Bilateral Aerospace Dossier · Sacheon to Clark

Korea Aerospace Industries (KAI) and the Philippines: Aerospace Manufacturing, MRO and Investment Hub

Korea Aerospace Industries Ltd. (KAI) is the Republic of Korea's sole aircraft manufacturer and one of the few companies in Asia that designs, certifies, builds and sustains a complete combat aircraft. The company posted KRW 1.0643 trillion in consolidated revenue in the third quarter of 2026, up 51.6 percent, on a backlog of about KRW 26.3 trillion. The Philippine connection is no longer a brochure line. The Philippine Air Force flies the FA-50PH, holds a contract for twelve more airframes, and has placed sustainment with KAI through 2028. This page sets out the company, the fleet, and the manufacturing and MRO case that follows from it.

KRW 1.0643 tn Q3 2026 consolidated revenue, up 51.6 percent
KRW 26.3 tn Order backlog at 30 September 2026
24 aircraft FA-50PH fleet in service and on order
53 percent Share of Q3 2026 revenue earned overseas

Stated plainly at the top: KAI holds no manufacturing plant, registered office or announced project in the Philippines today. What the country does hold is a live FA-50PH fleet, a sustainment contract that runs through 2028, an electronics and aerostructures supplier base already exporting, and a free trade agreement with Korea in force since 31 December 2024. That is the honest starting point for every argument below.

01 · Operator Board

Sacheon builds the whole aircraft, from wing skin to final assembly

KAI was formed in 1999 by consolidating the aerospace divisions of Korea's three industrial groups into a single national prime. That concentration is the reason the company can carry a fighter from concept to fleet support without a foreign prime in the middle, and the reason a supplier relationship with KAI is a relationship with the entire Korean military aircraft programme.

Legal nameKorea Aerospace Industries Ltd.
Formed1999, national consolidation
HeadquartersSacheon, South Gyeongsang
Market listingKRX 047810
Core businessAircraft prime, aerostructures, MRO
Q3 2026 revenueKRW 1.0643 trillion
Q3 2026 operating profitKRW 79.4 billion
Nine month revenueKRW 3.3249 trillion
Order backlogAbout KRW 26.3 trillion
Export share53 percent of Q3 2026 revenue
2026 revenue targetAbout KRW 5.7 trillion
Long range ambitionTop four global by 2040

All figures are consolidated and reported for the quarter ended 30 September 2026. The backlog is roughly five years of current annual sales, which is what makes a supplier qualification decision at KAI a multi year decision rather than a single purchase order.

02 · Programme Map

Five aircraft families, one production system and one supplier standard

KAI does not run a single product line. It runs a combat aircraft line, a trainer line, a helicopter line and a civil aerostructures business on the same quality system. A supplier that clears that system once can bid across all of them, which is the practical reason to look at the company as a gateway rather than a single customer.

KF-21

KF-21 Boramae

The 4.5 generation multirole fighter developed from 2015 and now in mass production. The first production aircraft, a two seat airframe, was handed to the Republic of Korea Air Force at Sacheon on 22 September 2026 and moved to its first operating base at Yecheon. Eight aircraft follow by the end of 2026, with operational deployment from the second half of 2027.

Mass production
First delivery September 2026
FA-50

FA-50 light combat aircraft

The armed member of the T-50 family and the aircraft the Philippines operates. Variants in production or delivery include the FA-50PH for the Philippines, the FA-50M for Malaysia, the FA-50PL for Poland and the FA-50GF replacement airframes returned to the Korean Air Force. Quarter three export revenue from finished aircraft reached KRW 291.4 billion, up 78 percent, carried by the Philippine, Malaysian and Polish programmes.

Export production
Four national variants
T-50

T-50 advanced trainer

The supersonic trainer that established KAI as an exporter. Indonesia took 22 airframes and Thailand took 14, and both fleets are supported from Korea. Across Southeast Asia, KAI has signed for 78 aircraft in the T-50 and FA-50 families, which is the installed base that a regional MRO and component pool would serve.

In service
36 regional airframes
KT-1

KT-1 basic trainer

The turboprop trainer that serves as the entry point for Korean military pilots, exported to Indonesia as the KT-1B. It matters commercially because trainer fleets generate predictable, long life consumable and component demand, the kind of work a new supplier base can qualify for first.

In service
Export variant active
KUH-1

Surion utility helicopter and LAH

The KUH-1 Surion is Korea's indigenous utility helicopter. The Light Armed Helicopter derivative entered army delivery, paused on engine supply during 2026, and is scheduled to resume in the fourth quarter alongside a second mass production phase of at least 26 units.

Delivery resuming
Second phase approved
Structures

Civil airframe work packages

KAI supplies airframe structures to major commercial aircraft builders including Boeing and Airbus programmes. This segment booked KRW 262.8 billion in the third quarter of 2026, up 7 percent, and represents a quarter of group revenue. It is the segment most exposed to sub tier sourcing decisions, because civil work packages are priced against global benchmarks rather than national security considerations.

Civil export work
25 percent of revenue
03 · The Philippine Anchor

Twenty four airframes put a thirty to forty year sustainment tail on Philippine soil

The Philippines did not buy a one off aircraft. It bought into a fleet, and a fleet has a lifecycle longer than most industrial investments. That lifecycle is the entire commercial argument, and it is already running.

24FA-50PH
12 in service since 2017 12 on order, delivery to 2030

The first twelve FA-50PH aircraft were ordered in 2014 and entered Philippine Air Force service in 2017. They flew strike sorties during the Battle of Marawi that same year, and the fleet recorded 100 percent availability at the Pitch Black 2024 multinational exercise in Australia with KAI maintenance support.

On 4 June 2025 the Department of National Defense signed for twelve additional aircraft at KRW 975.3 billion, about USD 711 million. The new batch carries aerial refuelling, an upgraded radar and expanded air to air and air to ground weapon options. Deliveries complete by 2030, with the FA-50PH programme scheduled to begin handing over airframes in 2028.

Sustainment followed the same pattern. A one year pilot performance based logistics contract worth about KRW 27 billion was signed in December 2024. On 6 February 2026 KAI secured a three year extension at KRW 101.4 billion, about USD 69.1 million, covering maintenance and logistics support through 2028.

Why performance based logistics matters to a manufacturer. A PBL contract transfers availability risk to the integrator across an airframe life of roughly thirty to forty years. That model only works with a responsive regional supply chain: component repair, consumables, ground support equipment, calibration, technical training and a parts pool close to the operating base. Every one of those lines is a manufacturing or service line that can be localized. The Philippines already hosts the airframes, the base, the English speaking technical workforce and the air cargo links. What it does not yet host is the supplier tier that feeds them.

04 · The Parts Map

The parts map is wider than the aircraft

An FA-50 airframe is a small part of the industrial opportunity. The larger share sits in the tier below: machined components, sheet metal, composites, harnesses, avionics line replaceable units, tooling and training. Those are the work packages a Philippine supplier can qualify for without needing to build an aircraft.

01 / SUSTAINMENT

Component MRO and overhaul

Hydraulic and pneumatic components, actuators, wheels and brakes, structural repair and avionics line replaceable units for the FA-50PH fleet. The requirement is already contracted and already funded through 2028.

02 / AEROSTRUCTURES

Machining and composites

Five axis machining, sheet metal forming, composite layup, heat treatment and surface finishing feeding KAI's civil work packages for Boeing and Airbus. This segment is priced against global benchmarks, so proximity and cost matter more than nationality.

03 / ELECTRONICS

Harnesses and assemblies

Wiring harnesses built to IPC/WHMA-A-620 and electronic assemblies built to IPC-A-610 Class 3. The Philippine electronics base already runs these standards at scale for automotive, telecom and industrial customers.

04 / SERVICES

Tooling, GSE and training

Assembly jigs, ground support equipment, calibration services and type specific technical training. Lower capital intensity than parts manufacturing, and the fastest route to a first KAI purchase order.

The supplier base is already here

  • Moog Controls Philippines in the PEZA Baguio City Economic Zone produces servo valves and primary flight control actuation for Boeing and Airbus commercial and military aircraft.
  • RTX Collins Aerospace anchors the Laguna and Batangas corridor alongside Integrated Micro-Electronics and Ionics EMS, inside Laguna Technopark and the First Philippine Industrial Park in Tanauan.
  • SIA Engineering at Clark Freeport runs MRO operations next to twin 3,200 meter runways, with tier 2 aerospace suppliers in the same estate.
  • Subic Bay Freeport and Cebu add port adjacent industrial land, an international airport and an existing heavy maintenance cluster.

The standards are the entry ticket

Aerospace work is not awarded on price alone. The qualifying stack is AS9100 Rev D for the quality system, NADCAP special process accreditation for heat treatment, surface finishing and non destructive testing, IPC-A-610 Class 3 for electronics and IPC/WHMA-A-620 for harnesses. A Philippine supplier that already holds these certifications can be audited by KAI in months rather than years.

The same holds on the Korean side. KAI does not buy from a company because a zone brochure says it is ready. It buys after its own supplier audit, first article inspection and a production readiness review. The Philippine locators that already export to Boeing, Airbus and Collins have cleared that bar once, which shortens the second clearance considerably.

05 · Bilateral Terms

The Philippines Korea free trade agreement has been in force since December 2024

This is the part of the case that changed most recently, and the part most supplier decks still get wrong. The agreement is not pending, not under negotiation and not waiting on ratification. It is operating.

The Philippines Korea Free Trade Agreement was signed on 7 September 2023, ratified by the Philippine Senate on 23 September 2024 and by the Korean National Assembly in November 2024, and entered into force on 31 December 2024. Executive Order No. 80 series of 2024 implements the Philippine tariff schedule.

The agreement eliminates tariffs on 94.8 percent of Philippine exports to Korea and 96.5 percent of Korean exports to the Philippines, which is materially deeper than the coverage available under the older ASEAN Korea agreement. Full implementation is scheduled for 2038, so the tariff curve continues to fall through the life of any plant built now.

The two countries elevated their relationship to a Strategic Partnership in October 2024. For an aerospace supplier, the practical effect is that a component travelling from Clark or Baguio to Sacheon, or a Korean tooling package travelling the other way, faces a declining duty line rather than a fixed one.

What the agreement does not do

It does not waive rules of origin, and it does not create aerospace certification. A component must still meet the regional value content threshold to claim preference, and it must still hold the airworthiness and quality approvals its customer requires.

It also does not cover services trade the way goods are covered, so an MRO joint venture still needs its own licensing path through the Civil Aviation Authority of the Philippines and, for defense work, the appropriate security arrangements.

Treat the tariff line as a margin improvement, not as market access. The access comes from the supplier audit.

06 · Constraints

Four things decide the site before the incentives do

Incentives are the easiest part of a Philippine investment case to write and the least likely to decide it. These are the four questions a serious aerospace supplier asks after the tax presentation ends.

Constraint 01

No anchor customer on the ground

KAI has no Philippine facility, so a local supplier cannot sell into a plant next door. The first order has to be won against Korea based incumbents and shipped across the East China Sea. That raises the bar on cost, lead time and responsiveness, and it is why the sustainment work is the realistic entry point rather than a greenfield assembly line.

Constraint 02

Tier 2 depth is thin

The Philippines has credible tier 1 and tier 2 electronics and actuation locators, but the special process layer is shallow. Heat treatment, surface finishing, non destructive testing and calibration to aerospace specification are concentrated in a small number of shops, and capacity there is committed to existing automotive and electronics customers.

Constraint 03

Power is a real line item

Meralco's average retail rate across the first nine months of 2026 was 13.43 pesos per kilowatt hour. For a machining or heat treatment operation that runs two shifts, electricity is a larger cost than the wage differential that attracted the investment in the first place. Site selection should start with the distribution utility, not the payroll sheet.

Constraint 04

Certified skills take time

AS9100 lead auditors, NADCAP approved process engineers, NDT Level II inspectors and five axis programmers are not produced in a quarter. The universities and technical schools turn out strong engineering graduates, but aerospace specific certification still has to be built on top, usually through in house training or a partner's existing quality organisation.

07 · Incentives and Sites

What the fiscal package actually says, and where it applies

These are the instruments a registered aerospace enterprise can use. Each line names the statute or issuance so a Korean counsel or tax adviser can verify it directly rather than relying on a summary.

Corporate income tax 20 percent under the Enhanced Deductions Regime of CREATE MORE, Republic Act No. 12066, implemented by BIR Revenue Regulations No. 7-2025.
Income tax holiday Four to seven years, followed by either the 5 percent special corporate income tax on gross income or the enhanced deductions regime.
Power expense An additional 200 percent deduction on power expenses for registered enterprises, which directly addresses the constraint above.
Capital equipment Duty free import of capital equipment, raw materials and spare parts for export oriented registered projects.
Foreign ownership Full foreign equity under Republic Act No. 11647, the amended Foreign Investments Act, with a minimum paid in capital of USD 100,000 for domestic market enterprises.
Land tenure 75 years under Republic Act No. 7652, the Investors' Lease Act, structured as 50 years plus one 25 year renewal.
Registration route PEZA economic zone registration or Board of Investments Tier III priority status under the 2026 Strategic Investment Priorities Plan, approved by Memorandum Order No. 47 on 21 May 2026.
Approvals Green Lanes treatment for strategic investments, with expedited permitting across national agencies.

Where an aerospace supplier would sit

Pampanga

Clark Freeport

Twin 3,200 meter runways, SIA Engineering MRO, existing aerospace tier 2 suppliers and direct cargo access. The strongest single location for sustainment and MRO work.

Zambales

Subic Bay Freeport

Deep water port, industrial land and freeport treatment. Suited to heavy structures, surface treatment and anything that ships by sea.

Benguet

Baguio City

High altitude precision manufacturing at the Moog Controls Philippines PEZA zone, with a mature servo valve and actuation workforce.

CALABARZON

Laguna and Batangas

Laguna Technopark and the First Philippine Industrial Park in Tanauan, hosting Collins Aerospace, Integrated Micro-Electronics and Ionics EMS.

Central Visayas

Cebu

International airport, container port and an established heavy maintenance cluster, with lower industrial land cost than the Luzon corridors.

Davao Region

Tagum City

Our own production base in Davao del Norte, serving industrial workwear and textile programmes for locators across the country.

₱550.00 to ₱645.00 CALABARZON daily minimum wage, Wage Order IVA-23, from 26 October 2026
₱540.00 Davao Region non agriculture daily rate, Wage Order RB XI-24, from 1 September 2026
₱755.00 National Capital Region daily rate, Wage Order NCR-28, from 26 September 2026
₱63.143 BSP reference rate per US dollar, 5 and 6 November 2026

Reference rates on the same date were ₱70.8464 per euro and ₱85.531 per pound sterling. Quotations on this page are stated in pesos because that is the currency the statutory wage orders and utility tariffs are written in.

08 · Industrial Apparel

Flight line workwear, cut and sewn in Tagum City

Aerospace facilities in the Philippines buy the same things every other industrial plant buys: workwear that survives a shift, identification that reads across a hangar, and a supplier who can repeat an order without changing the shade. That is our line of work.

Hangar and line coveralls

Two piece and one piece work coveralls with reinforced seams, pen pockets and reflective options. Sized for technical crews and issued per shift.

High visibility vests

Contrast banding and reflective tape for apron, ramp and warehouse zones. Configured to the client's colour scheme and identification sequence.

Corporate and visitor apparel

Embroidered polo shirts, technical shirts and outerwear for executives, auditors, site visits and supplier qualification teams.

Production runs from twelve pieces per design, with embroidery, screen print or sublimation applied in house. Standard turnaround is fifteen to twenty five business days once artwork is approved, and every quotation is issued in four currencies because our clients contract in pesos, dollars, euros and pounds.

We supply industrial and corporate apparel. We do not manufacture aircraft components, and we do not claim aviation certification, flame resistance or airworthiness approval for any garment unless a specific certified fabric is named in the order. Clients who need certified flame resistant workwear should specify the standard at enquiry and we will quote against it.

09 · Questions

What Korean suppliers, Philippine manufacturers and procurement teams ask first

Eight questions that come up in every briefing on this subject, answered directly.

Does Korea Aerospace Industries have a factory or office in the Philippines?

No. As of November 2026 KAI has no manufacturing plant, registered office or announced project in the Philippines. Its production is concentrated at Sacheon in South Gyeongsang Province, with export customers served from Korea. The Philippine relationship is a customer and sustainment relationship, not a production footprint.

How many FA-50 aircraft does the Philippines operate?

Twenty four airframes in total. The first twelve FA-50PH aircraft were ordered in 2014 and entered service with the Philippine Air Force in 2017. Twelve additional aircraft were ordered on 4 June 2025 at KRW 975.3 billion, about USD 711 million, with deliveries scheduled to complete by 2030 and the second batch beginning handover in 2028.

What does the 2026 sustainment contract cover?

On 6 February 2026 KAI signed a three year performance based logistics contract with the Philippines worth KRW 101.4 billion, about USD 69.1 million. It covers maintenance and logistics support for the FA-50PH fleet through 2028. It followed a one year pilot PBL contract worth about KRW 27 billion signed in December 2024. PBL transfers availability risk to the integrator across an airframe life of roughly thirty to forty years.

Is the Philippines buying the KF-21 Boramae?

Not yet. The Philippines has stated a requirement for forty multirole fighters and is reviewing the KF-21 as one candidate. Indonesia, the United Arab Emirates and Malaysia are also at various stages of review. No Philippine KF-21 purchase contract has been signed, and any page that states otherwise is ahead of the record. The existing FA-50PH fleet does give the Philippines continuity in training, maintenance and weapons familiarization if it eventually selects the type.

What incentives apply to an aerospace supplier locating in the Philippines?

Under CREATE MORE, Republic Act No. 12066, a registered enterprise receives a 20 percent corporate income tax rate under the Enhanced Deductions Regime, a four to seven year income tax holiday, an additional 200 percent deduction on power expenses, and duty free import of capital equipment. Registration runs through PEZA or the Board of Investments, and aerospace fits Tier III priority status under the 2026 Strategic Investment Priorities Plan.

Can a Korean company own 100 percent of a Philippine aerospace operation?

Yes. Republic Act No. 11647, the amended Foreign Investments Act, permits full foreign equity in most manufacturing activities, with a minimum paid in capital of USD 100,000 for domestic market enterprises and a lower threshold for export enterprises. Land is accessed through a 75 year lease under Republic Act No. 7652 rather than freehold, which is the normal structure for a foreign industrial investor.

Which Philippine locations already have an aerospace supplier base?

Five clusters matter. Baguio City hosts Moog Controls Philippines in the PEZA zone, producing servo valves and flight control actuation. Clark Freeport hosts SIA Engineering MRO and tier 2 aerospace suppliers beside twin 3,200 meter runways. The Laguna and Batangas corridor, anchored on Laguna Technopark and the First Philippine Industrial Park in Tanauan, hosts RTX Collins Aerospace, Integrated Micro-Electronics and Ionics EMS. Subic Bay Freeport offers port adjacent industrial land, and Cebu has an international airport, container port and heavy maintenance cluster.

Can RB Advertising supply workwear to an aerospace facility in the Philippines?

Yes. We manufacture coveralls, high visibility vests, polo shirts, technical shirts and outerwear at our facility in Tagum City, Davao del Norte, with in house embroidery, screen print and sublimation. Minimum order is twelve pieces per design, standard turnaround is fifteen to twenty five business days after artwork approval, and quotations are issued in pesos, dollars, euros and pounds. We do not manufacture aircraft components and we do not claim aviation certification for garments.

11 · Contact

Talk to the industrial desk

We work with site selection teams, aerospace suppliers, Korean investors evaluating a Philippine base, and procurement officers sourcing industrial apparel. Enquiries are answered by a person, not a form.

Facility: RB Advertising, Naungayan Building, Aala Road, Barangay Mankilam, Tagum City, Davao del Norte, 8100 Philippines

Operating hours: Mon to Sat, 8:30 AM to 5:00 PM (PHT)

12 · Sources

Sources and scope

Company and programme figures: KAI regulatory filings for the quarter ended 30 September 2026, as reported by Yonhap News Agency, ChosunBiz and Korea JoongAng Daily in November 2026. Philippine fleet and sustainment: KAI contract disclosures of 4 June 2025 and 6 February 2026, reported by The Korea Herald and Yonhap News Agency. Trade terms: Philippines Korea Free Trade Agreement text, Executive Order No. 80 series of 2024, and the Philippine Tariff Commission FTA tracker. Incentives: Republic Act No. 12066, BIR Revenue Regulations No. 7-2025, Republic Act No. 11647, Republic Act No. 7652, and Memorandum Order No. 47 series of 2026. Rates: Bangko Sentral ng Pilipinas reference rates of 5 and 6 November 2026 and the published regional wage orders. Figures are stated as reported and are not restated for later revisions.