Carmona · Cavite · City since 2023
Sublimation Printing Services in Carmona
Jerseys, barangay league kits, school intramural sets, subdivision team uniforms, factory shift shirts, and volunteer apparel. Print sits inside the polyester, so a name or a designation still reads after a full season of games and washing.
Five Groups in a New City
Carmona only became a city in 2023, and it still carries the shape of a town that grew around a highway and a working population. Orders come from barangay leagues, schools, subdivisions, and factory floors. The sublimation printing catalog covers production if you need that first.
Barangay Leagues
Basketball and volleyball across the fourteen barangays, including the numbered Poblacion ones. A league order usually covers eight teams in one run, with a colourway and bundle label for each.
School Programs
Intramural kits, recognition day shirts, and student organisation sets. House colourways and section numbers print in one pass, from the youngest section to the graduating class.
Subdivision Teams
Resident leagues in the Maduya and Milagrosa side order per cluster. Gate drops are booked through the association office so a courier is not waiting during a game.
Factory and Warehouse Crews
Shift shirts with printed role colouring for plant and warehouse teams. A printed band sits flat, so it does not catch on equipment the way a stitched patch can, and it survives daily washing.
Volunteers and Health Workers
Barangay health workers, clean up crews, and feeding program volunteers order matching shirts with bright printed panels that make a team easy to spot.
Price per Piece, Four Currencies
The peso figure is what an order quotes against. Conversions follow the header switcher and are approximate.
Names and numbers included. A run opens at twelve pieces and steps down at fifty, one hundred, and three hundred.
Five Weights and Where They Fit
A court and a plant floor want different things from a shirt. The weight follows the work.
| Knit | Weight | Use |
|---|---|---|
| Microdex | 140 to 150 GSM | Volunteer shirts and fun runs |
| Polydex | 150 to 165 GSM | League sets and school kits |
| Honeycomb | 170 to 180 GSM | School and plant collared uniforms |
| Interlock | 180 to 200 GSM | Heavier varsity pieces |
| Spandex blend | 200 to 220 GSM | Compression pieces and panels |
All Fourteen Barangays
Every barangay is on the dispatch list, including the eight numbered Poblacion barangays. The seat of city government sits in Barangay 4.
- Bancal
- Barangay 1
- Barangay 2
- Barangay 3
- Barangay 4
- Barangay 5
- Barangay 6
- Barangay 7
- Barangay 8
- Cabilang Baybay
- Lantic
- Mabuhay
- Maduya
- Milagrosa
When the City Orders
League play and the school year set the pace, with plant accounts refreshing uniforms in the last quarter.
League registration and the first school orders of the year.
Summer league finals, graduations, and school opening kits.
Intramurals and wet season games moving under cover.
Year end tournaments, plant uniform refreshes, and holiday crews.
Four Steps
Two of them need you: the brief and the approval. The rest is the floor.
- Brief. Send the mark, the roster with sizes, and the date. Knit and quantity come back the same day.
- Proof. A scaled mockup returns with the artwork placed. One revision pass is included.
- Production. Five to seven working days, with each name checked against the signed sheet.
- Dispatch. Bundles tagged per barangay or team, released with tracking.
Carmona Buyer Questions
Coverage, league runs, plant shirts, and payment.
Do you deliver to all 14 barangays of Carmona?
Yes. All fourteen are covered, including the eight numbered barangays and the named ones: Bancal, Cabilang Baybay, Lantic, Mabuhay, Maduya, and Milagrosa. Factory drops are scheduled around shift changes when a plant asks for it.
How many pieces does a barangay team need?
Twelve for one design, which covers a full roster with spares. A league with eight teams can order all eight in one run, with a colourway and bundle per team.
Can you supply shift shirts for factory crews?
Yes. Plants order role colour shirts with printed designations, because a printed band stays flat against the fabric and does not catch on equipment the way a stitched patch can.
How long is production and delivery?
Production runs five to seven working days and transit into Cavite adds three to five. Because Carmona sits along the highway between Cavite and Laguna, courier coverage is straightforward and rarely adds a day.
Which knit suits the inland heat?
Open courts suit 140 to 160 GSM polydex, which dries quickly after a game. Collared school and factory uniforms suit 170 to 180 GSM honeycomb, which holds a collar through a long shift.
What is needed to start?
The team mark, a roster with sizes, and the date the shirts have to arrive. If the mark only exists as a photo, our team redraws it before the mockup stage.
Is there a Carmona branch?
No. Everything is produced in Tagum City and Cagayan de Oro and shipped here. Nothing is subcontracted to a local shop, so the approved colour reference stays on one production line.
How does payment work?
Half on approval and half before release. Official receipts are issued, and BIR 2307 details can be prepared for schools, factories, and registered businesses.
Request a Carmona Quote
Send the barangay or plant, the group, the headcount, and the date. A mockup and a rate card come back, usually within one working day.
