Philippines vs Myanmar electricity: the factory bill, the outage clock and the retirement question
Myanmar publishes the cheapest electricity tariff in Southeast Asia. It also publishes four hours of supply and eight hours without it. The subsidised non domestic band runs from about ₱4.38 / $0.069 / €0.062 / £0.052 to ₱8.76 / $0.139 / €0.124 / £0.103 per kilowatt hour, but firm 24 hour power in an industrial zone costs 900 kyat, about ₱15.78 / $0.250 / €0.223 / £0.186. Mindanao ecozone power is about ₱6.80 / $0.108 / €0.10 / £0.08. On the only number a factory can plan around, the Philippines is less than half the price.
Myanmar supply mix, 2026
MOEE- Hydro 46.6%
- Gas and coal 52.8%
- Solar 0.6%
- Imports small
Installed capacity is 6,725 MW against peak demand of 4,664 MW. Actual generation averages 2,200 to 3,600 MW because 14 major transmission lines are damaged, gas supply has fallen, and hydro is seasonal. Capacity on paper is not capacity at the meter.
What 24 hours actually looks like
One day, three supply linesPower onNo power
The short answer, in three lines
This is not a page that claims the Philippines has the cheapest meter in the region. It does not. It claims something narrower and more useful: Myanmar's tariff is the cheapest on paper and among the most expensive in practice, and the gap is largest exactly where the load is largest and the stay is longest.
- 01
Myanmar wins the printed tariff
A Yangon household in the top band pays 300 kyat, about ₱5.26 / $0.083 / €0.074 / £0.062 per kilowatt hour. A business on the standard non domestic band pays 250 to 500 kyat, about ₱4.38 to ₱8.76. On the printed number alone, Myanmar is the cheapest market in ASEAN and the Philippine average of ₱12.95 / $0.205 looks expensive.
- 02
Myanmar loses the hours, and the hours decide the bill
That tariff comes with load shedding. Yangon households get roughly four hours on and eight hours off. A factory that needs 24 hour power must buy the LNG direct line at ₱15.78 / $0.250, roughly 2.3 times the Mindanao ecozone rate of ₱6.80 / $0.108. A factory that stays on the standard band and fills the gaps with diesel lands near $0.37 per kilowatt hour.
- 03
The Philippines wins the long stay and the export plant
Myanmar has no retirement visa. Tourist entry is 28 days, business entry is 70 days, and longer stay is employer sponsored. The Philippines offers the SRRV from age 40 with a refundable deposit, indefinite stay, and the option to convert the deposit into a condominium. For an exporter, CREATE MORE adds a 100 percent additional deduction on power and zero rated VAT on local electricity.
The tariff ladder, line by line
Myanmar runs two ladders, one for households and one for everyone else, and then a third price for certainty. The Philippines publishes a national average and a set of utility and locational rates. We put every line on the same ladder so the reader can see which number is a subsidy, which is a published band, and which is the only line that promises a full day of power.
| Line | Market | Rate | Basis |
|---|---|---|---|
| A | Myanmar household, first 50 kWh | ₱0.88$0.014 · €0.012 · £0.011 | 50 kyat, MOEE Notification 89/2026 |
| B | Myanmar household, 51 to 100 kWh | ₱1.75$0.028 · €0.025 · £0.021 | 100 kyat, same schedule |
| C | Myanmar household, 101 to 200 kWh | ₱2.63$0.042 · €0.037 · £0.031 | 150 kyat, same schedule |
| D | Myanmar household, 201 kWh and above | ₱5.26$0.083 · €0.074 · £0.062 | 300 kyat, same schedule |
| E | Myanmar non domestic, 1 to 5,000 kWh | ₱4.38$0.069 · €0.062 · £0.052 | 250 kyat, standard distribution |
| F | Myanmar non domestic, 5,001 to 20,000 kWh | ₱7.01$0.111 · €0.099 · £0.083 | 400 kyat, standard distribution |
| G | Myanmar non domestic, 20,001 kWh and above | ₱8.76$0.139 · €0.124 · £0.103 | 500 kyat, standard distribution |
| H | Myanmar industrial zone, 24 hour LNG line firm | ₱15.78$0.250 · €0.223 · £0.186 | 900 kyat, fixed tariff, effective 1 February 2026 |
| I | Myanmar night rate, 11 pm to 5 am | ₱10.52$0.167 · €0.149 · £0.124 | 600 kyat, large industries in Yangon, August 2026 |
| J | Philippine business average | ₱9.596$0.152 · €0.14 · £0.11 | GlobalPetrolPrices national average, March 2026 |
| K | Philippine household average | ₱12.951$0.205 · €0.18 · £0.15 | GlobalPetrolPrices national average, March 2026 |
| L | Meralco industrial | ₱11.33$0.180 · €0.16 · £0.13 | October 2026 billing |
| M | Meralco residential | ₱15.0615$0.239 · €0.21 · £0.18 | October 2026 billing |
| N | Davao Light residential | ₱13.33$0.211 · €0.19 · £0.16 | Billing for 11 October to 10 November 2026 |
| O | Mindanao ecozone high voltage indicative | ₱6.80$0.108 · €0.10 · £0.08 | Modelled estate and ecozone line, not a published tariff |
| P | Mindanao generation | ₱6.00$0.095 · €0.08 · £0.07 | Generation price, before delivery and taxes |
Read the hours before the numbers. Lines A and B are subsidy, and they apply to a household that is home when the power arrives. Lines E to G are the standard distribution tariff, and they come with load shedding. Line H is the only line that promises 24 hours, and it costs 80 percent more than line G. A reader comparing line G with line J will conclude that Myanmar is cheaper. A reader comparing line H with line O will conclude the opposite. Both readings are in the data, which is why this page shows the whole ladder.
What is actually inside the two bills
A per kilowatt hour headline hides a lot. The Myanmar bill is a flat energy band plus a turnover tax plus, for most businesses, a diesel line that never appears on the utility invoice. The Philippine bill is a stack of generation, transmission, distribution, subsidies and VAT, and the stack is where a registered exporter removes a whole layer.
Myanmar, a commercial account
- Energy band
- Meter and service
- 5 percent commercial tax
- Diesel or battery backup
Myanmar has no VAT. A 5 percent commercial tax applies to most goods and services, and electricity is not listed among the exemptions. The utility invoice is only part of the cost. A business on the standard band that loses eight hours a day either stops or pays for the missing hours twice.
Philippines, an industrial account
- Generation charge
- Transmission
- Distribution and meter
- Universal and subsidy charges
- 12 percent VAT
The standard VAT rate is 12 percent. A registered export enterprise buying local goods and services directly attributable to its registered project pays zero percent, and a registered business enterprise under the enhanced deduction regime claims the power expense twice.
One megawatt, one year, both countries
A single 1,000 kilowatt load running at a 60 percent load factor consumes 5,256,000 kilowatt hours in a year. That is a modest factory, a cold store, a water utility or a mid sized food plant. Here is what the electricity alone costs at each line of the ladder.
| Supply line | Annual cost | Against Myanmar firm LNG |
|---|---|---|
| Myanmar standard band, 500 kyat | ₱46,050,000$730,000 · €650,700 · £542,100 | 44.5 percent lower |
| Myanmar firm LNG line, 900 kyat baseline | ₱82,920,000$1,314,000 · €1,171,000 · £976,000 | baseline |
| Myanmar standard band plus diesel | ₱121,400,000$1,924,000 · €1,715,000 · £1,429,000 | 46.4 percent higher |
| Philippine business average | ₱50,436,576$799,300 · €712,380 · £593,580 | 39.2 percent lower |
| Meralco industrial | ₱59,550,480$943,700 · €841,110 · £700,840 | 28.2 percent lower |
| Mindanao ecozone high voltage indicative | ₱35,740,800$566,400 · €504,810 · £420,630 | 56.9 percent lower |
| Mindanao generation | ₱31,536,000$499,800 · €445,420 · £371,140 | 62.0 percent lower |
The comparison runs the Philippine lines against the only Myanmar line that promises a full day of power, because a factory cannot schedule a kiln around a four hour window. Against the standard band of 500 kyat, Mindanao ecozone is still 22 percent lower, and the Philippine business average is about 8 percent lower. The one line where Myanmar looks unbeatable is the line a factory cannot actually use.
Reliability is where the Myanmar case collapses
Cheap power that stops is not cheap. Myanmar's own ministry, the Yangon distribution utility and the World Bank all describe a system that cannot meet demand. Mindanao has its own tight moments, and this page does not hide them.
Myanmar, the record
Access is the United Nations estimate for late 2024, against the government claim that more than 70 percent of households are connected. The World Bank survey of April 2025 found that one third of firms named power as their primary challenge, up from 12 percent in September 2023. Yangon was placed on a four hours on, eight hours off rotation, and YESC later reported daily distribution of 12 hours 56 minutes to 20 hours depending on line faults and load balancing.
Mindanao, the record
- Peak demand reached 2,775 MW on 12 May 2026, against average available capacity of 3,320 MW from January to July.
- Reserve margin ran between 729 MW and 1,060 MW for most of the year, then fell to 98 MW on 31 August.
- June 2026 produced yellow alerts. No rotating brownouts were reported for the year.
- 1,324 MW of committed and 3,257 MW of indicative projects are lined up to 2031, 4,581 MW combined.
- Hydro from Agus and Pulangi still supplies 982 MW, and renewables are 32.5 percent of installed capacity.
Mindanao is not a perfect grid. It is a grid with a visible reserve, a published project pipeline, and a shorter dry season shock than a hydro heavy national system that also depends on imported gas and a transmission network under repair.
Rooftop solar: the rule that decides the payback
For a factory with a large roof, the cheapest kilowatt hour is usually the one generated on site. Myanmar and the Philippines treat that kilowatt hour very differently, and the difference matters more than the tariff table.
Myanmar: no net metering, and a buyback far below cost
Commercial and industrial systems
Myanmar has no national net metering rule. Yangon Electricity Supply Corporation buys surplus solar from systems of 100 kW to 1 MW at 85 kyat per kilowatt hour, about ₱1.49 / $0.024, roughly a tenth of the 900 kyat firm tariff.
The World Bank puts commercial and industrial solar plus battery at $0.205 per kilowatt hour against an industrial grid tariff of $0.250. That is a real saving, and about 110 to 170 new projects are delivered each year with payback of one to three years. The binding constraint is finance, not demand: banks ask for collateral of 100 to 200 percent of the loan.
Philippines: net metering and own use
Distribution utility service area
Net metering is available up to 100 kW under the national rules, and distribution utilities administer the credits. A system sized to the load lowers the bill directly, and exported energy is credited against the account.
For a larger manufacturer, the practical route is a dedicated substation, a retail competition contract above the 100 kW threshold that took effect on 26 June 2026, or a renewable supply agreement inside a PEZA or ecozone estate. Full foreign equity is allowed in solar, wind and geothermal projects under RA 11659, so an investor can own the generation as well as the roof.
The incentive packages, side by side
Both countries offer a serious package on paper. The difference is what surrounds it. Myanmar's package sits behind sanctions, foreign exchange controls and a banking system that cannot always move money. The Philippine package sits inside a market with normal correspondent banking, and part of the relief lands on the operating cost.
Philippines, CREATE MORE and PEZA
- Corporate income tax: 20 percent for registered projects, with a 5 percent special corporate income tax option for export enterprises after the income tax holiday.
- Power expense: a 100 percent additional deduction on power used for the registered project. The bill is deducted twice.
- VAT on local electricity: zero percent for a registered export enterprise on goods and services directly attributable to the registered activity.
- Estate power: PEZA locators can hold a dedicated substation and contract supply inside the estate.
- Renewables: full foreign equity in solar, wind and geothermal under RA 11659.
- Retail choice: the retail competition threshold is 100 kW from 26 June 2026.
Myanmar, MIC permit or SEZ
- Corporate income tax: 22 percent. There is no VAT, but a 5 percent commercial tax applies to most goods and services.
- MIC holiday: 7 years in Zone 1, 5 years in Zone 2 and 3 years in Zone 3, then a 50 percent reduction for five years.
- SEZ holiday: 7 years in a free zone or 5 years in a promotion zone, then 50 percent for five years.
- Land: lease of up to 50 years with two consecutive 10 year extensions.
- Power expense: no additional deduction. The electricity bill is a normal operating cost.
- Surroundings: sanctions, foreign exchange controls, and a 2021 disruption that suspended about 80 percent of Thilawa firms at the time.
Thilawa is the strongest Myanmar case and it is modest. By July 2026 it had 114 contracted investors and 104 in operation, with more than $2.3 billion committed since 2014. That is a working industrial park. It is not a market where a new exporter can assume banking, insurance, customs and power will behave the way they do in Manila or Davao.
The household meter, the outage and the budget behind it
Myanmar is cheaper per kilowatt hour for a household by a wide margin. On a 500 kilowatt hour month, the printed bill at the business rate is about ₱4,380 / $69.40 / €61.86 / £51.54, against ₱6,665 / $105.63 / €94.14 / £78.44 in Davao. Then the missing eight hours arrive.
| Monthly use | Myanmar, printed bill | Myanmar plus diesel | Davao Light |
|---|---|---|---|
| 100 kWh | ₱876.00$13.88 · €12.37 · £10.31 | ₱1,884.00$29.86 · €26.62 · £22.18 | ₱1,333.00$21.13 · €18.83 · £15.69 |
| 220 kWh | ₱1,927.20$30.54 · €27.22 · £22.68 | ₱4,147.00$65.72 · €58.58 · £48.81 | ₱2,932.60$46.48 · €41.42 · £34.51 |
| 350 kWh | ₱3,066.00$48.59 · €43.31 · £36.08 | ₱6,599.00$104.58 · €93.23 · £77.66 | ₱4,665.50$73.94 · €65.90 · £54.91 |
| 500 kWh | ₱4,380.00$69.40 · €61.86 · £51.54 | ₱9,427.00$149.40 · €133.17 · £110.93 | ₱6,665.00$105.63 · €94.14 · £78.44 |
Diesel is kind here. It counts fuel only and ignores the generator, the maintenance, the noise and the fuel that goes missing. A solar plus battery system does better at about $0.205 per kilowatt hour, which brings the 500 kilowatt hour month to roughly $103.64 and puts it at parity with Davao. It also asks for capital and a roof that a tenant usually does not control. Now the rest of the budget. A single person spends about $646 a month in Davao against about $656 in Yangon. Rent is slightly lower in Yangon, about $252 against $280, but transport is about $90.30 against $44.50, international school is about $17,180 against $7,822 a year, and the quality of life index is 46 against 59.
Retirement: a visa against no visa at all
This is the shortest section on the page because the comparison is not close. Myanmar has no retirement visa. Not a restrictive one, not an expensive one, none. The Philippines has a statutory programme with a published deposit, and the deposit is capital held in your own name.
Myanmar, entry and stay
- Tourist e visa, about ₱3,155 / $50 / €45 / £37, for 28 days, single entry, no extension.
- Business e visa, about ₱4,417 / $70 / €62 / £52, for 70 days, and it needs an invitation from a registered company.
- A stay permit is employer sponsored, granted for 3, 6 or 12 months, and tied to the sponsoring company.
- There is no retirement visa, no digital nomad visa and no golden visa. Permanent residence is rare and discretionary.
- The United States advisory is Level 4, do not travel. Complex medical cases are usually evacuated abroad.
Philippines, SRRV Classic
- Available from age 40. The deposit is ₱946,500 / $15,000 / €13,369 / £11,139 at 50 and above with a pension, or ₱1,893,000 / $30,000 / €26,737 / £22,278 without one.
- At 40 to 49 the deposit is ₱1,577,500 / $25,000 / €22,281 / £18,565 with a pension, or ₱3,155,000 / $50,000 / €44,562 / £37,131 without one.
- The deposit sits in an accredited bank in your name, earns interest, and can be converted into a condominium or a long lease.
- Stay is indefinite while you remain in the programme, with multiple entry and no minimum stay requirement. The annual fee is ₱22,716 / $360 / €321 / £267.
- English is an official language, and Davao has private hospital capacity that Yangon does not match outside a small number of clinics.
The comparison is not "free against expensive". Myanmar charges about $50 for four weeks and offers no path to a fifth. The Philippine route locks up $15,000 to $50,000 and gives it back when you leave, or converts it into property. A retiree who cannot obtain a long stay visa has not found a cheaper country. They have found a shorter holiday.
Who should actually choose Myanmar
This page is not a sales sheet for one country. Myanmar is the better call for some readers, and saying so protects the credibility of everything above.
Choose Myanmar if
- You already own or manage a garment, footwear or travel goods plant and your buyers are already sourced there.
- You are an NGO, a diplomatic mission or a resource project with security, insurance and evacuation already budgeted.
- Your staff are on a short assignment and your payroll is offshore.
- You need a household budget on the printed tariff and you can live with four hours of grid power at a time.
- You are working inside Thilawa with an existing investor and a bank that already understands the corridor.
Choose the Philippines if
- You are power intensive at medium or high voltage, where Mindanao is 57 to 62 percent below Myanmar's firm LNG line.
- You need 24 hour operations without a diesel line item and without a generator on the balance sheet.
- You export and can register for the 100 percent additional power deduction and zero rated VAT on local electricity.
- You want to own your generation, with full foreign equity in solar, wind and geothermal.
- You are retiring, and you need a visa that exists, a deposit you can turn into a home, and English speaking healthcare.
Questions readers actually ask
Is electricity cheaper in Myanmar or the Philippines?
On the printed tariff, Myanmar is much cheaper. A household in the top band pays 300 kyat, about ₱5.26, $0.083, €0.074, £0.062 per kilowatt hour, and a business on the standard band pays 250 to 500 kyat, about ₱4.38 to ₱8.76.
On the price of firm 24 hour power, Myanmar is much more expensive. The LNG direct line in an industrial zone costs 900 kyat, about ₱15.78, $0.250, €0.223, £0.186, against a Mindanao ecozone line of about ₱6.80, $0.108, €0.10, £0.08.
Why is Myanmar's cheap tariff not available to a factory?
The standard band comes with load shedding. Yangon households have been placed on a four hours on, eight hours off rotation, and the Yangon utility has reported daily distribution of 12 hours 56 minutes to 20 hours depending on line faults and load balancing.
A factory can apply for the 900 kyat fixed tariff and receive 24 hour supply from the LNG line. That is the price of certainty, and it is 80 percent above the top standard band.
How much does one megawatt of power cost in Mindanao?
A 1,000 kW load at a 60 percent load factor uses 5,256,000 kilowatt hours a year. At the Mindanao ecozone line of about ₱6.80, $0.108, €0.10, £0.08 per kilowatt hour, the annual energy cost is about ₱35,740,800, $566,400, €504,810, £420,630.
At the Mindanao generation line of about ₱6.00, $0.095, €0.08, £0.07, it is about ₱31,536,000, $499,800, €445,420, £371,140. Both figures exclude demand charges where a utility bills them separately.
How much does the same load cost in a Myanmar industrial zone?
At the 900 kyat firm tariff, about ₱15.78, $0.250, €0.223, £0.186 per kilowatt hour, the annual energy cost is about ₱82,920,000, $1,314,000, €1,171,000, £976,000.
That is about ₱47,179,200, or $747,600, more than the Mindanao ecozone line for the same load. The gap is 56.9 percent.
What happens if a Myanmar factory stays on the cheap band and uses diesel?
It pays twice. The standard band is about ₱8.76, $0.139, €0.124, £0.103 per kilowatt hour, and diesel fuel for the missing hours costs about $0.48 per kilowatt hour at the April 2026 diesel price.
A blended day, one third grid and two thirds diesel, lands near $0.366 per kilowatt hour. On the one megawatt load that is about ₱121,400,000, $1,924,000, €1,715,000, £1,429,000 a year, before generator capital and maintenance.
Is Mindanao power reliable?
Mindanao has a visible reserve and a published pipeline, and it is not a perfect grid. Peak demand reached 2,775 MW on 12 May 2026 against average available capacity of 3,320 MW from January to July. Reserve fell to 98 MW on 31 August, and June produced yellow alerts. No rotating brownouts were reported for the year.
A combined 4,581 MW of committed and indicative projects is lined up to 2031.
Does Myanmar have power outages?
Yes, and they are structural. Installed capacity is 6,725 MW against peak demand of 4,664 MW, but average generation runs at 2,200 to 3,600 MW. The ministry has reported 14 major transmission lines disrupted, a 1,009 MW production shortfall from those lines, and a 291 MW reduction in gas fired capacity.
The United Nations put access at 48 percent of the population in late 2024. The World Bank found one third of firms naming power as their primary challenge in April 2025, up from 12 percent in September 2023.
Can a factory in Myanmar use rooftop solar?
Yes, and increasingly it does. There is no national net metering rule, and the Yangon utility buys surplus solar at 85 kyat per kilowatt hour, about $0.024, which is far below the retail tariff. Most systems are sized for own use rather than export.
The World Bank puts commercial and industrial solar plus battery at $0.205 per kilowatt hour against an industrial grid tariff of $0.250. About 110 to 170 new projects are delivered each year, with payback of one to three years, and the binding constraint is bank finance rather than demand.
Can a factory in the Philippines use rooftop solar?
Yes. Net metering is available up to 100 kW, and the credit is applied against the account. Above that, a manufacturer can use retail competition, a dedicated substation inside a PEZA or ecozone estate, or a renewable supply agreement.
Full foreign equity is allowed in solar, wind and geothermal projects under RA 11659, so an investor can own the generation as well as the roof.
Which country has better tax treatment for power costs?
The Philippines targets the operating cost. A registered business enterprise under CREATE MORE can claim a 100 percent additional deduction on power used for the registered project, so the bill is deducted twice, and a registered export enterprise can buy local electricity at zero rated VAT.
Myanmar has a 22 percent corporate rate and a 5 percent commercial tax rather than a VAT. MIC and SEZ investors get a 3 to 7 year income tax holiday and a 50 percent reduction for the next five years, but there is no additional deduction for power, and the package sits behind sanctions and foreign exchange controls.
Can a foreigner retire in Myanmar?
No. Myanmar has no retirement visa, no digital nomad visa and no golden visa. Tourist entry is 28 days and business entry is 70 days. A longer stay needs an employer sponsored stay permit, generally granted for 3, 6 or 12 months.
The Philippines offers the SRRV from age 40, with a refundable deposit of $15,000 or $30,000 at 50 and above depending on pension, indefinite stay, multiple entry, and the option to convert the deposit into a condominium.
Is it cheaper to live in Yangon or Davao?
The monthly totals are nearly level. A single person spends about $646 a month in Davao against about $656 in Yangon. Rent is slightly lower in Yangon, about $252 against $280.
Everything else leans to Davao. Transport is about $44.50 against $90.30, international school is about $7,822 against $17,180 a year, and the quality of life index is 59 against 46. Add backup power to the Yangon budget and the gap widens.
Should a power intensive factory choose Myanmar?
Not on the electricity line. Myanmar's firm power is 900 kyat, about $0.250 per kilowatt hour, and Mindanao ecozone power is about $0.108. A plant that stays on the standard band and covers the gaps with diesel lands near $0.37.
Myanmar's case rests on an existing garment supply base, low labour cost and an investment holiday. If your process is electricity heavy, the delivered rate and the reliability record both point to a Philippine ecozone, and the power deduction improves the after tax position further.
Sources and how to recheck them
Tariffs move monthly and quarterly. Every figure on this page is dated, and the list below is the set to recheck before the next refresh.
- Ministry of Electric Power, Notification 89/2026, reproduced by Global New Light of Myanmar, 28 February 2026. gnlm.com.mm
- Eleven Media, MOEP announces new electricity tariff rates for industries, February 2026. elevenmyanmar.com
- World Bank, Myanmar Rooftop Off-Grid Solar Market Assessment, September 2026. worldbank.org
- Eleven Media, YESC limits electricity distribution to 12 to 20 hours daily, May 2026. elevenmyanmar.com
- Eleven Media, the social challenges resulting from power outages, April 2026. elevenmyanmar.com
- The Irrawaddy, Myanmar junta selling LNG power to factories at extortionate rates, February 2026. irrawaddy.com
- The Irrawaddy, Myanmar regime begins rolling blackouts as El Nino heat intensifies, October 2026. irrawaddy.com
- GlobalPetrolPrices, Burma Myanmar electricity prices, March 2026. globalpetrolprices.com
- GlobalPetrolPrices, Philippines electricity prices, March 2026. globalpetrolprices.com
- PwC, Myanmar corporate other taxes, reviewed 9 September 2026. pwc.com
- DFDL, Myanmar Tax Guide 2026, September 2026. dfdl.com
- Myanmar Japan Thilawa Development, Thilawa SEZ outline, 1 July 2026. japanmyanmar.or.jp
- United States Department of State, 2026 Investment Climate Statements, Burma. state.gov
- Meralco, October 2026 rate press release. meralco.com.ph
- Philippine Retirement Authority, Citizens Charter 2026, first edition. pra.gov.ph
- Livingcost, Davao against Yangon cost of living comparison, June 2026. livingcost.org
- Myanmar Ministry of Immigration and Population, official e visa portal. evisa.moip.gov.mm
Bring us the load profile and we will price the site
We run production and export logistics from Tagum City in Davao del Norte, on the Mindanao grid this page describes. If you are costing a Philippine base and comparing it with a Myanmar estate, the same desk can share what the power line looks like in practice.