Platform briefing · November 2026 RB Advertising research desk · Tagum City, Philippines
Hyperscale digital infrastructure

Pure Data Centres Group and the Philippines: Power, Capital and Manufacturing

Pure DC designs, builds and operates data centres for the world's largest cloud and AI customers, with more than 1 GW of capacity live or under development across Europe, the Middle East and Asia. This briefing sets out how the platform works, how it is financed, and where the Philippines fits as an investment destination and a manufacturing base for the build out.

Independent research by RB Advertising. Pure Data Centres Group has not reviewed or endorsed this page. Figures carry the source and the date they were published, because this sector moves faster than any page can.

Origin5 Fleet Place, London, United Kingdom
SubjectHyperscale data centres, power, project finance
DestinationMetro Manila, Laguna, Cavite, Batangas
1 GW+Capacity live or under development
5Countries with operating capacity
$6.2bnFinancing secured in 12 months to November 2026
99.999%Availability the platform is engineered for
90 MWLargest announced campus, Brent Cross, London
2013Year founded, formerly Global Data Centres
01 · The platform

A Developer That Starts With Power, Not With Land

Section 01 of 11

Pure Data Centres Group is a London headquartered developer and operator of hyperscale digital infrastructure. It was founded in 2013 as Global Data Centres, renamed itself Pure DC, and now runs a platform whose stated constraint is not demand but access to power, planning and land in the markets where hyperscalers need capacity.

The company describes its strategy as power first. Instead of buying a site and then chasing a grid connection, it secures the power envelope, then assembles the land, the planning consent, the engineering and the construction around it. That order of operations is unusual in a sector where many developers start with real estate and treat electricity as a permitting problem.

The model is vertically integrated. Pure DC owns, builds and operates its own facilities rather than acting as a landlord or a fund manager. It holds the design authority, the construction programme and the operations team, which is why the company can offer availability commitments at five nines and still describe each site as bespoke.

The customer base is the top of the cloud market. Pure DC builds for hyperscale cloud providers and AI deployments, which means the specification conversation starts at 99.999 percent availability, high density racks, liquid cooling readiness and net zero water use cooling, not at a retail colocation price list.

The company is backed by Oaktree Capital Management, a global alternative investment manager with roughly $180 billion under management. That backing matters for the Philippine question because it sets the scale at which the platform can commit: the 90 MW Brent Cross campus alone is close to two thirds of the entire live data centre capacity of the Philippines in 2026.

  • Legal namePure Data Centres Group
  • Trading namePure DC
  • Founded2013
  • Former nameGlobal Data Centres
  • Head office5 Fleet Place, London
  • BackerOaktree Capital Management
  • CapacityOver 1 GW live or in development
  • WorkforceAround 260 people
  • Availability target99.999 percent
  • Philippine sitesNone announced

The nearest site is Jakarta, not Manila. Pure DC operates a 20 MW campus in Bekasi, Indonesia. That is the closest the platform gets to the Philippines today, and it is the right comparison for anyone modelling a Philippine entry. The 20 MW Bekasi figure is smaller than a single London or Amsterdam campus, which tells you how the company sizes a market.

02 · The portfolio

Six Campuses With a Published Megawatt Figure

Section 02 of 11

The portfolio concentrates on supply constrained markets: London, Amsterdam, Dublin, Madrid, Abu Dhabi, Jakarta and now Finland and Saudi Arabia. Capacity is announced campus by campus, so the ladder below shows only the sites where Pure DC has published a megawatt figure.

  • London, Brent Cross LON01United Kingdom, in final build phase 90 MW
  • Amsterdam, WestpoortNetherlands, fully leased 78 MW
  • London, Park RoyalUnited Kingdom, SEGRO joint venture 56 MW
  • Dublin, BallycoolinIreland, 14 acre site 54 MW
  • Abu Dhabi, Yas IslandUnited Arab Emirates 48 MW
  • Jakarta, BekasiIndonesia, nearest site to the Philippines 20 MW

Also announced without a published megawatt figure: Madrid at Meco, under construction; an AI campus at Seinäjoki in Finland; and multiple campuses of 100 MW and above in Saudi Arabia with Dune Vaults. The London Park Royal figure is the 56 MW campus delivered through the 50:50 joint venture with SEGRO.

Read the ladder as a site selection rule. Pure DC builds where power is scarce and demand is dense. Jakarta at 20 MW is a market entry position, not a flagship. A Philippine entry would most likely follow the Jakarta shape first, a single anchored campus of 20 to 50 MW tied to a named customer, before any 90 MW commitment.

03 · The capital stack

Six Billion Dollars in Twelve Months, and Why It Matters Here

Section 03 of 11

Data centres are a financing business before they are a construction business. Pure DC raised more than $6.2 billion of bank and institutional capital in the twelve months to November 2026, which is the clearest signal of how quickly the platform expects to deploy capacity.

  • May 2026 $2.7 billion

    Including a $2.15 billion facility secured against the Dublin and Amsterdam campuses, plus an increase in corporate level financing to $550 million.

  • 15 July 2026 €1.3 billion

    Committed senior debt for Phase 1 of the Seinäjoki AI campus in Finland, described by the company as one of Europe's largest AI campuses.

  • 21 July 2026 LON01 build phase

    Final build phase begins at the 90 MW Brent Cross campus in London, the largest announced site in the portfolio.

  • 4 November 2026 $780 million + $1.1 billion

    A Platform Growth Facility of $780 million with a $1.1 billion accordion, creating a framework that can expand to roughly $1.9 billion. Proceeds fund the development pipeline and future site acquisitions.

The lender group is the part a Philippine counterparty should study. The November 2026 facility added Citigroup Global Markets, First Abu Dhabi Bank and Infranity to a group that already included ABN AMRO, Allianz Global Investors and SMBC. That is European, Gulf, Asian and American capital in one structure, which is what a multi region platform needs.

For a Philippine project the implication is structural, not sentimental. A developer at this scale does not need a local partner to find equity. It needs a local partner who can deliver three things a balance sheet cannot buy: a firm power connection, land with clean tenure, and a permitting path that holds to a date.

  • ABN AMRO
  • Allianz Global Investors
  • SMBC
  • Citigroup
  • First Abu Dhabi Bank
  • Infranity

What the lenders are underwriting. Secured power sites, contracted hyperscale customers and a delivery team that has commissioned campuses in five countries. A Philippine site would be underwritten on the same three tests, so the bankable question is never the land price. It is who holds the connection and when it energises.

04 · Philippine case

Why the Philippines Belongs on the Next Site List

Section 04 of 11

The Philippine argument is not that the country is cheap. It is not, on power. The argument is that the country has the one thing a power first developer needs above all else, which is a government that has publicly committed to a capacity number and is reorganising policy around it.

A declared national capacity target

The national AI plan sets a path from roughly 50 MW of AI data centre capacity today to 1.5 GW by 2033, with 400 MW as the first phase by 2030. The Department of Information and Communications Technology has spoken of an 18 GW ambition across a decade. Targets are not capacity, but they move permits, and permits are what a developer cannot buy.

Target: 1.5 GW by 2033

Established industrial corridors

The live market is concentrated in Metro Manila and the Laguna, Cavite and Batangas corridor, with Clark and Tarlac emerging. Those are PEZA registered industrial estates with road, water, fibre and a workforce that already commutes to electronics plants. A campus does not have to create an ecosystem from nothing.

Corridor: Laguna, Cavite, Batangas

Full foreign ownership, in writing

Data centre operation is not on the foreign investment negative list, so a foreign company can own 100 percent of the operating entity. Land is the exception: the Constitution keeps land ownership with Philippine nationals, so a campus needs a long term lease, which the Investors' Lease Act allows. Structure the land, own the plant.

Ownership: 100 percent foreign

A workforce that already runs on night shifts

The country runs one of the world's largest contact centre and shared services industries, which means 24 hour operations, shift rostering and service level discipline are ordinary management skills here, not a training programme. Add a deep electronics manufacturing base and the commissioning and maintenance labour question gets easier than in most markets.

Cloud spend: $2.5 billion in 2026

Say the hard part out loud. Philippine industrial power is expensive by regional standards, and the grid has a supply margin problem in the places where demand is densest. The country counted 32,074 MW of installed generating capacity and 27,908 MW of dependable capacity across 323 plants in March 2026, against a projected national peak of 21,007 MW for the year. That sounds comfortable until you note that dependable capacity is derated, a large share of the fleet is coal, and the constraint that matters to a developer is a connection in Laguna, not a number for the country. A developer that ignores this will underwrite a project on a headline figure and then discover the queue. The Philippine case is a policy case and a corridor case. It is not yet a price case.

05 · Capacity ledger

The Philippine Market in Eight Numbers

Section 05 of 11

Two sets of numbers are in circulation and they do not agree, because they count different things. The figures below separate what is live, what is being built and what is only planned, and they name the source so a reader can check the arithmetic.

44Data centres operating nationwide, BMI Research, September 2026
140 MWLive IT capacity across those facilities
43 MWUnder construction today
221 MWIn the planned pipeline
473 MWOperator group target by 2028, Data Center Operators of the Philippines
1.5 GWNational AI data centre target by 2033
400 MWFirst phase target by 2030
$2.5bnForecast cloud spending in 2026, BMI Research

The named operators are the ones a supplier should learn first. PLDT's VITRO arm holds the largest single facility in the country, a 50 MW AI ready campus in Santa Rosa, Laguna, inside a portfolio of roughly 100 MW. ST Telemedia Global Data Centres Philippines, the Globe and Ayala joint venture, runs five facilities and expected 30 to 35 MW by the end of 2026, with a 124 MW campus planned at Fairview in Quezon City. Digital Edge operates NARRA1 in Binan, Laguna. A-FLOW, a joint venture between FLOW Digital Infrastructure and AyalaLand Logistics, opened a 6 MW first phase in Laguna in November 2025 inside a 36 MW plan. Digital Halo opened a campus in Cainta, Rizal. Equinix entered in 2024 by acquiring three sites from Total Information Management.

The pipeline is real but the conversion rate is the question. Forty three megawatts under construction is the only capacity that can serve a customer before 2028. Everything else depends on a power connection, a building permit and a customer signature arriving in that order.

The honest gap. Moving from 140 MW to 1.5 GW is roughly a tenfold increase in seven years. For scale, one announced Pure DC campus in London is 90 MW, and the whole Philippines runs on 140 MW. That is not an argument against the target. It is an argument that the constraint is delivery capacity, not ambition, and delivery capacity is exactly what a platform like Pure DC sells.

  • Live capacity140 MW
  • Largest live site50 MW, Santa Rosa
  • Largest planned site124 MW, Fairview
  • Dominant clusterMetro Manila and CALABARZON
06 · Manufacturing

What a Campus Buys, and What the Philippines Already Makes

Section 06 of 11

A 20 MW campus spends most of its capital on imported equipment: chillers, generators, uninterruptible power supplies, switchgear and the IT load itself. The Philippine opportunity is not in replacing those. It is in the fabricated, assembled and consumable layers around them, where freight and lead time favour a local supplier.

Category by category: what is genuinely local, and the question that qualifies it
CategoryWhat a campus buysPhilippine baseFirst qualification question
Cable assembliesCopper and fibre harnesses, patch panels, labelled looms, power whipsStrong. Wire harness assembly is an established export industry, with Japanese harness makers operating plants in Laguna, Cavite and BatangasCan you test every assembly and ship it with serialised records?
Sheet metalRacks, cable trays, containment, doors, blanking panels, enclosuresStrong. Fabrication shops in the same corridor already serve electronics and automotive buyersWhat tolerance and powder coat finish can you hold at volume?
Electrical assembliesLow voltage panels, distribution boards, changeover panels, control panelsModerate. Panel building exists, but type tested assemblies to international standards are a narrower listDo you hold a type test report to IEC 61439 for the assembly you are quoting?
Mechanical fabricationSkids, manifolds, pipe spools, tanks, structural supportsModerate. Shipbuilding and process fabrication in Batangas, Cebu and Subic carry the welding and quality systemsDo you hold ASME or equivalent weld qualification, and who inspects?
Cooling equipmentComputer room air handlers, chillers, pumps, filters, containmentWeak on the core. The refrigerant circuit is imported. Local scope is installation, sheet metal, insulation and serviceWhich scope is genuinely manufactured here and which is a reseller margin?
Site apparel and PPEArc rated workwear, flame resistant garments, high visibility, cleanroom garments, campus uniformsStrong. Garment manufacturing nationwide, with bonded production inside PEZA ecozonesCan you carry the fabric mill certificate through to the finished garment label?

The strategic point. The Philippines will not outbid Vietnam or Malaysia on the cost of a chiller. It can win on assemblies that are light, technical, English documented and time sensitive: harnesses, looms, containment, panels, site apparel. That is a narrower pitch than manufacturing hub, and it is the one that survives contact with a procurement team.

07 · Supplier ladder

Five Rungs From Capability Pack to Purchase Order

Section 07 of 11

Hyperscale procurement does not buy from a brochure. It buys from a qualification file. A Philippine supplier that wants a campus account should work the ladder in order, because each rung produces the document the next one asks for.

  1. Capability pack

    One document, twelve pages at most: plant list with tonnage and bed size, processes, certifications, reference customers, capacity per month, lead time, and the named engineer who owns quality. Send it to the EPC contractor, not to the developer's reception desk.

  2. First article and trial order

    Offer a paid first article, not a free sample. A campus buyer needs to see your inspection report, your packing standard and your ability to hold a tolerance across a batch. Free samples signal a sales process. Paid first articles signal a production process.

  3. Factory acceptance test

    Invite the buyer to witness a factory acceptance test. This is where Philippine suppliers usually lose the account: the product is fine, but the test documentation is thin. Build the test procedure before you need it.

  4. Supplier qualification audit

    Expect an audit covering quality management, traceability, calibration, corrective action and social compliance. ISO 9001 is the entry ticket, not the differentiator. Have a corrective action log that shows you close findings, not one that shows you have none.

  5. Framework agreement

    Volume follows qualification, and qualification follows a completed trial. The commercial ask at this stage is a two year framework with a rolling forecast, priced in the currency of the equipment package, with a clear Incoterm and a bonded warehouse option if the buyer consolidates in Asia.

08 · Cost model

Power Is the Bill. Everything Else Is a Rounding Error.

Section 08 of 11

Most site selection decks lead with wages. For a data centre that is the wrong ledger. Run the arithmetic for one megawatt of IT load at 90 percent utilisation on the October 2026 Meralco industrial rate and the shape of the decision becomes obvious.

One megawatt, one year, at 90 percent load

7,884,000 kWh consumed. Priced at the Meralco industrial rate of ₱11.33 per kWh for October 2026.

Annual power spend
₱89.3m
US dollars
about $1.54m
Euros
about €1.32m
Pounds
about £1.16m

At 20 MW that is roughly ₱1.79bn a year, or about $30.8m. At the 90 MW scale of Brent Cross it is roughly ₱8.04bn a year. Exchange rates used: ₱58 to the dollar, ₱67.5 to the euro, ₱77 to the pound. Rates move monthly, so treat these as a planning shape, not a quote.

Now run the wage bill for comparison. Two hundred operations and security staff at the Metro Manila minimum wage of ₱755 a day, paid across 313 days to include the thirteenth month, costs about ₱47.3m a year, or roughly $815,000. At a 20 MW campus, power costs about 38 times the wage bill for 200 people.

That single ratio explains why a developer will pay a premium for a secure connection and refuse to pay a premium for cheap labour. It also explains why the Philippine pitch should never lead with wages. Lead with MW, energisation date and tenure.

  • Industrial power₱11.33 per kWh
  • In dollarsabout $0.20
  • In eurosabout €0.17
  • In poundsabout £0.15
  • Metro Manila wage₱755 a day
  • In dollarsabout $13.02
  • In eurosabout €11.19
  • In poundsabout £9.81

Incentives do not fix a power price. They fix a tax line. CREATE MORE gives a registered enterprise 20 percent corporate income tax under the Enhanced Deductions Regime, a four to seven year income tax holiday, then either 5 percent special corporate income tax on gross income or enhanced deductions. PEZA offers a comparable holiday inside an ecozone. Neither changes the ₱11.33. Both change the return on the capital that sits behind it.

09 · Execution path

Five Steps from Site Brief to Energisation

Section 09 of 11

The sequence below is the order a power first developer works in. It is deliberately not the order a property broker will propose, which usually starts with land because land is what the broker is paid on.

  1. Fix the load profile before anything else

    Target IT megawatts, redundancy topology, rack density, cooling type, water strategy and power usage effectiveness. A liquid cooled AI hall and an air cooled enterprise hall ask the grid for very different things, and the difference is settled at the connection study, not at the design review.

  2. Run the connection study before the land search

    Open a conversation with the distribution utility and with the national grid operator in parallel. Ask for available fault level, the nearest substation with headroom, the queue position, and what reinforcement the project would trigger. In the Philippines this is the step that decides whether the business case exists.

  3. Secure land with tenure that matches the debt

    Foreign ownership of land is not available. A long term lease under the Investors' Lease Act is the instrument, and the lease term should be at least as long as the debt tenor, not the depreciation schedule. Confirm the title, the zoning, the flood line and the right of way for the transmission line.

  4. Register the project and sequence the incentives

    Choose PEZA or the Board of Investments based on whether the project sits inside an ecozone and who the customer is. File for CREATE MORE registration, and ask whether the project qualifies for a Green Lane, which compresses permits for strategic investments into a defined working day window.

  5. Build with a declared local content plan

    Name the categories that will be sourced locally before the EPC tender closes, not after. Harnesses, containment, sheet metal, cable trays and site apparel are realistic. A local content plan that names categories, volumes and named suppliers is also the document that turns a permit conversation into an investment promotion conversation.

10 · Questions

What a Supplier, Investor or Visitor Asks First

Section 10 of 11

Short answers, with the caveat where one is needed. Anything that changes quarterly carries the date it was checked.

Does Pure Data Centres Group have any operations in the Philippines?

No. As of November 2026 there is no Pure DC data centre, office or announced project in the Philippines. The company's operating sites are in London, Dublin, Abu Dhabi, Jakarta and Amsterdam, with development in Madrid, London Park Royal, Finland and Saudi Arabia. The nearest site is the 20 MW campus in Bekasi, Indonesia.

What exactly is Pure DC?

A London headquartered developer, owner and operator of hyperscale data centres, founded in 2013 and formerly called Global Data Centres. It designs, builds and operates its own facilities for hyperscale cloud and AI customers, and describes itself as running more than 1 GW of capacity live or under development.

Who backs the company?

Oaktree Capital Management, a global alternative investment manager with roughly $180 billion in assets under management. In the twelve months to November 2026 the platform secured more than $6.2 billion of bank and institutional financing, including a $780 million facility with a $1.1 billion accordion announced on 4 November 2026.

Why would a developer like this look at the Philippines?

Because the government has published a capacity target and is building policy around it. The national AI plan aims for 1.5 GW of AI data centre capacity by 2033, with 400 MW by 2030. The country has 140 MW live, an established industrial corridor in Laguna, Cavite and Batangas, full foreign ownership of data centre operations, and a workforce already accustomed to 24 hour operations.

Is Philippine power too expensive for a data centre?

It is expensive, and pretending otherwise wastes everybody's time. The Meralco industrial rate was ₱11.33 per kWh in October 2026, roughly $0.20. One megawatt at 90 percent load therefore costs about ₱89.3m a year. The competitive argument has to be policy, connectivity and speed to power, not tariff.

Can a foreign company own a data centre in the Philippines?

Yes, 100 percent of the operating company. Data centre operation is not on the foreign investment negative list. Land is different: the Constitution reserves land ownership to Philippine nationals, so the site is held on a long term lease. Most projects also hold the plant and equipment in the operating entity and lease the land from a Philippine vehicle.

What incentives apply?

CREATE MORE gives a registered enterprise 20 percent corporate income tax under the Enhanced Deductions Regime, a four to seven year income tax holiday, then 5 percent special corporate income tax on gross income or enhanced deductions. PEZA offers a comparable holiday for locators inside an ecozone. Strategic projects can apply for a Green Lane, which compresses permit processing into a defined window.

What can a Philippine supplier realistically sell into a campus build?

Cable harnesses and looms, sheet metal and containment, cable trays, panel assemblies, mechanical fabrication, site apparel and PPE. The imported core is chillers, generators, uninterruptible power supplies and the IT load itself. A supplier that pitches the imported core wastes the meeting. A supplier that brings a test report and a paid first article offer gets a second one.

Is the country ready for AI training campuses?

Not at training scale, and the market data says so. At 140 MW live, the Philippines is an inference, enterprise and data sovereignty market first. Training clusters of the kind Pure DC is building in Finland need hundreds of megawatts of firm power at a single point, which is a grid and generation problem the country is still working through. The credible near term ask is a 20 to 50 MW anchored campus, not a gigawatt campus.

11 · Advisory desk

Plan the Site Visit, the Supplier File or the Site Uniform

Tell us whether you are scouting a campus site, qualifying a Philippine supplier or fitting out a launch team. We will map the visit, list the documents each agency will ask for, and quote the apparel the commissioning crew needs before the first rack lands.

Mankilam Main Office, Tagum City

Naungayan Building, Aala Road, Barangay Mankilam, Tagum City, Davao del Norte 8100, Philippines. Production coordination and freight handover for Mindanao shipments.

Mon to Sat, 8:30 AM to 5:00 PM (PHT)

Cagayan de Oro Office

Ficcoville, Iponan, Cagayan de Oro City, Misamis Oriental, Philippines. Account support for buyers consolidating through the Northern Mindanao corridor.

Mon to Sat, 8:30 AM to 5:00 PM (PHT)

Pure DC figures follow the company site portfolio pages, the 4 November 2026 financing release, the 21 July 2026 Brent Cross release, the 15 July 2026 Seinajoki release and the 2026 awards announcements, all checked in November 2026. Philippine data centre figures follow BMI Research estimates published in September 2026, Data Center Operators of the Philippines statements in February 2026, and published operator disclosures from VITRO, STT GDC Philippines, Digital Edge, Digital Halo and A-FLOW. Power figures follow ERC Resolution No. 17, Series of 2026 and the Department of Energy list of existing power plants as of 31 March 2026. Cost benchmarks follow the Meralco October 2026 rate schedule and NWPC Wage Order NCR-28. Pure Data Centres Group has not reviewed or endorsed this page. Tariffs, incentives, entry rules and capacity figures change, so verify each one before committing capital.