Philippines vs Cambodia electricity: the factory bill, the household meter and the retirement budget
Cambodia is often filed under cheap power in Southeast Asia. At the small meter that is true. At factory scale it is not. The published Cambodian industrial tariff runs to $0.150 per kilowatt hour, and its commercial tariff to $0.177. Mindanao delivers large user power at $0.095 to $0.108, and a registered exporter can deduct the whole electricity bill twice.
Cambodia supply corridor, 2025
EAC- Hydro large
- Coal 48%
- Solar rising
- Imports 7.9%
Installed capacity reached 5,932 MW in 2025 against a peak demand of 2,553 MW. Renewables are 63.23 percent of capacity, mostly hydro, so the dry season still leans on coal and on imports from Vietnam, Thailand and Laos.
The short answer, in three lines
This is not a page that claims the Philippines has the cheapest meter in the region. It does not. It claims something narrower and more useful: for a factory, an exporter and a household budget, the Philippine case is stronger than the Cambodian one, and the gap is largest exactly where the load is largest.
- 01
Cambodia wins the household meter
The Cambodian household average is about ₱9.40 / $0.149 / €0.13 / £0.11 per kilowatt hour against a Philippine average of ₱12.95 / $0.205 / €0.18 / £0.15. A Phnom Penh household pays less at every tier we modelled. Davao still wins the total monthly budget, because rent and transport are lower by more than the meter gap.
- 02
Mindanao wins the factory
Cambodia's industrial ceiling is $0.150 and its commercial ceiling is $0.177. Mindanao ecozone high voltage is about ₱6.80 / $0.108 / €0.10 / £0.08, and Mindanao generation about ₱6.00 / $0.095 / €0.08 / £0.07. On a one megawatt load that is a saving of 28 to 37 percent against the industrial ceiling and 39 to 46 percent against the commercial ceiling.
- 03
The tax treatment widens the gap
A registered export enterprise in the Philippines can claim a 100 percent additional deduction on power expense, which means the whole bill is deducted twice, and can buy local electricity at zero rated VAT. A Cambodian qualified investment project gets a strong import and profit tax package, but the electricity bill itself still carries 10 percent VAT, and the enhanced deduction covers research, training and human resource categories rather than power.
The tariff ladder, line by line
Cambodia publishes a small number of national tariff bands. The Philippines publishes a national average and then a set of utility and locational rates. We put both on the same ladder, in the same currency family, so the comparison is honest about which line is a national average, which is a published ceiling and which is a modelled ecozone figure.
| Line | Market | Rate | Basis |
|---|---|---|---|
| A | Cambodia household average | ₱9.40$0.149 · €0.13 · £0.11 | GlobalPetrolPrices national average, March 2026 |
| B | Cambodia household, Phnom Penh above 50 kWh | ₱11.11$0.176 · €0.16 · £0.13 | 720 riel per kWh, EAC schedule |
| C | Cambodia business average | ₱7.26$0.115 · €0.10 · £0.09 | GlobalPetrolPrices national average, March 2026 |
| D | Cambodia industrial general and medium voltage bulk | ₱8.64$0.137 · €0.12 · £0.10 | Published industry and agriculture tariff |
| E | Cambodia industrial ceiling | ₱9.47$0.150 · €0.13 · £0.11 | Peak industrial rate cited by IEEFA, 2026 |
| F | Cambodia commercial general | ₱9.97$0.158 · €0.14 · £0.12 | Published commercial and administration tariff |
| G | Cambodia commercial ceiling | ₱11.17$0.177 · €0.16 · £0.13 | Peak commercial rate cited by IEEFA, 2026 |
| H | Philippine business average | ₱9.596$0.152 · €0.14 · £0.11 | GlobalPetrolPrices national average, March 2026 |
| I | Philippine household average | ₱12.951$0.205 · €0.18 · £0.15 | GlobalPetrolPrices national average, March 2026 |
| J | Meralco industrial | ₱11.33$0.180 · €0.16 · £0.13 | October 2026 billing |
| K | Meralco residential | ₱15.0615$0.239 · €0.21 · £0.18 | October 2026 billing |
| L | Davao Light residential | ₱13.33$0.211 · €0.19 · £0.16 | Billing for 11 October to 10 November 2026 |
| M | Mindanao ecozone high voltage indicative | ₱6.80$0.108 · €0.10 · £0.08 | Modelled estate and ecozone line, not a published tariff |
| N | Mindanao generation | ₱6.00$0.095 · €0.08 · £0.07 | Generation price, before delivery and taxes |
Read the labels before the numbers. Line C is a survey average across all business sizes and includes small shops on low bands. Lines D to G are the published bands a larger consumer actually sees. Line M is a modelled ecozone line and line N is a generation price, not a delivered retail tariff. A reader comparing line C with line H will conclude that Cambodia is cheaper. A reader comparing line E with line M will conclude the opposite. Both readings are in the data, which is why this page shows the whole ladder.
What is actually inside the two bills
A per kilowatt hour headline hides a lot. The Cambodian bill is a flat energy band plus VAT. The Philippine bill is a stack of generation, transmission, distribution, subsidies and VAT, and the stack is where a registered exporter removes a whole layer.
Cambodia, a commercial account
- Energy charge, flat band
- Demand or service charge
- Distribution and supply
- 10 percent VAT
Cambodia applies 10 percent VAT to domestic electricity supply. A qualified investment project gets zero percent VAT on qualifying locally produced production inputs, and duty and VAT relief on qualifying imports, but the electricity account itself is a taxable domestic supply.
Philippines, an industrial account
- Generation charge
- Transmission
- Distribution and meter
- Universal and subsidy charges
- 12 percent VAT
The standard VAT rate is 12 percent. A registered export enterprise buying local goods and services directly attributable to its registered project pays zero percent, and a registered business enterprise under the enhanced deduction regime claims the power expense twice.
One megawatt, one year, both countries
A single 1,000 kilowatt load running at a 60 percent load factor consumes 5,256,000 kilowatt hours in a year. That is a modest factory, a cold store, a water utility or a mid sized food plant. Here is what the electricity alone costs at each line of the ladder.
| Supply line | Annual cost | Against Cambodian industrial ceiling |
|---|---|---|
| Cambodia business average | ₱38,158,560$604,700 · €538,960 · £449,080 | 23.3 percent lower |
| Cambodia medium voltage bulk | ₱45,411,840$719,700 · €641,410 · £534,450 | 8.8 percent lower |
| Cambodia industrial ceiling | ₱49,774,320$788,800 · €703,030 · £585,790 | baseline |
| Cambodia commercial ceiling | ₱58,709,520$930,400 · €829,230 · £690,940 | 18.0 percent higher |
| Philippine business average | ₱50,436,576$799,300 · €712,380 · £593,580 | 1.3 percent higher |
| Meralco industrial | ₱59,550,480$943,700 · €841,110 · £700,840 | 19.6 percent higher |
| Mindanao ecozone high voltage indicative | ₱35,740,800$566,400 · €504,810 · £420,630 | 28.2 percent lower |
| Mindanao generation | ₱31,536,000$499,800 · €445,420 · £371,140 | 36.6 percent lower |
The comparison deliberately runs the Philippine lines against the top of the Cambodian industrial and commercial bands, because a large new locator would be quoted at the top of that band rather than the blended business average. Against the Cambodian business average of $0.115, Mindanao ecozone is still about 6 percent lower and the Philippine business average is about 32 percent higher. Keep both readings in view.
Reliability is where the Cambodian case weakens
Cheap power that stops is not cheap. Cambodia has added capacity quickly and now covers almost every village, but its own regional surveillance report and the World Bank enterprise survey both describe a grid that still interrupts production. Mindanao has its own tight moments, and this page does not hide them.
Cambodia, the record
Outage shares are from the 2023 World Bank Enterprise Survey as reported by AMRO in 2026. Thailand imports were suspended in mid 2025 during border tension, which is exactly the kind of external shock a single buyer grid has to absorb.
Mindanao, the record
- Peak demand reached 2,775 MW on 12 May 2026, against average available capacity of 3,320 MW from January to July.
- Reserve margin ran between 729 MW and 1,060 MW for most of the year, then fell to 98 MW on 31 August.
- June 2026 produced yellow alerts. No rotating brownouts were reported for the year.
- 1,324 MW of committed and 3,257 MW of indicative projects are lined up to 2031, 4,581 MW combined.
- Hydro from Agus and Pulangi still supplies 982 MW, and renewables are 32.5 percent of installed capacity.
Mindanao is not a perfect grid. It is a grid with a visible reserve, a published project pipeline and a shorter dry season shock than a hydro heavy national system that also depends on imported power.
Rooftop solar: the rule that decides the payback
For a factory with a large roof, the cheapest kilowatt hour is usually the one generated on site. Cambodia and the Philippines treat that kilowatt hour very differently, and the difference matters more than the tariff table.
Cambodia: a compensation tariff on self generation
Commercial and industrial systems
The Electricity Authority of Cambodia replaced the old capacity charge with a compensation tariff on larger rooftop systems. Industry groups proposed rates around one to two US cents per kilowatt hour. The final schedule landed three to four times higher, and EUROCHAM and TAFTAC warned it would stop commercial and industrial installs.
IEEFA puts the levelised cost of Cambodian rooftop solar at $0.046 to $0.074 per kilowatt hour against an EDC commercial and industrial tariff of $0.117 to $0.172. The generation cost is lower, but the compensation fee removes much of the saving for medium and large systems. As of 2025, only 0.02 percent of grid connections had registered solar.
Philippines: net metering and own use
Distribution utility service area
Net metering is available up to 100 kW under the national rules, and distribution utilities administer the credits. A system sized to the load lowers the bill directly, and exported energy is credited against the account.
For a larger manufacturer, the practical route is a dedicated substation, a retail competition contract above the 100 kW threshold that took effect on 26 June 2026, or a renewable supply agreement inside a PEZA or ecozone estate. Full foreign equity is allowed in solar, wind and geothermal projects under RA 11659, so an investor can own the generation as well as the roof.
The incentive packages, side by side
Both countries offer a serious package. The difference is where the relief lands. Cambodia front loads the relief into construction, imported equipment and the profit tax holiday. The Philippines front loads part of it into the operating cost, which is where a power heavy plant feels it every month.
Philippines, CREATE MORE and PEZA
- Corporate income tax: 20 percent for registered projects, with a 5 percent special corporate income tax option for export enterprises after the income tax holiday.
- Power expense: a 100 percent additional deduction on power used for the registered project. The bill is deducted twice.
- VAT on local electricity: zero percent for a registered export enterprise on goods and services directly attributable to the registered activity.
- Estate power: PEZA locators can hold a dedicated substation and contract supply inside the estate.
- Renewables: full foreign equity in solar, wind and geothermal under RA 11659.
- Retail choice: the retail competition threshold is 100 kW from 26 June 2026.
Cambodia, qualified investment project
- Profit tax: a corporate income tax exemption of 3 to 9 years by investment category, then a progressive partial exemption.
- Imports: customs duty and VAT relief on qualifying construction materials, production equipment and, for export projects, production inputs.
- Local inputs: zero percent VAT on qualifying locally produced production inputs.
- Enhanced deduction: 150 percent for research and development, training and human resource categories, not for the electricity bill.
- Electricity bill: carries the standard 10 percent VAT as a domestic supply.
- Trade preference: least developed country status is scheduled to end in 2029, which changes the export maths.
Neither package is a slogan. A plant that imports most of its machinery and sells into a duty free quota will find the Cambodian package attractive. A plant whose electricity is a large share of operating cost, and which exports from a Philippine ecozone, will find the Philippine package compounds with a lower delivered rate.
The household meter, and the budget behind it
Cambodia is cheaper per kilowatt hour for a household. On a 500 kilowatt hour month in Phnom Penh, the bill is about ₱1,195 / $18.94 / €16.88 / £14.07 lower than Davao Light and about ₱2,061 / $32.67 / €29.12 / £24.26 lower than Meralco. Then rent arrives.
| Monthly use | Phnom Penh | Davao Light | Meralco |
|---|---|---|---|
| 100 kWh | ₱1,025.50$16.25 · €14.48 · £12.07 | ₱1,333.00$21.13 · €18.83 · £15.69 | ₱1,506.15$23.87 · €21.27 · £17.73 |
| 220 kWh | ₱2,358.70$37.38 · €33.32 · £27.76 | ₱2,932.60$46.48 · €41.42 · £34.51 | ₱3,313.53$52.51 · €46.80 · £39.00 |
| 350 kWh | ₱3,803.00$60.27 · €53.72 · £44.76 | ₱4,665.50$73.94 · €65.90 · £54.91 | ₱5,271.53$83.54 · €74.46 · £62.04 |
| 500 kWh | ₱5,469.50$86.68 · €77.25 · £64.37 | ₱6,665.00$105.63 · €94.14 · £78.44 | ₱7,530.75$119.35 · €106.37 · £88.63 |
Now the budget. A single person living in Davao spends about $646 a month all in, against about $893 in Phnom Penh, roughly 28 percent less. Rent alone is about $280 against $445, food about $255 against $292, and transport about $44.50 against $73.40. The meter gap runs the other way, but it is a fraction of the rent gap. That is the honest arithmetic of the household case.
Retirement: a small annual fee against a refundable deposit
Cambodia's retirement extension is the simplest paperwork in the region and it has no published deposit. The Philippine SRRV asks for a deposit, and the deposit is the point: it is capital held in your own name, it can be converted into a condominium, and it buys a status that does not need renewing every year.
Cambodia, ER retirement extension
- Enter on the ordinary E visa, about ₱2,209 / $35 / €31 / £26, not the tourist visa, which cannot convert.
- Applicants are generally 55 or older, retired, and able to show means. No income figure or deposit is published in law.
- A 12 month extension costs about ₱18,930 / $300 / €267 / £223 through an agent, and agent assistance is the norm.
- The extension does not lead to permanent residence, does not carry work rights, and requires registration in the foreigner presence system.
- Health insurance is not required and is strongly recommended. Emergency evacuation cover is the number to plan around.
Philippines, SRRV Classic
- Available from age 40. The deposit is ₱946,500 / $15,000 / €13,369 / £11,139 at 50 and above with a pension, or ₱1,893,000 / $30,000 / €26,737 / £22,278 without one.
- At 40 to 49 the deposit is ₱1,577,500 / $25,000 / €22,281 / £18,565 with a pension, or ₱3,155,000 / $50,000 / €44,562 / £37,131 without one.
- The deposit sits in an accredited bank in your name, earns interest, and can be converted into a condominium or a long lease.
- Stay is indefinite while you remain in the programme, with multiple entry and no minimum stay requirement. The annual fee is ₱22,716 / $360 / €321 / £267.
- English is an official language, and Davao has private hospital capacity that Phnom Penh does not match outside a small number of clinics.
The comparison is not "free against expensive". Cambodia's route costs about $300 a year and asks for nothing up front. The Philippine route locks up $15,000 to $50,000 and gives it back when you leave, or converts it into property. If the deposit is capital you would have held anyway, the Philippine route is cheaper over a long retirement. If liquidity matters more than permanence, Cambodia is simpler.
Who should actually choose Cambodia
This page is not a sales sheet for one country. Cambodia is the better call for some readers, and saying so protects the credibility of everything above.
Choose Cambodia if
- You are a small commercial user or a household, where the flat band and the low household average are genuinely cheaper.
- You are a garment, footwear or travel goods plant that can use the qualified investment project holiday and the least developed country trade preference before it ends in 2029.
- You want the lightest possible retirement paperwork and you do not need a path to permanent residence.
- Your site is in Phnom Penh or Sihanoukville, your load is modest, and your roof is too small for solar to change the bill.
Choose the Philippines if
- You are power intensive at medium or high voltage, where the Mindanao gap is 28 to 46 percent against the Cambodian ceilings.
- You export and can register for the 100 percent additional power deduction and zero rated VAT on local electricity.
- You want to own your generation, with full foreign equity in solar, wind and geothermal.
- You want net metering, retail choice above 100 kW, and a dedicated substation inside an ecozone.
- You are retiring and want a status that does not need an annual agent, a deposit you can turn into a home, and English speaking healthcare.
Questions readers actually ask
Is electricity cheaper in Cambodia or the Philippines?
It depends on the size of the load. Cambodia is cheaper for a household and for a small business. The Cambodian household average is about ₱9.40, $0.149, €0.13, £0.11 per kilowatt hour against a Philippine average of ₱12.95, $0.205, €0.18, £0.15.
At medium and high voltage the position reverses. Cambodia's published industrial ceiling is $0.150 and its commercial ceiling is $0.177. Mindanao ecozone power is about ₱6.80, $0.108, €0.10, £0.08, and Mindanao generation about ₱6.00, $0.095, €0.08, £0.07.
Why does Cambodia look cheaper in the business averages?
The business average blends every size of account, including small shops on low tariff bands. A large consumer is quoted at the top of the published band, not at the blend. Cambodia's own band for commerce runs to $0.177 and for industry to $0.150, and its medium voltage bulk rate is $0.137.
This page shows both the blend and the band so the reader can see which one applies to them.
How much does one megawatt of power cost in Mindanao?
A 1,000 kW load at a 60 percent load factor uses 5,256,000 kilowatt hours a year. At the Mindanao ecozone line of about ₱6.80, $0.108, €0.10, £0.08 per kilowatt hour, the annual energy cost is about ₱35,740,800, $566,400, €504,810, £420,630.
At the Mindanao generation line of about ₱6.00, $0.095, €0.08, £0.07, it is about ₱31,536,000, $499,800, €445,420, £371,140. Both figures exclude demand charges where a utility bills them separately.
Is Mindanao power reliable?
Mindanao has a visible reserve and a published pipeline, and it is not a perfect grid. Peak demand reached 2,775 MW on 12 May 2026 against average available capacity of 3,320 MW from January to July. Reserve fell to 98 MW on 31 August, and June produced yellow alerts. No rotating brownouts were reported for the year.
A combined 4,581 MW of committed and indicative projects is lined up to 2031.
Does Cambodia have power outages?
Yes, and the survey data is blunt. The 2023 World Bank Enterprise Survey, as reported by AMRO in 2026, found that 42.8 percent of Cambodian firms experienced outages, rising to 55.7 percent of manufacturers and 82.9 percent of garment firms.
Imports from Vietnam, Thailand and Laos supplied 7.9 percent of total electricity in 2025, and Thai imports were suspended in mid 2025 during border tension.
Can a factory in Cambodia use rooftop solar?
Technically yes, commercially it is harder than it looks. The compensation tariff on larger rooftop systems landed three to four times higher than the rates industry groups proposed. IEEFA puts Cambodian rooftop solar at $0.046 to $0.074 per kilowatt hour against an EDC commercial and industrial tariff of $0.117 to $0.172, but the compensation fee removes much of the saving for medium and large systems.
As of 2025, only 0.02 percent of grid connections had registered solar.
Can a factory in the Philippines use rooftop solar?
Yes. Net metering is available up to 100 kW, and the credit is applied against the account. Above that, a manufacturer can use retail competition, a dedicated substation inside a PEZA or ecozone estate, or a renewable supply agreement.
Full foreign equity is allowed in solar, wind and geothermal projects under RA 11659, so an investor can own the generation as well as the roof.
Which country has better tax treatment for power costs?
The Philippines targets the operating cost. A registered business enterprise under CREATE MORE can claim a 100 percent additional deduction on power used for the registered project, so the bill is deducted twice, and a registered export enterprise can buy local electricity at zero rated VAT.
Cambodia front loads relief into the investment phase, with a 3 to 9 year profit tax exemption, duty and VAT relief on qualifying imports, and zero percent VAT on qualifying local production inputs. The electricity bill itself still carries 10 percent VAT, and the 150 percent enhanced deduction covers research, training and human resource categories rather than power.
Is it cheaper to retire in Cambodia or the Philippines?
The monthly budget is lower in Davao. A single person spends about $646 a month all in against about $893 in Phnom Penh, roughly 28 percent less, with rent at about $280 against $445.
The visa cost runs the other way. Cambodia's ER extension costs about $300 a year with no published deposit. The Philippine SRRV asks for a refundable deposit of $15,000 at 50 and above with a pension, or $30,000 without one, and gives indefinite stay with multiple entry.
What is the SRRV deposit in 2026?
Under the Philippine Retirement Authority schedule in its 2026 Citizens Charter, the SRRV Classic deposit is ₱946,500, $15,000, €13,369, £11,139 at age 50 and above with a pension, and ₱1,893,000, $30,000, €26,737, £22,278 without one.
At 40 to 49 it is ₱1,577,500, $25,000, €22,281, £18,565 with a pension, or ₱3,155,000, $50,000, €44,562, £37,131 without one. The older $10,000 and $20,000 figures still circulating online are out of date.
Should a power intensive factory choose Cambodia?
Not on the electricity line. Cambodia's industrial and commercial bands overlap or exceed the Philippine business average, and Mindanao large user rates are well below both. Cambodia's case rests on the investment holiday, the trade preference before 2029, and a low cost labour base for garment and footwear assembly.
If your process is electricity heavy, the delivered rate and the reliability record both point to a Philippine ecozone, and the power deduction improves the after tax position further.
Sources and how to recheck them
Tariffs move monthly and quarterly. Every figure on this page is dated, and the list below is the set to recheck before the next refresh.
- AMRO, Cambodia Annual Consultation Report 2026, electricity annex. amro-asia.org
- Electricity Authority of Cambodia, Salient Features of Power Development to December 2025. eac.gov.kh
- Electricity Authority of Cambodia, Annual Report 2025. eac.gov.kh
- IEEFA, Cambodia rooftop solar briefing, June 2026. ieefa.org
- ADB, Utility Scale Battery Energy Storage Project, Cambodia, 2026. adb.org
- GlobalPetrolPrices, Cambodia electricity prices. globalpetrolprices.com
- GlobalPetrolPrices, Philippines electricity prices. globalpetrolprices.com
- Council for the Development of Cambodia, incentives and schemes. cdc.gov.kh
- KPMG Cambodia, garment and qualified investment project tax briefing, August 2026. kpmg.com
- Knight Frank Cambodia, 2026 industrial market report. knightfrank.com
- Meralco, October 2026 rate press release. meralco.com.ph
- Philippine Retirement Authority, Citizens Charter 2026, first edition. pra.gov.ph
- Livingcost, Davao against Phnom Penh cost of living comparison, June 2026. livingcost.org
- Agence Kampuchea Presse, power capacity report for 2025. akp.gov.kh
Bring us the load profile and we will price the site
We run production and export logistics from Tagum City in Davao del Norte, on the Mindanao grid this page describes. If you are costing a Philippine base and comparing it with a Cambodian estate, the same desk can share what the power line looks like in practice.