Cebu City · 80 Barangays · Queen City of the South

Sublimation Printing Services in Cebu City

Jerseys, Sinulog crew and volunteer shirts, IT park office kits, university intramural sets, barangay league uniforms, and hospitality apparel. Colour fuses into the polyester, so a festival mark or a roster name survives the parade, the shift, and the wash.

964,169 Residents, 2020
80 Barangays
2 Districts
12 pcs Minimum
Who orders01

Six Groups in the Queen City

Cebu City holds the port, the IT corridor, the universities, and the festival, all inside 80 barangays. That mix means orders arrive from very different calendars, so the brief changes by group. The sublimation printing catalog covers production if you need it before pricing.

Sinulog and Festival Committees

Crew, marshall, and volunteer shirts for the January festival. Printed marks read from a distance in a crowd, and a light knit keeps a crew comfortable across a full day on the route.

IT Park and Office Floors

Department colourways, recruitment kits, and sportsfest sets. Most office orders carry four to six colourways with a roster per floor, delivered in one batch and split internally.

Universities and Schools

Intramural kits, recognition day shirts, and student organisation sets. House marks and section numbers print in one pass, from the freshman sections to the graduating class.

Barangay Leagues

Basketball and volleyball across the north and south districts. Kits are bundled per team and labelled per barangay, so a district coordinator distributes without opening every box.

Hospitality and Restaurant Crews

Front desk, service, and kitchen teams order collared pieces with printed marks. Honeycomb knit holds a collar through a shift, and printed bands replace metal fasteners on the floor.

Port and Logistics Crews

Harbour side crews need role colour shirts with large printed numbers. Printed marks sit flat, so nothing catches on equipment during loading, and the fabric handles a full shift outdoors.

Rates02

Price per Piece, Four Currencies

Peso is the contract figure. The dollar, euro, and pound amounts track the live switcher and move with the rate.

Jersey setShirt and shorts, polydex 140 to 160 GSM
₱495.00
about $7.88 · €6.87 · £5.90
Performance shirtMicrodex, quick drying
₱320.00
about $5.10 · €4.45 · £3.85
Collared poloHoneycomb 170 to 180 GSM
₱450.00
about $7.16 · €6.24 · £5.36
League shortsPrinted side panels included
₱280.00
about $4.46 · €3.89 · £3.34

Names and numbers included. Twelve pieces opens a design, with steps at fifty, one hundred, and three hundred.

Fabrics03

Weights for Port Heat and Festival Days

Cebu humidity is steady, and a festival day puts a crew outdoors from morning to night. Weight decides whether a shirt still feels wearable at four in the afternoon.

Knit selection
KnitWeightUse
Microdex140 to 150 GSMFestival crews, marshalls, volunteer shirts
Polydex150 to 165 GSMBarangay league and school intramural sets
Honeycomb170 to 180 GSMHospitality and office collared uniforms
Interlock180 to 200 GSMHeavier varsity and tournament kits
Spandex blend200 to 220 GSMCompression pieces and panels
Coverage04

Eighty Barangays, North and South

The city is divided into a north district and a south district for council representation, and both are on the dispatch list. Every bundle carries the barangay name before it leaves the plant.

  • Basak San Nicolas
  • Labangon
  • Guadalupe
  • Tisa
  • Inayawan
  • Poblacion Pardo
  • Lahug
  • Apas
  • Talamban
  • Mabolo
  • Banilad
  • Capitol Site
North district Upland barangays and the IT corridor
South district City centre, port approach, and the south coast
Calendar05

When Cebu Orders

The festival anchors January, and the school year carries the middle months. Everything else follows the office and league cycles.

January

Sinulog. Crew and volunteer shirts are locked in December, and any shortfall order is a rush.

February to May

League registration and summer play, with graduation and recognition day sets closing the period.

June to September

School opening, intramurals, and office sportsfest planning.

October to December

Year end tournaments, corporate events, and the festival build up that starts before the holidays.

Process06

Four Steps, Two Signatures

The order pauses for your approval and your deposit. Everything between those two points runs on our schedule.

01

Brief

Mark, roster with sizes, and the date. Knit and quantity confirmed the same day.

02

Proof

A scaled mockup returns with artwork placed. One revision pass is included.

03

Run

Five to seven working days, with every roster line checked before packing.

04

Dispatch

Bundles tagged per barangay or department, released with tracking.

Questions07

Cebu City Buyer Questions

Coverage, festival deadlines, office orders, and payment.

Do you deliver across all 80 barangays of Cebu City?

Yes. The city is split into a north district and a south district for council representation, and both are on the dispatch list, from Basak San Nicolas and Labangon through Lahug, Talamban, Mabolo, Apas, and the upland barangays. Bundles are labelled per barangay before they leave the plant.

Can you deliver before Sinulog?

Sinulog in January is the tightest deadline of the year for Cebu. Festival crew and volunteer shirts should be approved by the first week of December so the batch clears production and the courier peak. Anything later depends on whether a production slot is still open.

Do you supply IT park and office floors?

Yes. Department colourways, recruitment kits, and sportsfest sets, usually four to six colourways in one order with a roster per department. Collared pieces use honeycomb knit so the collar survives a full shift.

How do university and school programs order?

One design with a colourway per college or department, each with its own roster. House marks, section numbers, and sponsor blocks print in a single run, and sizes run from freshman to graduating class.

What is the minimum order?

Twelve pieces per design. A single team, one class section, or one festival committee fits at that size, and several groups can share a shipment while staying separately bundled.

How long does delivery to Cebu take?

Five to seven working days in production and three to five days in transit to Cebu. Sea freight is not used for apparel, so batches move by air or by courier with a fixed transit window.

Is there a Cebu City branch?

No. Production is in Tagum City and Cagayan de Oro and the batch ships to Cebu City. Nothing is subcontracted locally, so the approved colour reference stays with one production line.

How does payment work?

Half on approval and half before release. Official receipts are issued, and BIR 2307 details can be prepared for universities, companies, and registered organisations.

Request a Cebu City Quote

Send the barangay or district, the group, the headcount, and the date. A mockup and a rate card come back, usually within one working day.

Mankilam main office, Tagum City · Ficcoville, Iponan, Cagayan de Oro City · Mon to Sat, 8:30 AM to 5:00 PM