Electricity comparison, 2026
Philippines vs Laos electricity: cheap hydro, fragile supply and what a site actually pays
Laos generates some of the cheapest electricity in Southeast Asia and sells most of it abroad. Its published industrial tariff, at US 8.1 cents at high voltage in 2026, is the lowest in this whole series. The Philippines does not match that number and this page will not pretend otherwise. The Philippine case is different: a supply that keeps running through the dry season, a tariff that is not on a legislated escalator, a power expense you can deduct twice, and a retirement visa that keeps your deposit as capital.
The Lao power year
SchematicHigh water Low water and peak cooling demand
Hydropower is 73 percent of installed capacity and 80 percent of output. River flow falls in the hot season while air conditioning demand climbs. In 2023 Laos bought an estimated $240 million of Thai power to cover the gap, and more than $177 million in 2024.
The short answer, in three lines
This page does not claim the Philippines has the cheaper meter against Laos. On the meter, Laos wins and wins clearly at every industrial voltage. What it claims is narrower and more useful: a tariff is not a bill, and a bill is not the cost of running a plant through a dry season.
- 01
Laos wins the tariff, and by a wide margin
Lao high voltage industry is quoted at about US 8.10 cents per kilowatt hour in 2026 before the 7 percent VAT. Meralco industrial is ₱11.33 / $0.180 / €0.16 / £0.13, and even the modelled Mindanao ecozone line is ₱6.80 / $0.108 / €0.10 / £0.08. On a one megawatt load the Lao rate is about 25 percent below the Mindanao ecozone and about 52 percent below Meralco industrial.
- 02
The Philippines wins the delivered kilowatt
Lao tariffs are on a legislated rise: about 12 percent in 2025, about 21 percent in 2026, and at least 2 percent a year to 2029, because the state utility sells below cost. The grid also drops. EDL logged 237 transmission outages and voltage drops in the first half of 2025, plus 2,396 on distribution. A diesel set at about ₱25.90 per kilowatt hour erases the whole tariff advantage after roughly 95 minutes a day of running time against the Mindanao ecozone rate.
- 03
The Philippines wins the month, the market and the visa
Davao costs about $646 a month all in against $968 in Vientiane, roughly 33 percent less, with rent at $280 against $584. Laos has no retirement visa at all, and its general long stay route asks for $20,000 parked in a Lao bank for six months or $40,000 for a year. The Philippine SRRV asks for $15,000 at 50 and above with a pension, and grants indefinite stay with multiple entry.
Read this before the numbers. The Laos industrial tariff is the cheapest comparator in the six page series on this site. If your load is small, your site is inside a managed zone with a dedicated feeder, and you can absorb currency and tariff escalation, Laos is a legitimate answer and this page will not talk you out of it. The case below is for loads large enough that downtime, escalation and tax treatment move the number.
The tariff ladder, line by line
Laos publishes a national schedule with bands by voltage and by customer class. The Philippines publishes a national median and then a separate rate for each utility and each voltage. Both are on the same ladder below, in the same currency family, with the basis written next to every line so nobody confuses a national average with a published band or a modelled ecozone figure.
| Level | Market and band | Rate | Basis |
|---|---|---|---|
| A | Laos, 115 kV general manufacturing | ₱5.02US 7.94 cents, before VAT | EDL schedule for 2025, the base year of the five year plan |
| B | Laos, 115 kV general manufacturing, 2026 | ₱5.11US 8.10 cents, before VAT | EDL notice 0749 schedule, 2026 tariff year |
| C | Laos, 22 kV general manufacturing, 2026 | ₱5.24US 8.31 cents, before VAT | EDL notice 0749 schedule, 2026 tariff year |
| D | Laos, 0.4 kV general manufacturing, 2026 | ₱5.48US 8.68 cents, before VAT | EDL notice 0749 schedule, 2026 tariff year |
| E | Laos, 115 kV special economic zone | ₱5.83US 9.24 cents, before VAT | EDL schedule, zone rate quoted in US dollars |
| F | Laos, national average tariff, 2025 | ₱4.90US 7.76 cents, before VAT | Asian Development Bank estimate from EDL data |
| G | Philippines, Mindanao ecozone high voltage | ₱6.80$0.108 · €0.10 · £0.08 | Modelled indicative line, not a published tariff |
| H | Philippines, Mindanao generation | ₱6.00$0.095 · €0.08 · £0.07 | Generation price only, not a delivered retail tariff |
| I | Philippines, Meralco industrial | ₱11.33$0.180 · €0.16 · £0.13 | Meralco October 2026 published rate |
| J | Philippines, national median residential | ₱12.83$0.203 · €0.18 · £0.15 | Median of 113 grid connected utilities, October 2026 |
| K | Philippines, Meralco residential | ₱15.06$0.239 · €0.21 · £0.18 | Meralco October 2026 published rate |
The line that decides it is B against G. Line B is a published tariff from a state utility. Line G is a modelled indicative figure for a large user inside a Mindanao economic zone, and it is labelled that way everywhere it appears. Treat the comparison as directionally reliable and the exact gap as something to confirm with the zone and the distribution utility before you sign anything.
The household meter, which Laos wins
Lao residential tariffs are progressive and they are the cheapest in this series at the low bands. A Vientiane household pays a fraction of a Davao household for the same consumption. We show the whole ladder anyway, because the gap narrows as consumption rises and because a family that runs several air conditioners is not paying the lowest band.
| Consumption | Vientiane | Davao City | Metro Manila | Vientiane gap to Davao |
|---|---|---|---|---|
| 100 kWh | ₱279.40$4.43 · €3.95 · £3.29 | ₱1,333.00$21.13 · €18.83 · £15.69 | ₱1,506.15$23.87 · €21.27 · £17.73 | ₱1,053.60$16.70 cheaper |
| 220 kWh | ₱757.10$12.00 · €10.69 · £8.91 | ₱2,932.60$46.48 · €41.42 · £34.51 | ₱3,313.53$52.51 · €46.80 · £39.00 | ₱2,175.50$34.48 cheaper |
| 350 kWh | ₱1,397.40$22.15 · €19.74 · £16.45 | ₱4,665.50$73.94 · €65.90 · £54.91 | ₱5,271.53$83.54 · €74.46 · £62.04 | ₱3,268.10$51.79 cheaper |
| 500 kWh | ₱2,214.80$35.10 · €31.28 · £26.06 | ₱6,665.00$105.63 · €94.14 · £78.44 | ₱7,530.75$119.35 · €106.37 · £88.62 | ₱4,450.20$70.53 cheaper |
What the household table does not show
The Laos bill is smaller and the Lao tariff is climbing. Residential rates under the 2025 to 2029 reform rose about 91 percent for the lowest band between January and July 2025, from 355 kip to 679 kip, and the schedule continues upward every month to the end of 2029.
The Livingcost June 2026 comparison puts the whole utility line, electricity, water and garbage, at about $56 a month for one person in Vientiane against $68 in Davao. That is a real lead for Laos on the meter.
Why the month still goes to Davao
Rent is the reason. A one bedroom in Vientiane runs about $586 against $256 in Davao, and a family three bedroom about $1,076 against $467. Household electricity is a line item of a few dozen dollars, so a rent gap of several hundred dollars settles the month before the meter is read.
Internet runs the other way, at about $12.50 in Vientiane against $32.40 in Davao, and this page will not pretend otherwise.
What one megawatt costs for a year
Tariffs per kilowatt hour are hard to feel. A megawatt is not. One thousand kilowatts running at a 60 percent load factor consumes 5,256,000 kilowatt hours in a year. Here is that load priced on every line we have, with the Lao lines carrying their 7 percent VAT and the Philippine lines shown as published.
| Line | Effective rate | Annual cost | Against Mindanao ecozone |
|---|---|---|---|
| Laos, 115 kV industrial park | ₱5.124 | ₱26.93M | 24.6% lower |
| Laos, 115 kV manufacturing | ₱5.469 | ₱28.75M | 19.6% lower |
| Laos, 22 kV manufacturing | ₱5.611 | ₱29.49M | 17.5% lower |
| Laos, 0.4 kV manufacturing | ₱5.861 | ₱30.81M | 13.8% lower |
| Laos, 115 kV special economic zone | ₱6.239 | ₱32.79M | 8.3% lower |
| Philippines, Mindanao ecozone | ₱6.800 | ₱35.74M | Baseline |
| Philippines, Meralco industrial | ₱11.330 | ₱59.55M | 66.6% higher |
This is the honest scoreboard. Every Lao line is below the Mindanao ecozone line and far below Meralco industrial. A power heavy plant looking only at this table should go to Laos, and if power is the only variable in your decision, that is the right call. The rest of this page is about the variables that are not in this table.
The diesel break even, where the tariff advantage dies
A tariff assumes the grid is there. When it is not, a plant runs a diesel set, and diesel in Laos costs roughly $1.40 a litre. At about 3.5 kilowatt hours per litre that is around ₱25.90 per kilowatt hour of generated power, fuel plus a small maintenance allowance, which is between four and five times the Lao grid tariff and nearly four times the Mindanao ecozone line.
Share of the year a site must run diesel to lose the Laos advantage
Modelled at ₱5.469 for Lao 115 kV manufacturing including VAT, ₱6.80 for the Mindanao ecozone line, and ₱25.90 for diesel generation.
Against the Mindanao ecozone rate, about 95 minutes of diesel a day erases the entire Lao tariff advantage. Against Meralco industrial, the Lao tariff survives about seven hours a day, because the Meralco number is so much higher to begin with. The comparison you should run is Laos against a Philippine ecozone, not Laos against Metro Manila.
What EDL's own numbers say
In the first half of 2025 EDL recorded 237 outages and voltage drops across the national transmission system, and 2,396 across the distribution system. The distribution figure was down 1,107 on the year, so the trend is improving, and the base is still high.
Reporting from Vientiane in 2026 describes power cuts at a health clinic two to three times a week, and a children's hospital in Luang Prabang losing power several times a week through the hot season, each outage lasting a few hours. Much of the distribution grid dates from the 1970s, and lines built for a single household now carry whole apartment blocks.
Why a tenant in a managed zone may do better
A tenant inside a Lao special economic zone or industrial park is usually on a dedicated feeder with its own substation, and the park operator will hold a maintenance and restoration agreement that a household does not have. The 95 minute figure is a threshold to test, not a forecast.
Ask the park for its own outage log for the last 24 months, the restoration time commitment, and whether the feeder is backed by a second source. If a park cannot produce that log, the published national figures are the only evidence you have, and they are not reassuring.
Be fair to the Philippines. The Philippine grid is not perfect either. Mindanao peak demand reached 2,775 MW on 12 May 2026 against average available capacity of 3,320 MW from January to July, reserve fell to 98 MW on 31 August, and June produced yellow alerts. No rotating brownouts were reported for the year, and 4,581 MW of committed and indicative projects is lined up to 2031. The difference is the shape of the risk: a reserve margin that narrows in summer against a grid that also imports from its neighbours and exports most of what it makes.
The escalator, the currency and the export book
Three structural facts sit behind the Lao tariff and none of them are about engineering. They are about how the price is set, what currency it is set in, and how much of the country's generation is already promised to someone else.
The escalator is legislated, not forecast
EDL has sold power below cost for years. The Asian Development Bank puts the 2025 average tariff at US 7.76 cents against a projected break even supply cost of US 10.43 cents, a gap of 2.67 cents. The 2025 to 2029 schedule exists to close that gap, and it closes it on consumers.
For a plant signing a ten year lease, that is a cost line with a known direction. The Philippine lines move too, and Davao Light went from about ₱9.71 to ₱13.24 in eight months during 2026, but the Philippine movement is a market that goes both ways against a schedule that only goes up.
The currency sits under the tariff
EDL collects from households in kip and pays most of its power purchase and transmission obligations in US dollars. Kip depreciation since 2022 raised those obligations in local currency terms and contributed to delayed payments to suppliers, according to AMRO.
That is why the reform includes exchange rate and inflation adjustments inside the base tariff. A kip denominated contract inherits the currency risk. A Philippine contract is in pesos, and an exporter selling in dollars carries the same currency question on the revenue side, where it can be hedged against a receivable rather than against a cost base.
The export book explains the outages. Laos built generating capacity for export, much of it with foreign loans, without matching investment in transmission and distribution at home. The World Bank estimated a domestic surplus of 8,100 GWh in 2021 rising to 16,900 GWh by 2025, enough for 10.1 million people at 2023 consumption rates, in a country of about eight million. Generation is not the constraint. Getting it to a factory in the hot season is. Nam Ngum 3, a 480 MW EDL plant, is due for trial operation in November 2026 and full operation in 2027, alongside 680 MW of solar across twelve sites.
Solar, where a high tariff becomes an asset
A cheap grid tariff is bad news for rooftop solar. The saving from a panel is the grid rate you avoid, so the lower the rate, the longer the payback. This is the one place where the Philippine electricity price works in the Philippines' favour, and the effect is large enough to change a site decision.
The payback numbers
Ember's May 2026 analysis puts the payback period for Philippine rooftop solar at 3.1 years for residential, 2.3 years for commercial and 3.1 years for industrial. Those figures fell from 4 years, 3 years and 3.9 years a year earlier, as retail prices rose and panel costs fell about 10 percent.
The same analysis found the Philippines now has the costliest residential electricity in Southeast Asia, the second highest commercial price and the third highest industrial price. That ranking is the reason the payback is short. The high tariff is the subsidy.
The rules that make it usable
- Net metering up to 100 kW, with the credit applied against the account rather than paid out in cash.
- Retail choice from 26 June 2026 at 100 kW. The ERC lowered the contestability threshold from 500 kW, so a medium factory can now contract directly with a retail electricity supplier instead of taking the distribution utility default.
- Full foreign equity in renewables under RA 11659, so an investor can own the generation as well as the roof it sits on.
- Dedicated substations inside PEZA and other economic zones, which is how large locators get high voltage supply in the first place.
Laos is not standing still on solar. EDL runs a rooftop purchase programme under ten year contracts, and the emergency plan adds 680 MW of utility solar. The structural difference is that a Lao rooftop displaces a tariff near US 8 cents, while a Philippine rooftop displaces a tariff near US 18 cents at Meralco industrial, so the Philippine array earns its capital back in roughly a third of the time.
The tax treatment is the second bill
For a registered exporter, the power line does not end at the meter. The Philippines lets a registered business enterprise deduct the whole electricity bill twice, and buy local power at zero rated VAT. That is a direct subsidy on the exact cost Laos wins on, and it closes part of the gap without touching the tariff.
Philippines, CREATE MORE
- 100 percent additional deduction on power expense under the enhanced deductions regime, raised from 50 percent by the CREATE MORE Act of 2024. The bill is deducted from taxable income, then deducted again.
- Zero rated VAT on local electricity for a registered export enterprise, for the whole registration period.
- Corporate income tax at 20 percent under the enhanced deductions regime, or a special corporate income tax of 5 percent of gross income in lieu of national and local taxes.
- Income tax holiday of 4 to 7 years depending on location and sector tier, with a longer combined package outside the capital region.
- Duty exemption on imported capital equipment, raw materials and spare parts attributable to the registered project.
Laos, investment promotion
- Profit tax holidays and duty relief in promoted sectors and in special economic zones, under the investment promotion framework.
- Zone power rates quoted separately from the national schedule, and often denominated in US dollars rather than kip.
- The electricity bill carries 7 percent VAT and there is no equivalent power expense deduction in the tax code.
- Least developed country status brings trade preferences that matter for garment and footwear assembly, and the timetable for graduation is the clock on that advantage.
The honest summary: Laos front loads relief into construction and the early years. The Philippines targets the operating cost, and it does so on the line that never stops running.
Run the two together before you decide. A 100 percent additional power deduction is worth the corporate tax rate applied to the whole bill. At 20 percent, that is a real discount on every kilowatt hour, and it applies to the Philippine tariff rather than the Lao one. Ask your tax adviser to model it against your actual registered activity, because the deduction only applies to power used for the registered project and only where the substantiation rules are met.
What a locator gains beyond the meter
Power is one line in a site decision. The other lines are how the goods leave, who buys them, who makes them and what language the supervisor speaks.
Laos, the small home market
- Landlocked. Every sea container transits Thailand or Vietnam before it reaches a port.
- About eight million people and roughly 2,000 MW of domestic demand, against 5,075 MW installed.
- A thin industrial labour pool in a country of that size, with a limited base of English speaking supervisors.
- Real strengths: low tariffs, low wages, trade preferences, and a government that wants export industry.
Philippines, the large home market
- Islands with ports. Direct sailings to the United States, the European Union, Japan and Korea, and the Davao container terminal on the same island as the Mindanao grid this page describes.
- More than 110 million people, which is a domestic market as well as a workforce.
- English as a business language from the shop floor up, which shortens every supplier, audit and customer conversation.
- Retail electricity choice at 100 kW, and a power expense deduction that no neighbour in this series offers.
One number that matters more than most. As of August 2026, about 11,500 electricity consumers in the 100 to 499 kilowatt band had not yet switched supplier under the new threshold, out of 12,491 eligible customers carrying an estimated 3,646 MW of demand. A new locator arriving now is choosing a supplier at the moment the market opens, not inheriting a decade old contract.
Expats and retirees, where the meter stops mattering
A household electricity bill is a few dozen dollars a month. Rent, healthcare, schooling and the legal right to stay are hundreds. This is the section where the Lao advantage on the meter disappears entirely.
The residence question, which is the real one
Laos has no retirement visa. There is no route that opens on reaching a retirement age, holding a pension or depositing savings. Long stay runs through employment, investment, family, permanent residence or a general long stay category.
The general long stay route asks for at least $20,000 held in a Lao bank for a six month stay, or $40,000 for a year. That money is a balance you must maintain, not a deposit you get back at the end of a defined term, and the category does not itself grant a right to work.
The Philippine route, and what it costs
The SRRV under the Philippine Retirement Authority 2026 Citizens Charter asks for ₱946,500 / $15,000 / €13,369 / £11,139 at age 50 and above with a pension, or ₱1,893,000 / $30,000 / €26,737 / £22,278 without one.
At 40 to 49 it is ₱1,577,500 / $25,000 / €22,281 / £18,565 with a pension, or ₱3,155,000 / $50,000 / €44,562 / £37,131 without one. There is a $1,500 application fee and a $360 annual fee, and the deposit is refundable when you leave.
Property is the quiet difference. In the Philippines a foreigner can own a condominium unit outright. In Laos, land belongs to the national community, permanent land use rights are reserved for Lao nationals, and a foreigner can hold a state lease or concession of up to 50 years, or lease from a Lao citizen for up to 30. A condominium unit can be bought, but the ownership term is tied to the life of the building and the land underneath belongs to someone else. For a retiree putting a life's savings into a home, that is a different proposition, not a smaller one.
Which one, by situation
No page can decide for a specific project. These are the four cases this comparison actually supports, stated plainly, including the two where Laos is the better answer.
- Choose Laos
Your process is power heavy, your site sits inside a managed zone with a dedicated feeder and a written restoration commitment, your power contract is in dollars, and you can absorb a legislated tariff rise to 2029. On the tariff alone Laos is 20 to 25 percent cheaper and the other advantages are real.
- Choose the Philippines
You need the line to stay up, you export by sea, you want a domestic market behind the plant, and your buyers or auditors need an English language supply chain. The Mindanao ecozone line plus the power deduction plus rooftop solar is a stronger delivered cost than the tariff table suggests.
- A close call
A smaller load, under 100 kW, with no dedicated feeder either way and a genuinely short lease. At that size the tariff gap is the biggest number in the decision and the reliability exposure is smaller because there is less capital at risk.
- Not close at all
Retirement and expat living. Laos has no retirement visa, a harder property position and a higher monthly cost of living in this dataset. The household meter is cheaper and it is not the number that decides the move.
Questions readers actually ask
Is electricity cheaper in Laos or the Philippines?
Laos is cheaper, at every industrial voltage and at every household band. Lao high voltage manufacturing is about US 8.10 cents per kilowatt hour in 2026 before the 7 percent VAT. Meralco industrial is ₱11.33, $0.180, €0.16, £0.13. Even the modelled Mindanao ecozone line of ₱6.80, $0.108, €0.10, £0.08 sits above every Lao industrial line.
The narrower question, whether power costs less to actually run a plant on, has a different answer and the rest of this page is about that.
Then why would a manufacturer choose the Philippines?
Because a tariff is not a bill. Three things narrow or close the gap. A registered export enterprise can deduct the whole power bill twice under CREATE MORE and buy local power at zero rated VAT. Rooftop solar pays back in about 3.1 years for industrial users in the Philippines, against a longer payback where the grid tariff is lower. And a plant that must run diesel for more than about 95 minutes a day has already given back the entire Lao tariff advantage against the Mindanao ecozone rate.
How reliable is power in Laos?
Improving and still uneven. EDL recorded 237 outages and voltage drops on the national transmission system in the first half of 2025, and 2,396 on the distribution system, which was down 1,107 on the year. Reporting in 2026 describes clinics and hospitals in Vientiane and Luang Prabang losing power two to three times a week in the hot season, with each cut lasting a few hours.
The structural cause is that Laos built generation for export faster than it built the grid at home. About two thirds of generation was exported in 2023 on World Bank figures, and a former EDL technical expert puts the current share near 80 percent.
Are Lao power tariffs going up?
Yes, by policy. The 2025 to 2029 reform raised tariffs about 12 percent in 2025 and about 21 percent in 2026, and schedules at least 2 percent a year through 2029. The low household band rose about 91 percent between January and July 2025, from 355 kip to 679 kip per kilowatt hour.
The reason is arithmetic. The 2025 average tariff of US 7.76 cents sat below a projected break even supply cost of US 10.43 cents, a gap of 2.67 cents that the schedule is designed to close.
Does Laos import electricity if it exports so much?
Yes, in the hot season. Hydropower is 73 percent of installed capacity and about 80 percent of output, and river flow falls while cooling demand rises. Laos spent an estimated $240 million on Thai power in 2023, a drought year, and more than $177 million in 2024.
The World Bank has noted that production has fallen short of domestic demand and export contracts on several occasions.
Is Mindanao power reliable enough for a factory?
It is not a perfect grid, and the reserve is thin in summer. Peak demand reached 2,775 MW on 12 May 2026 against average available capacity of 3,320 MW from January to July. Reserve fell to 98 MW on 31 August and June produced yellow alerts. No rotating brownouts were reported for the year.
A combined 4,581 MW of committed and indicative projects is lined up to 2031. A large locator inside an economic zone is normally on a dedicated substation rather than the general distribution feeder.
How much does one megawatt of power cost in Laos?
A 1,000 kilowatt load at a 60 percent load factor uses 5,256,000 kilowatt hours a year. At the Lao 115 kV manufacturing rate including the 7 percent VAT, which is about ₱5.469 per kilowatt hour, the annual energy cost is about ₱28,745,064, $455,550, €406,003, £338,297.
At the industrial park rate it is about ₱26,931,744, $426,810, €380,392, £316,956. At the special economic zone rate, which is quoted in dollars, it is about ₱32,792,184, $519,700, €463,165, £385,922. These exclude demand charges where a utility bills them separately.
Can a factory in the Philippines use rooftop solar?
Yes. Net metering is available up to 100 kW with the credit applied against the account. Above that, a manufacturer can use retail competition, a dedicated substation inside a PEZA or ecozone estate, or a renewable supply agreement. Full foreign equity is allowed in solar, wind and geothermal projects under RA 11659.
Ember's May 2026 analysis puts industrial rooftop payback at 3.1 years, down from 3.9 years a year earlier, and commercial payback at 2.3 years.
What is the SRRV deposit in 2026?
Under the Philippine Retirement Authority schedule in its 2026 Citizens Charter, the SRRV Classic deposit is ₱946,500, $15,000, €13,369, £11,139 at age 50 and above with a pension, and ₱1,893,000, $30,000, €26,737, £22,278 without one.
At 40 to 49 it is ₱1,577,500, $25,000, €22,281, £18,565 with a pension, or ₱3,155,000, $50,000, €44,562, £37,131 without one. There is a $1,500 application fee and a $360 annual fee. The older $10,000 and $20,000 figures still circulating online are out of date.
Can a foreigner retire in Laos?
Not through a retirement visa, because Laos does not have one. There is no route that opens on reaching a retirement age, holding a pension or holding savings. Long stay runs through employment, investment, family, permanent residence or the general long stay category.
That general route asks for at least $20,000 held in a Lao bank for a six month stay, or $40,000 for a year, and does not itself grant a right to work. Many retirees use agency arranged work visa packages, but that is an agency practice rather than a published retirement route.
Can a foreigner own property in Laos or the Philippines?
In the Philippines, yes, a foreigner can own a condominium unit outright. In Laos, land belongs to the national community and permanent land use rights are reserved for Lao nationals. A foreigner can hold a state lease or concession of up to 50 years, or lease from a Lao citizen for up to 30.
A condominium unit can be bought in Laos, but the ownership term is tied to the life of the building and the land underneath belongs to the holder of the land right. Verify the exact title and term with a licensed Lao lawyer before any payment.