as of November 2026. CCE builds in Austria, Germany, Italy, France, the Netherlands and Romania, and it has sold assets in Chile and Romania. This page is an independent analysis written from published disclosures, and it is not affiliated with, endorsed by or authorised by the company.

Why does a Philippine page exist for an Austrian producer?

Because the portfolio figures are a procurement statement. A company that builds 5.2 gigawatts of solar and 1.8 gigawatts of storage has to buy modules, mounting structures, containers, cabling and enclosures, and it buys them from somewhere. The Philippines has a 10.2 gigawatt auction result, a storage mandate on every new plant, and an existing electronics manufacturing base. The useful question is what a Philippine plant would have to prove to win a share of that kind of order.

How large is the Philippine solar and storage order book?

The Department of Energy listed 32,287 megawatts of installed capacity as of 30 April 2026, of which 10,725 megawatts or 33.2 percent was renewable, 3,852 megawatts was solar and 845 megawatts was energy storage. The fourth green energy auction awarded 10,195.49 megawatts across 123 projects for delivery between 2026 and 2029, including 4,179.09 megawatts of ground mounted solar, 2,284 megawatts of floating solar and 1,189.29 megawatts of solar paired with storage. The department plans to auction a further 25 gigawatts by 2035.

What does the 20 percent storage rule mean for a supplier?

Department Circular 2026-02-0008, issued on 26 February 2026, requires every prospective variable renewable plant of 10 megawatts or more to integrate storage of at least 20 percent of installed capacity, subject to system studies. A 100 megawatt solar plant therefore carries at least 20 megawatts of storage, and at two hours of duration that is 40 megawatt hours, or roughly ten twenty foot containers at four megawatt hours each. The rule converts a storage discussion into a predictable bill of materials.

What can a Philippine factory supply to a solar or storage project?

Module assembly is proven at scale, and cell production is returning to the country through the former SunPower facilities in Batangas and the new Philippine Aurion cell plant at the First Philippine Industrial Park. Cable harnesses, sheet metal enclosures, steel fabrication, galvanising, mounting structures and civil works are established capabilities serving electronics, automotive and construction buyers. Grid inverters, transformers and battery cells are imported, and no grid scale container integration line is published. The page sets out the gap row by row.

Which incentives apply to a renewable energy manufacturer?

The main instruments are the Renewable Energy Act, which runs a service contract for 25 years with a 25 year renewal, the 2022 implementing rules change that allows 100 percent foreign equity in solar, wind, hydro and ocean projects, CREATE MORE at 20 percent corporate income tax with a four to seven year income tax holiday, the PEZA regime for zone locators, and the amended Foreign Investments Act for export enterprises. The Energy Virtual One Stop Shop, the Ease of Doing Business Act and the Microgrid Systems Act govern permits and off grid projects.

Is this an offer to supply CCE?

No. Nothing on this page is a claim of a commercial relationship with CCE Holding, and no product is offered to it. The commercial part of this page is a Philippine garment and technical workwear line, described for what it is, for buyers already sourcing apparel in the country. The analysis part is published so that a procurement team, a site selection team or a component manufacturer can read the same public numbers we read.

Talk to us

Price a component, test the country, or specify a crew uniform

We make corporate uniforms, technical workwear and private label apparel in Tagum City, Davao del Norte, and we host teams evaluating the Philippines for manufacturing. Tell us which of the three conversations you are in, and what the volumes and the delivery window look like. Office hours: Mon to Sat, 8:30 AM to 5:00 PM (PHT). Address: Naungayan Building, Aala Road, Barangay Mankilam, Tagum City, Davao del Norte, Philippines.

Sources and scope

Company facts follow the CCE Holding site read in November 2026: the company and about pages, the services and project pages, the country pages for Italy and the Netherlands, and the news releases for the Romanian sale of 12 November 2026, the GRESB result of 3 November 2026, the Volturo spin out of 28 September 2026 and the Montalto di Castro sale of 28 April 2026. Portfolio figures of 5.2 gigawatts of solar and 1.8 gigawatts of storage are the company's own counts. Head office, register number, VAT identifier, telephone and the six country units follow the company imprint and global reach pages. Funding history follows the 2021 formation, the 2022 entry of Omnes Capital through Capenergie 5, and the 2023 acquisition of the operating companies, as published by the company and by Berenberg. Philippine capacity, fuel mix and storage figures follow the Department of Energy List of Existing Power Plants as of 30 April 2026, including 32,287 megawatts installed, 10,725 megawatts renewable, 3,852 megawatts solar and 845 megawatts of energy storage. Renewable capacity for the end of 2025 follows IRENA Renewable Capacity Statistics 2026, including 10,436 megawatts total and 3,892 megawatts of solar. Auction volumes, reserve prices and delivery windows follow Department of Energy releases and sector reporting on the green energy auction programme, including the 10,195.49 megawatt fourth round result and the recalibrated fifth round timeline. The storage requirement follows Department Circular 2026-02-0008 of 26 February 2026. The pending storage bill follows House Bill 6676 as passed on third reading on 4 February 2026. The 3,000 megawatt storage planning figure follows the Department of Energy draft power development plan reported in October 2026. Electronics and park figures follow the Semiconductor and Electronics Industries in the Philippines Foundation, the Philippine Statistics Authority export release for 2025, and the First Philippine Industrial Park. Solar cell manufacturing follows the Maxeon filing on the sale of SunPower Philippines Manufacturing to TCL Zhonghuan's Lumetech, completed on 28 February 2025, and reporting on the Philippine Aurion Solar Technologies plant in September 2026. Incentive terms follow the Renewable Energy Act (RA 9513), Department Circular 2022-11-0034, CREATE MORE (RA 12066), the PEZA Act (RA 7916), the amended Foreign Investments Act (RA 11647), the Energy Virtual One Stop Shop Act (RA 11234) and the Microgrid Systems Act (RA 11646). This page is an independent market analysis. It is not affiliated with, endorsed by or authorised by CCE Holding, and it does not describe any announced office, investment, supplier agreement or partnership between that company and any Philippine entity. Nothing here is legal, tax or investment advice. Confirm current requirements with the investment promotion agency, the zone authority, the Department of Energy and a licensed professional before committing funds.