Drax Group and the Philippines: Power, Supply Chain and the Visitor Economy

Drax Group operates the UK's largest power station and its largest single source of renewable electricity by output. This briefing sets out how the company works, what it buys, and where the Philippines fits as a biomass market, a data centre buildout, a manufacturing base and a travel destination.

Independent research by RB Advertising. Drax Group plc has not reviewed or endorsed this page.

OriginSelby, North Yorkshire, United Kingdom
SubjectBiomass generation, data centres, supply chain
DestinationManila, Cebu, Davao and the wider archipelago
2,974Employees worldwide, 2025
4.2 MtWood pellets produced, 2025
15.0 TWhBiomass generation, 2025
6.1 GWRenewable and flexible capacity, 2026
4Countries of operation
£5.39bnRevenue, 2025
01 · The company

The Company Behind the Selby Site

Section 01 of 11

Drax Group plc is a London listed renewable energy company built around one very large site in North Yorkshire. It generates electricity from compressed wood pellets, produces those pellets in North America, sells power and services to British businesses, and is now converting part of its estate into data centre capacity.

The story starts with coal. The Selby coalfield was discovered in 1967, construction began the same year, and the first 660 MW unit generated in 1974. By 1986 the station had doubled to just under 4 GW and had become the largest power station in the United Kingdom. It was privatised, sold to AES in 1999, and refinanced in 2005 when Drax Group plc listed on the London Stock Exchange.

The second act was fuel switching. Drax committed to biomass in 2012, converted its first unit in 2013, its second in 2014, its third in 2016, and its fourth in 2018. Coal generation ended in 2023. The Pinnacle Renewable Energy acquisition in 2021 turned Drax into an integrated producer and user of pellets. The 548 million pound Bluefield Solar acquisition, completed in July 2026, added 0.9 GW of solar and wind and marked the first time the group owned those technologies.

Today the group describes itself as the UK's largest single source of renewable electricity by output. It generated 15.0 TWh from biomass in 2025, about 10.6 percent of the country's renewable electricity and roughly 5 percent of total power demand. It employs 2,974 people, operates in four countries, and runs 41 locations including pellet plants, ports, offices and generation sites.

The purpose stated in the annual report is to enable a zero carbon, lower cost energy future, with a target of net zero across the value chain by the end of 2040. That target sits alongside a more complicated present: biomass is dispatchable and firm, but it is also contested on carbon accounting, subsidy and supply chain grounds. A serious briefing has to hold both facts at once.

  • Registered officeDrax Power Station, Selby
  • ListingLSE: DRX
  • Share price857p on 5 November 2026
  • Employees2,974
  • Countries4
  • Locations41
  • Pellet plants14
  • 2025 revenue£5.39 billion
  • 2025 adjusted EBITDA£947 million
  • Net debt£784 million

Why the site matters more than the group chart. Drax is unusual because one estate carries almost everything: 1,000 acres, 4 GW of grid access, four biomass units, cooling water, rail unloading, storage domes and a skilled operations team. Most renewable developers have to assemble those pieces from scratch. Drax already owns them, which is why the data centre partnership announced in November 2026 is credible despite the policy noise around biomass.

02 · Fuel and fleet

Four Units, One Fuel, and a Supply Chain That Crosses the Atlantic

Section 02 of 11

The Drax Power Station site holds four biomass units with about 2.6 GW of combined capacity, inside a 1,000 acre estate with 4 GW of grid access. The fuel arrives by rail and ship from a network of pellet plants that Drax owns, leases and buys from.

Unit 1 660 MW Converted to biomass in 2013, the first unit on the site to make the switch.
Unit 2 660 MW Converted in 2014, building the operating case for the remaining units.
Unit 3 660 MW Converted in 2016, completing the trio of 660 MW biomass units.
Unit 4 645 MW The final unit to leave coal behind, upgraded in 2018.

Where the 5.1 million tonnes went in 2025

Own use at Selby, 61 percent of shipments Third party sales, mainly Asia, 39 percent

Drax produced 4.2 million tonnes of pellets in 2025 and bought a further 1.0 million tonnes from third parties. Shipments reached 5.1 million tonnes. The distinction matters for a supplier: the group is not only a generator buying fuel, it is also a trader with contracted customers in Asia and Europe, and it can buy pellets as well as make them.

Fibre used at Drax Power Station in 2025, by country of origin
SourceShareWhat the supply chain looks like
United States South60.3%Sawmill residues, thinning material and low grade roundwood from privately owned working forests across the South. Seven pellet plants operated in 2025, with two small satellite plants closed by year end.
Canada29.1%Mainly sawdust and sawmill residues from British Columbia and Alberta. The Williams Lake plant closed in December 2025, and Canadian pellets stop supplying Selby from April 2027 under the new contract.
Latvia and Estonia9.5%Sawmill residues and roundwood from the Baltic States, moved by sea into the Humber and other UK ports.
Portugal, Brazil, Lithuania, UK1.1%Small volumes that round out the blend and meet sustainability and traceability requirements.

The 2027 change is structural, not cosmetic. The low carbon dispatchable contract signed with the UK government in November 2025 runs from April 2027 to March 2031. It requires 100 percent sustainably sourced biomass, tightens the supply chain emissions threshold to 131.76 kgCO2e per MWh, and excludes material from primary and old growth forests. It also lowers contracted volumes, which is why Canadian pellets leave the Selby supply chain and the Canadian business pivots to Asian customers.

03 · The 2026 reset

The 2026 Reset: Policy, Carbon and Compute

Section 03 of 11

Three things happened to the Drax story in the last eighteen months. The British government signed a new support contract, the flagship carbon capture project stepped back, and the site found a second life as a data centre campus. Each one changes what the company needs from its supply chain.

2012

The biomass commitment

Drax announces the conversion of three units to compressed wood pellets and begins rebuilding the fuel handling system.

2018

Four units and a pilot

The fourth unit leaves coal, and Drax announces Europe's first bioenergy carbon capture pilot at the Selby site.

2023

Coal ends

Commercial coal generation had already stopped in 2021. The official end of coal at Drax is marked in April 2023.

2025

The 2027 contract

A low carbon dispatchable contract is signed in November, covering April 2027 to March 2031 with tighter sustainability tests.

2026

Reset and reuse

Carbon capture is written down, Bluefield Solar is acquired, and a 20 billion pound data centre partnership is announced.

Policy: a contract that runs to 2031

The new contract is the financial spine of the next five years. Press coverage put the support at around 470 million pounds a year, and the company describes the structure as a low carbon dispatchable contract rather than the older renewable obligation regime. It rewards firm capacity, not just megawatt hours, which is the whole argument for biomass in a grid with more wind and solar.

Carbon: the project that stepped back

In February 2026 Drax wrote off 48 million pounds on bioenergy with carbon capture and storage and said the project was less likely to proceed in the short to medium term. The 2 billion pounds originally earmarked for carbon capture was redirected toward battery storage and systems management. In August 2026 the Environment Agency granted a permit variation allowing carbon capture at Selby, so the option is still alive, but a final investment decision has not been taken.

That sequence matters to a supplier or a host country. The company is still a biomass generator with a carbon removal ambition, not a carbon removal company with a power station attached. Plans should be read in that order.

Compute: the site that found a second life

On 3 November 2026 Drax, Brookfield, Radiant and Qai announced a partnership to develop gigawatt scale data centre capacity at Drax Power Station. Brookfield estimates total investment could exceed 20 billion pounds, including 2.5 billion pounds for a first phase of up to 100 MW from the first quarter of 2028, ramping to 500 MW between 2028 and 2031. The first phase still needs planning consent, network approvals and a tenant.

The logic is straightforward. A data centre needs firm power, grid access, cooling water and fibre. The Drax estate already has all four, plus 1,000 acres of land. The same logic applies to the Philippines, where grid access and renewable power are the binding constraints on the data centre pipeline.

04 · The Philippine opening

Why the Philippines Fits the Next Stage

Section 04 of 11

Drax has no announced power station, pellet plant or data centre in the Philippines. The fit is not an existing footprint. It is a set of conditions that line up with what the company already does: firm renewable capacity, a grid that needs dispatchable power, a data centre buildout, and a manufacturing base that can supply the equipment and the people.

31.2%of installed capacity

A renewable base that still needs firm power

IRENA counted 10,436 MW of renewable capacity at the end of 2025, or 31.2 percent of the country's installed capacity. The generation share is lower, about 25 percent, because coal still carries baseload. The official target is 35 percent of generation by 2030 and 50 percent by 2040. That gap is the market for dispatchable renewable capacity, which is exactly what biomass and pumped storage provide.

Policy demand
1.5 GWAI capacity by 2033

A data centre pipeline with a power problem

The AI Infrastructure Masterplan launched in September 2026 targets about 400 MW of AI ready capacity by 2030 and 1.5 GW by 2033, from roughly 50 MW today. Industry counts put live data centre capacity nearer 140 MW, with 43 MW under construction and 221 MW planned. The constraint is not demand. It is renewable power, grid connection and permits.

Grid constrained
441PEZA ecozones

A factory base that already exports

PEZA hosts 441 economic zones and more than 4,400 registered firms, about 13 percent of GDP. The Board of Investments approved 900.06 billion pesos of investment in the first nine months of 2026, up 53 percent, across 207 projects and 21,524 jobs. Electronics, garments, fabrication and business services already sit inside those zones, which is where a new supplier would land.

Factory ready

The honest position. Drax's nearest corporate office to the Philippines is in Tokyo, opened in July 2022 to serve Asian pellet customers. Asia generated 251.2 million pounds of revenue in 2025. Canadian pellets stop supplying Selby in April 2027, and the Canadian business continues to sell into Asia. A Philippine entry would be a new market for that trading and engineering machine, not a relocation of an existing one.

05 · Biomass ledger

The Biomass Ledger: What the Country Already Runs

Section 05 of 11

The Philippines is not starting from zero. It already runs 815 MW of bioenergy, including 480 MW of bagasse cogeneration at sugar mills, and the Department of Energy has awarded projects with about 630 MW installed. The larger figure of 4,449.54 MW is resource potential, not built capacity.

Awarded biomass projects with installed capacity as of 31 July 2026
Island groupInstalledFeedstock baseWhere the plants sit
Luzon176.4 MWRice husk, bagasse and waste to energy, with the deepest industrial load and the largest grid.Isabela, Bulacan, Nueva Ecija, Bataan, Pampanga and Metro Manila.
Visayas333.8 MWBagasse cogeneration around the Negros sugar mills, plus rice husk and biomass from Iloilo and Cebu.Negros Occidental, Negros Oriental, Iloilo and Cebu.
Mindanao120.4 MWBagasse from Bukidnon and South Cotabato, rice husk, coconut residue and wood processing waste.Bukidnon, South Cotabato, Davao, Surigao del Sur and Zamboanga del Sur.
Total awarded630.6 MWThe awarded list includes plants in commercial operation and a smaller development pipeline.Luzon, the Visayas and Mindanao.

The three totals do not measure exactly the same thing. IRENA's 815 MW is installed bioenergy capacity, including 766 MW of solid biofuels, of which 480 MW is bagasse cogeneration, and 49 MW of biogas. The Department of Energy's awarded list counts projects with an award, which includes commercial plants and projects still in development. The 4,449.54 MW potential figure is a resource estimate across rice husk, bagasse, coconut and other residues. A supplier should use the smaller number for equipment demand and the larger number for site selection.

160 MWOffered in GEA-6
120 MWStandalone biomass
40 MWCogeneration
Q4 2026Auction window

The sixth Green Energy Auction is dedicated to biomass. Delivery runs from July 2027 to December 2030, the auction was set for the fourth quarter of 2026, and awards were targeted for early 2027. This is the first dedicated biomass round after a difficult history: 230 MW was offered in 2022 and only one 34 MW project bid, the 2023 round drew no bids, and biomass received no allocation in the third, fourth and fifth rounds.

The resource is not the constraint. The auction design is. The Biomass Renewable Energy Alliance of the Philippines argues that fixed peso tariffs without feedstock or logistics indexation make projects hard to finance over twenty years. That is a bankability problem, not a fuel problem. A developer with a long term offtake, a feedstock supply agreement and a grid connection is in a different position from one bidding a flat price into a volatile diesel and labour market.

06 · Supply chain

The Supply Chain Map: What Drax Buys and Where the Philippines Fits

Section 06 of 11

A group with 2,974 employees, 14 pellet plants, more than 200 generation sites and a gigawatt scale data centre build buys in six broad categories. The Philippine match is strongest where metal fabrication, electronics, garments and PPE meet an English speaking industrial workforce.

Capability match, not a contract list
CategoryWhat the operation needsPhilippine capabilityCluster
Pellet mill wear partsDies, rollers, hammer mill screens, bearings and replacement assemblies that keep 14 plants running.Precision machining, castings and heat treatment for agricultural and industrial equipment.Cavite, Laguna, Cebu
Bulk handling and fabricationConveyors, bucket elevators, chutes, silos, storage domes and structural steel for port and plant upgrades.Structural steel fabrication, plate work and site erection for heavy industry.Subic, Clark, Batangas
PPE and workwearFlame resistant and anti static clothing, high visibility vests, corporate uniform and site issue for staff and contractors.Garment and workwear lines with export experience and English language account teams.Metro Manila, Laguna, Cavite, Tagum
Electrical and controlsWiring harnesses, control panels, sensors, motor starters and retrofit kits for plant and data centre systems.Electronics manufacturing, wire harness assembly and panel building inside PEZA zones.Cavite, Laguna, Batangas
Data centre fit outBusway, cable tray, containment, cooling components, racks and prefabricated modules for the 100 MW first phase.Sheet metal, fabrication, electronics and mechanical assembly for the same export platforms.Laguna, Cavite, Clark
Packaging and logisticsBulk bags, cartons, pallets, container loading and port handling for pellets, parts and apparel.Packaging suppliers, freight forwarders and container yards at four international gateways.Manila, Batangas, Cebu, Davao

No announced sourcing programme. Drax has not published a Philippine procurement plan. The table is a capability match based on what the company says it operates and buys, not a list of existing contracts. The right first move is a capability pack with certifications, capacity, lead times and a trial order, not a claim of a relationship that does not exist.

07 · Visitor route

From the Humber to the Archipelago: A Visitor Route

Section 07 of 11

A Drax site visit starts in Selby, about 25 minutes from York by train and about two and a half hours from London. A Philippine visit starts with a long flight and then a short domestic hop to one of 7,641 islands. Three routes cover the main business and leisure stops without pretending that one trip can see the country.

3 to 5 days

Luzon: Manila and the rice terraces

  • Land in Manila, take meetings in Makati or Bonifacio Global City, and use the light rail rather than a car at peak hour.
  • Fly or drive north to Banaue and Sagada for the rice terraces, hanging coffins and mountain air.
  • Best from December to May, when the rice terraces are green and the roads are dry.
5 to 7 days

Visayas: Cebu, Bohol and Negros

  • Use Cebu as the business base, then take a fast ferry to Bohol for the Chocolate Hills and the tarsier sanctuary.
  • Cross to Negros for the sugar mills that already run bagasse cogeneration, and for the upland food scene around Bacolod.
  • Best from January to May, outside the peak of the wet season.
4 to 6 days

Mindanao: Davao, Samal and Siargao

  • Land in Davao, visit the production floor in Tagum, and take the ferry to Samal for the beach and the dive sites.
  • Add Siargao for surfing and island hopping, or Bukidnon for the pineapple and sugarcane belt.
  • Best from February to May. Carry cash for provincial transfers and confirm boat schedules before booking.
EntryUnited Kingdom passports enter visa free for 30 days, with a passport valid six months beyond departure, an onward ticket and the eTravel form inside 72 hours.
AirNo scheduled nonstop flight from the United Kingdom. From Yorkshire, start at Manchester and connect through Doha, Dubai, Abu Dhabi, Istanbul, Singapore or Hong Kong. Allow 18 to 22 hours.
TimeThe Philippines runs on UTC plus eight. That is eight hours ahead of the United Kingdom in winter and seven hours ahead in summer.
SeasonThe dry season runs from December to May. The wet season from June to November brings typhoons, ferry cancellations and higher travel insurance.

The market is larger than the leisure image suggests. The country recorded 6.48 million arrivals in 2025 and earned 694 billion pesos in receipts, and tourism contributed 8.1 percent of GDP while supporting 7.70 million jobs. The United Kingdom supplied 132,370 arrivals in the first eight months of 2026, inside the top ten source markets. A business trip that adds two leisure days is not a detour. It is how the visitor economy and the investment case reinforce each other.

08 · Cost benchmarks

Cost Benchmarks for a 2027 Site Model

Section 08 of 11

These are first pass benchmarks, not a quotation. They are enough to size a model and decide whether a site visit is worth the airfare. They are not enough to sign a lease, a power contract or a supply agreement.

Indicative operating inputs, October 2026
InputBenchmarkApproximate conversionsWhat to watch
Industrial power, Meralco franchise₱11.33 per kWhabout $0.18 / €0.16 / £0.13The October 2026 all in rate for the industrial class. Commercial was ₱12.88 and residential ₱15.06. Large users also carry demand charges, so model the billed peak, not just the energy charge.
Minimum wage, National Capital Region₱755.00 per dayabout $12.01 / €10.48 / £8.99Effective from 26 September 2026 under Wage Order NCR-28. Regional boards set lower rates outside the capital. Add thirteenth month pay, statutory contributions and shift premiums.
20%

Corporate income tax

The Enhanced Deductions Regime under CREATE MORE, Republic Act 12066, against the 25 percent standard rate.

4 to 7

Income tax holiday

Years of holiday for a registered export enterprise, followed by the 5 percent special corporate income tax or enhanced deductions.

3 to 20

Green Lane days

Working days for licences and clearances on a strategic project under Executive Order 18, subject to the agency and the permit.

Power is the counterweight. Philippine electricity is not cheap. Ember found that Meralco's residential tariff was the highest in Southeast Asia in May 2026, with commercial second and industrial third in the region. A 24/7 operation has to model demand charges, power factor, standby generation and the option of a renewable PPA. The low wage line is real, but it does not cancel the power line.

09 · Execution path

The Execution Path: Five Steps from Brief to Site Visit

Section 09 of 11

A biomass or data centre entry is a sequence, not a decision. The order below keeps the cheap checks ahead of the expensive commitments, and it ends with a site visit that produces documents rather than impressions.

Audit the feedstock before the site

Map a 50 kilometre radius for rice husk, bagasse, coconut shell and wood residue. Record volume, moisture, calorific value, seasonality, current buyers and the price they pay. A plant that cannot secure fuel for twenty years is a real estate project, not an energy project.

Secure the grid and the land

Check the NGCP connection point, the distribution utility, the substation capacity and the land title. Confirm the zoning, the environmental clearance route and whether the project qualifies for a Green Lane. Grid delay is the most common reason a Philippine renewable project misses its delivery date.

Choose the vehicle

An RE service contract with the Department of Energy, a Board of Investments or PEZA registration, a joint venture, or a supply contract to an existing generator. Biomass has been open to 100 percent foreign equity since DOE Circular DC2019-10-0013, and the 2022 circular removed the nationality restriction on RE service and operating contracts. The practical constraints are land tenure, water permits where relevant, and feedstock contracts, so the structure still needs Philippine counsel before the term sheet.

Lock the offtake

Bid into GEA-6, sign a bilateral power supply agreement with a distribution utility, or contract directly with an industrial load. Model a fixed tariff against indexed feedstock and logistics, because the auction price is fixed while diesel, labour and hauling are not.

Visit, verify and dress the team

Walk the site, meet the utility, inspect the port and check the feedstock yards. Bring the documents back to the investment committee. When the project moves, the launch team needs site issue: high visibility workwear, corporate uniform and PPE that can be replaced on a Philippine production cycle. Corporate apparel programs and high visibility safety wear are the two starting points.

10 · Questions

Questions a Drax Supplier or Visitor Asks First

Section 10 of 11

Short answers to the questions that decide whether the next step is a phone call, a data request or a flight.

Does Drax Group have any operations in the Philippines?

No. Drax's announced operations are in the United Kingdom, the United States, Canada and Japan. The nearest corporate office is in Tokyo, opened in July 2022 to supply Asian pellet customers. There is no Drax pellet plant, power station or data centre in the Philippines as of November 2026.

Why would a biomass generator look at the Philippines?

Three reasons: feedstock, policy and market. The country has about 815 MW of bioenergy capacity, 480 MW of it bagasse cogeneration, and the Department of Energy estimates 4,449.54 MW of biomass potential. It targets 35 percent renewable energy in the generation mix by 2030 and 50 percent by 2040. GEA-6 offers 160 MW of biomass in the fourth quarter of 2026.

How much biomass capacity does the Philippines have?

IRENA counted 815 MW of bioenergy at the end of 2025, including 766 MW of solid biofuels and 49 MW of biogas. Department of Energy awarded projects had about 630 MW installed as of 31 July 2026. The larger figure of 4,449.54 MW is resource potential, not installed capacity.

Can a foreign company own 100 percent of a Philippine biomass plant?

Yes. The Department of Energy opened biomass generation to 100 percent foreign ownership in 2019 through Circular DC2019-10-0013, and the 2022 circular removed the nationality restriction on RE service and operating contracts. The constraints are land tenure under the Constitution, water permits where a project diverts water, and feedstock contracts, so structure the land and fuel side with counsel.

What incentives apply to a manufacturing or energy project?

CREATE MORE gives registered enterprises 20 percent corporate income tax under the Enhanced Deductions Regime, a 4 to 7 year income tax holiday, then 5 percent special corporate income tax or enhanced deductions. PEZA offers 4 to 7 years then 5 percent special corporate income tax inside an ecozone. Green Lanes cover strategic projects in 3 to 20 working days.

Do United Kingdom passport holders need a visa?

No for stays of up to 30 days. Carry a passport valid six months beyond departure, an onward ticket and an address in the country. Register on eTravel within 72 hours before arrival. Extensions are handled by the Bureau of Immigration in country.

How do you get from North Yorkshire to Manila?

There is no scheduled nonstop flight from the United Kingdom to the Philippines. From Yorkshire, the practical route starts at Manchester and makes one stop through Doha, Dubai, Abu Dhabi, Istanbul, Singapore or Hong Kong. Allow 18 to 22 hours door to door and expect to land the next day because of the eight hour time difference in winter.

What can a Philippine supplier sell to a company like Drax?

The realistic categories are pellet mill wear parts, bulk handling fabrication, electrical harnesses and panels, data centre fit out components, packaging and PPE. Drax has not announced a Philippine sourcing programme, so the first step is a capability pack and a trial order, not a claim of an existing contract.

11 · Advisory desk

Plan the Visit, the Supply Chain and the Site Uniform

Tell us whether you are scouting a biomass site, a data centre campus or a manufacturing zone. We will map the visit, flag the documents each agency will ask for, and quote the apparel that the launch team needs when the project opens.

Mankilam Main Office, Tagum City

Naungayan Building, Aala Road, Barangay Mankilam, Tagum City, Davao del Norte 8100, Philippines. Production coordination and freight handover for Mindanao shipments.

Mon to Sat, 8:30 AM to 5:00 PM (PHT)

Cagayan de Oro Office

Ficcoville, Iponan, Cagayan de Oro City, Misamis Oriental, Philippines. Account support for buyers consolidating through the Northern Mindanao corridor.

Mon to Sat, 8:30 AM to 5:00 PM (PHT)

Drax figures follow the 2025 Annual Report and Accounts, the 2025 full year results, the 3 November 2026 data centre release, the February 2026 results and the 17 September 2026 trading update. Philippine figures follow the Department of Energy awarded biomass list as of 31 July 2026, IRENA Renewable Capacity Statistics 2026, the GEA-6 terms of reference, the Meralco October 2026 rate schedule, Department of Tourism arrivals, and 2026 releases from PEZA and the Board of Investments. Drax Group plc has not reviewed or endorsed this page. Rates, incentive terms, flight schedules and entry rules change, so verify each one before committing capital or booking travel.