Digital Realty Trust and the Philippines: Data Centers, Capital and the Investment Case

Digital Realty is the largest listed, carrier neutral data center platform in the world, with 311 facilities and 3.2 gigawatts of IT capacity across 30 or more countries. It has no Philippine campus. This memo sets out how the company actually earns, what it has been buying in Asia Pacific, and the honest case for the Philippines as the next destination on a list like this one.

Independent research by RB Advertising. Digital Realty has not reviewed or endorsed this page. Every figure carries its source and its date, because this sector moves faster than any page can.

01 · The company on file

A Landlord Built for Data Gravity

01

Digital Realty Trust, Inc. was listed on the New York Stock Exchange in October 2004 and has spent two decades buying, building and operating the buildings that cloud and enterprise workloads sit in. It is a real estate investment trust, not a technology company, and that distinction explains almost everything about how it behaves as an investor.

The portfolio at 30 September 2026 was 311 data centers, including 88 held through unconsolidated investments, with roughly 3.2 gigawatts of IT capacity live and 9.8 gigawatts of buildable capacity either under development or held for future development. The footprint spans more than 55 metros in 30 or more countries on six continents. It is the closest thing the sector has to a utility with a global balance sheet.

What it sells is not floor space. It sells proximity: to clouds, to carriers, to internet exchanges, to other enterprises that a customer needs to reach inside a few milliseconds. The company calls the resulting problem data gravity, and its answer is a platform that lets a customer land once and then expand across metros without renegotiating the architecture.

The Philippine relevance is direct. A market that is trying to attract a platform of this kind is not competing on land price. It is competing on whether an anchor campus can be energised, permitted and connected on a schedule that a listed REIT can defend to its shareholders.

Legal name
Digital Realty Trust, Inc.
Listing
New York Stock Exchange, ticker DLR, S and P 500 component
Structure
Real estate investment trust, operating through Digital Realty Trust, L.P.
Domicile
Austin, Texas, United States
Leadership
Andy Power, President and Chief Executive Officer. Matt Mercier, Chief Financial Officer.
Workforce
Approximately 4,280 people
Philippine campus
None announced as of November 2026
Read this first

There is no Digital Realty data center, office or announced project in the Philippines. The company is relevant to the country for two reasons: it is the benchmark against which a Philippine data centre investment case will be judged, and its Asia Pacific capital programme shows what a market has to assemble to win a cheque. This page is an investment destination brief, not a company announcement.

02 · Operating model

Two Engines, One Balance Sheet

02

Digital Realty runs two businesses that look similar from the outside and behave very differently underneath. One signs very large leases with hyperscale cloud customers and waits. The other signs small leases with enterprises, networks and service providers and monetises them through interconnection. The second engine is the one a Philippine market should study first.

The hyperscale engine

A single hyperscale lease can commit a whole building for a decade. It arrives with a long lead time, a demanding power specification and a customer that negotiates hard. In the third quarter of 2026 the weighted average lag between a new lease being signed and rent commencing was 17 months. That lag is the price of the business: capital goes out years before the first rent cheque arrives.

What makes the engine work is the backlog. Signed but not yet commenced leases reached $2.5 billion of annualised GAAP base rent at 100 percent share at the end of the quarter, and $1.8 billion at Digital Realty's share. That backlog is a visible queue of future revenue, and it is the number to watch when judging whether a market is delivering capacity on time.

The interconnection engine

The 0 to 1 megawatt plus interconnection category is where the margins and the stickiness live. In the third quarter it contributed $152 million of the $627 million booked at Digital Realty's share, a record for the category. These are the leases that put a customer's router next to a cloud on ramp, and once a customer has built that topology, moving is expensive.

This is the part of the model that fits the Philippines today. The country's demand base is enterprises, banks, outsourcers, government agencies and cloud providers serving a domestic market. That is a colocation and interconnection business long before it is a 100 megawatt hyperscale business, and the operator that wins the interconnection layer usually gets first refusal on the hyperscale lease that follows.

Third quarter 2026 leasing record, Digital Realty as filed
Metric100 percent shareDigital Realty shareWhat it tells a market
Total bookings$855M$627MRecord demand, signed not yet billed
0 to 1 MW plus interconnectionNot split$152MRecord colocation and interconnection demand
Renewals signed$261M$261MExisting customers staying and paying more
Renewal increase, cash basis11.8%11.8%Pricing power in tight markets
Backlog, annualised$2.5B$1.8BRevenue already contracted but not commenced
Signing to commencement lag17 months17 monthsWhy power and permits decide the winner

Source: Digital Realty third quarter 2026 results, 29 October 2026.

03 · Reported results

The Numbers, as Filed

03

A REIT is judged on funds from operations rather than net income, because depreciation on a data centre is enormous and says little about cash. The table below keeps both, so the difference is visible. All figures are the company's own, for the quarter ended 30 September 2026, unless a date is given.

Reported results and full year 2026 guidance
Line itemFigureBasis
Total revenue$1.9BThird quarter 2026, 21 percent above the prior year
Net income$194MThird quarter 2026
Net income to common$185M$0.48 per share
Adjusted EBITDA$978M13 percent above the prior year
Funds from operations$742M$1.97 per share
Core FFO, excluding net promote$2.10Per share, third quarter 2026
Core FFO, nine months$6.27Per share, January to September 2026
Revenue guidance$7.05B to $7.13BFull year 2026, excluding promote income
Adjusted EBITDA guidance$3.80B to $3.85BFull year 2026
Core FFO guidance$8.30 to $8.35Per share, full year 2026
Same capital cash NOI growth5.25% to 5.75%Full year 2026 guidance
Renewal spreads, cash10% to 12%Full year 2026 guidance
Dispositions and contributions$1.5B to $2.0BFull year 2026 guidance
Annual dividend$4.88Quarterly payments of $1.22

Source: Digital Realty third quarter 2026 results release and 2026 outlook table, 29 October 2026. Market capitalisation and enterprise value from public market data as of 6 November 2026.

Why a Philippine reader should care

The company is guiding to more than $7 billion of revenue and still selling assets. It recycles capital out of mature assets and into markets where demand is undersupplied. That is the behaviour a destination is competing with: not a company looking for cheap land, but a company looking for the highest risk adjusted return on the next dollar, measured against Singapore, Tokyo, Sydney, Mumbai and Jakarta.

04 · Asia Pacific

The Asia Pacific Cheque, and What It Buys

04

In April 2026 Digital Realty put a number on Singapore: nearly S$7 billion of total investment, including more than S$4.3 billion of new data center development. The shape of that commitment is more instructive than the size, because it shows what a winning market actually assembles.

  • Capital, not just a lease. More than S$4.3 billion of the package is new construction, layered on existing assets. A market wins when it can absorb a multi year build programme, not a single building.
  • People, with a local ratio. The Singapore team has nearly doubled in three years to more than 300 employees and is expected to reach 400 by 2030. Around 90 percent are Singapore nationals. Workforce depth is part of the investment case, not a public relations footnote.
  • Operations, physically located. The Global Command Center in Singapore runs round the clock monitoring and response. A regional operating hub creates a second, stickier layer of demand that a pure construction incentive cannot buy.
  • Innovation infrastructure. A Digital Realty Innovation Lab is expected to open at the Loyang facility in the second half of 2026, giving customers a place to test AI and hybrid cloud designs before wider deployment. Early stage quantum data center work is attached to the same ecosystem.
  • An Asia Pacific head office. The regional office moved and expanded to IOI Central Boulevard in July 2025, with further expansion expected in 2026. That is a decision about where senior people live, and it is harder to reverse than a lease.

Where the Philippines appears

On 10 June 2026 a Digital Realty senior director for acquisitions and investments, Woon Teng Koh, appeared on a Data Center Dynamics investment forum panel on tier two Asia Pacific markets covering Thailand, Indonesia, Vietnam and the Philippines. The session framing asked what investment is required for the Philippines to reach its 1.5 gigawatt potential.

That is engagement, not commitment. It should be read as evidence that the Philippine file is open on the desk, not that a cheque is written. A market that wants to convert a panel appearance into a site visit has to arrive with power, land tenure, a permit path and an anchor customer already assembled.

The Singapore lesson

Singapore did not win S$7 billion because it was cheap. It won because a developer could promise a customer power, connectivity, permits and a trained operating team on a predictable schedule, and could hire the people to run it. The Philippines does not need to match Singapore on cost. It needs to match it on certainty, and certainty is a policy product.

05 · Destination test

The Philippines, Graded on Eight Tests

05

This is the centre of the memo. A data centre underwriter does not ask whether a country is promising. It asks eight specific questions, in roughly this order, and it walks away when two or three of them have no answer. The grades below are ours, based on published figures, and each one names the evidence behind it.

Eight underwriting tests applied to the Philippine market, November 2026
TestEvidence on fileGrade
Power quantity and date32,074 MW of installed generating capacity and 27,908 MW dependable across 323 plants in March 2026, against a projected national peak of 21,007 MW for the year. Headroom exists nationally. The constraint is a connection date in Laguna or Cavite, not a national number.Conditional
Power priceThe Meralco industrial rate was 11.33 pesos per kilowatt hour in October 2026, roughly 0.20 US dollars. One megawatt at 90 percent load costs about 89.3 million pesos a year in energy alone. This is not a low cost jurisdiction and should never be sold as one.Gap
Land and tenureRepublic Act No. 12252 extended the maximum aggregate lease of private land for approved foreign investments to 99 years, up from 50 years renewable by 25. The Constitution still keeps land ownership with Philippine nationals. Long tenure is settled. Freehold is not available.Ready
Permits and incentivesCREATE MORE, the 2026 Strategic Investment Priority Plan under Memorandum Order No. 47, and the PEZA ecozone regime together offer a four to seven year income tax holiday, a 5 percent special corporate income tax or enhanced deductions for up to 10 years, and duty and VAT relief on qualifying inputs. Data centres sit in the Tier III frontier technology list.Ready
Fibre and interconnectionMultiple international subsea landings on Luzon, a domestic carrier market with several competing backbone operators, and a live internet exchange scene in Metro Manila. The gap is not international reach. It is the density of on ramps inside individual buildings.Conditional
Customer depth44 facilities and about 140 MW of live capacity, 43 MW under construction and 221 MW planned, per BMI Research in September 2026. Cloud spending is forecast at 2.5 billion US dollars in 2026. Demand is real and small. It is a fraction of what a hyperscale anchor would need.Conditional
Operating talentA large information technology and business process management industry that already runs 24 hour operations, shift rosters and service level reporting, plus a deep electronics manufacturing base. Facility technicians and commissioning staff exist, though specialised high density cooling experience is thin.Ready
Execution riskBMI's project risk metric scores the Philippines 2.57 out of 10 against a global average just above 1.5, with grid constraints and permitting delays named as the drivers. The pipeline is announced faster than it is energised, which is the single largest risk to the national target.Gap

Sources: Department of Energy capacity list for March 2026, Meralco October 2026 rate schedule, Republic Act No. 12252, CREATE MORE, Memorandum Order No. 47, BMI Research September 2026, and PEZA and Board of Investments releases cited below.

The verdict, stated plainly

The Philippines passes four of the eight tests outright, is conditional on three, and fails on two, with power price counted among the failures. That is not a rejection. It is a description of a market that should be entered with an interconnection led product, a renewable power strategy and a patient capital structure, not with a speculative 100 megawatt campus.

The policy case is stronger than the physical case. The national plan has a number, a budget line and a delivery agency. The grid does not yet have the queue discipline to match it. An investor who underwrites the policy without the queue will be disappointed, and an investor who ignores the policy will miss the cheapest window the country has offered in a decade.

The numbers behind the national target

The Philippines AI+ Infrastructure Masterplan 2033 targets 1.5 gigawatts of AI ready data centre capacity by 2033, from roughly 50 megawatts today, with 400 megawatts as a first phase by 2030. The plan carries 34.4 billion US dollars of total investment, of which about 18.2 billion is already covered by existing public and private programmes, leaving roughly 21 billion to be mobilised from private capital.

It also targets about 152,000 GPUs, 500,000 AI related jobs and training for more than 1.3 million professionals. The Department of Information and Communications Technology has put the investment opportunity at around 30 billion US dollars. Those are ambition numbers. The scorecard above is the delivery test.

06 · Site map

Where a Campus Actually Lands

06

The Philippine market is not national. It is a set of six corridors, each with a different power profile, landlord and customer base. A developer scouting the country is really choosing between these rows, and the choice is usually made by the substation rather than the brochure.

Live and announced capacity by corridor, November 2026
CorridorAnchorCapacityStatus
Santa Rosa, LagunaePLDT VITRO50 MWLive, AI ready, the largest single facility in the country
Biñan, LagunaA-FLOW ML1, a FLOW and AyalaLand Logistics joint venture6 MW to 36 MWFirst phase opened November 2025, Board of Investments registration approved 18 November 2025
Cainta, RizalDigital Halo MNL16.5 MW to 70 MWFirst building financed with 2.78 billion pesos from RCBC in January 2026, the first data centre project finance in the country
Fairview, Quezon CityST Telemedia Global Data Centres124 MWFour building campus planned, liquid cooling showroom, NVIDIA DGX ready certification
CaviteePLDT prospective campus100 MW or moreAnnounced, not yet energised
New Clark City, Capas, TarlacENDEC Development and Narra Technology Park300 MWPEZA approved 19 strategic facilities projects in August 2026, including a 32.544 billion peso first phase of powered land
LagunaDAMAC DigitalUp to 250 MWAnnounced after presidential talks in Abu Dhabi, January 2026, under study

Sources: BMI Research September 2026, PEZA August 2026, Board of Investments December 2025, Digital Halo January 2026, and Presidential Communications Office statements January 2026.

The Clark argument

New Clark City is the row to watch for a greenfield investor. It combines a 300 megawatt powered land project, a PEZA approved facilities package and a government that is actively assembling the site rather than waiting for a developer to assemble it. If the Philippines produces a hyperscale anchor in the next three years, the odds favour a corridor where the state has already done the land and power work.

07 · Supply chain

What a Build Actually Buys in the Country

07

Most of a data centre budget leaves the country. Chillers, generators, uninterruptible power supplies, switchgear and the IT load itself are imported, and no amount of industrial policy changes that in the near term. The realistic Philippine opportunity is the fabricated, assembled and consumable layer around the imported core, where freight, lead time and site access favour a local supplier.

Category by category: what is genuinely local, and the question that qualifies it
CategoryWho buys itLocal capabilityThe qualifying question
Cable trays, containment and supportsElectrical and mechanical contractorsSheet metal fabricators in Metro Manila, Laguna and Cavite already serve electronics and semiconductor plantsCan you supply to a stamped drawing with a galvanising certificate and a two week call off?
Enclosures and panel assembliesSystems integrators and electrical contractorsEstablished panel builders with test equipment and licensed electriciansDo you have a type test report, or only a catalogue?
Earthing and lightning protectionElectrical contractorsLocal fabrication and installation crews, imported copper and componentsCan you install to the earthing design and provide as built resistance readings?
Fire stopping and sealingMechanical and electrical tradesCertified applicators for imported systems, labour trained per projectWhich system is specified, and are your applicators certified on that system?
Signage, labelling and wayfindingCommissioning team and facilitiesSignage and print shops with durable substrate experienceWill the labels survive a twenty year life in a hot aisle?
Commissioning consumablesCommissioning agentsLocal distribution and same week delivery, which matters more than unit priceCan you hold stock within 48 hours of the site?
Site workwear and visitor kitConstruction manager, owner team, securityPhilippine garment manufacturing with full sublimation, embroidery and low minimum runsCan you dress a 400 person commissioning crew in matched, branded, high visibility kit inside one production cycle?
Temporary site protectionMain contractorLocal fabrication of barriers, covers and protection framesCan you deliver to a phased site programme rather than a single drop?

Category assessment by RB Advertising, based on published Philippine data centre project scopes and the country's electronics and garment manufacturing base.

The workwear row is the one this desk knows best. A data centre build has an unusual apparel profile: a small owner team that needs to look like the client, a large contractor population that needs high visibility and durability, security and visitor cohorts that turn over weekly, and a commissioning phase where a matched crew is part of how the site is judged. That is a low minimum, fast turnaround, full sublimation problem, which is exactly what Philippine garment manufacturing is good at. See manufacturing workwear in the Philippines for the production detail.

08 · Entry routes

Four Ways In, and What Each One Costs

08

A platform like Digital Realty does not enter a market by renting an office and waiting. It picks one of four structures, and each one demands something different from the destination. The table is written from the investor's side of the desk.

Entry routes compared on speed, control and local requirement
RouteWhat it looks likeFastest realistic timelineWhat the market must provide
Greenfield buildBuy or lease land, register with PEZA or the Board of Investments, build to the platform standardThree to five years to first revenuePowered land, a grid connection date, a permit path and a construction workforce
Joint venturePartner with a Philippine developer or conglomerate that already holds land, power relationships and a licenceTwo to three yearsA credible local partner with a live pipeline, and a governance model both sides can live with
Acquire or lease operating capacityBuy a facility or take a long lease from an operator, then upgrade it to platform standardSix to twelve monthsAssets for sale at a sensible price, and a seller who is not the only buyer in the room
Anchor tenant firstSign a hyperscale or enterprise consortium before committing capital, then build to that contractTwo to four yearsA customer with a Philippine requirement large enough to underwrite a building

The route the Philippines is most likely to win

Joint venture, then acquisition. The country already has operating platforms with land, power relationships and construction experience, and it has a live pipeline of assets that will need a second balance sheet within five years. A greenfield hyperscale campus is the least likely first move, because the customer depth is not yet there to fill it.

The acquisition route has a local precedent. Equinix entered the Philippines in 2024 by acquiring three sites from Total Information Management rather than building. That is a template a large platform can copy quickly when the assets and the price align.

What the destination should do about it

Three things move the needle, and none of them is a brochure. Publish connection dates, not connection queues. Put a named officer on strategic projects with authority to clear a permit. Keep the incentive regime stable across administrations, because a 99 year lease is only as good as the policy that sits on top of it.

The country is already doing part of this. The Strategic Investment Priority Plan puts data centres in the frontier technology tier and the Board of Investments has a Green Lane process for strategic projects. The gap is execution capacity at the local government level, where the building permit actually lives.

09 · Forward view

Five Signals to Watch in 2027

09

A destination case should be falsifiable. These are the five events that would tell an investor the Philippine file is moving from policy to delivery, in the order they are likely to appear.

  • A firm connection date for a new 100 megawatt class campus. Not a memorandum, not a feasibility study. A transmission connection agreement with a date and a capacity number, attached to a named project. Until that exists, the pipeline is a press release.
  • New Clark City converts powered land into a signed anchor. The 300 megawatt ENDEC and Narra project is the clearest test of whether the state can assemble a site that a hyperscaler will take. A signed lease there would change the national conversation.
  • A record PEZA year closes above 311 billion pesos. PEZA approvals reached 309.63 billion pesos by October 2026 against a full year target of 300 billion, and the historical record is 311 billion set in 2012. Clearing it is a lagging but clean confirmation that manufacturing and information technology locators are still choosing the country.
  • Board of Investments approvals hold above the one trillion peso target. The agency approved 900.06 billion pesos in the first nine months of 2026, up 53 percent, with 90 percent of that from domestic investors. Foreign approvals of 90.40 billion pesos are the number to watch for a data centre signal, because that is where a platform investor would appear.
  • Digital Realty or a peer hires for a Philippine market role. The hiring signal precedes the capital signal. A country manager, a development director or an acquisitions lead based in Manila is a stronger indicator than a conference panel, and it usually appears twelve to eighteen months before a first close.
A caution on the target

Moving from about 50 megawatts of AI ready capacity to 1.5 gigawatts in seven years is a thirtyfold increase. The country has 140 megawatts of total live capacity today, which means even the current fleet is small relative to the ambition. The target is achievable only if every announced project converts, and the base rate for announced data centre projects anywhere in the world is well below that.

10 · Questions

The Questions Buyers Actually Ask

10

Short answers, with the figures attached. Where the honest answer is no, the answer is no.

Does Digital Realty Trust have a data center in the Philippines?

No. As of November 2026 there is no Digital Realty facility, office or announced project in the Philippines. The company's nearest operating markets in the region are Singapore, Japan, Australia, Hong Kong, South Korea and India. The Philippine file is on the agenda, not in the portfolio.

What exactly is Digital Realty?

A United States real estate investment trust listed on the New York Stock Exchange since October 2004, headquartered in Austin, Texas. It owns, develops and operates data centers and sells colocation and interconnection services. At 30 September 2026 it operated 311 data centers with about 3.2 gigawatts of IT capacity and 9.8 gigawatts of buildable capacity.

Why does a Philippine apparel manufacturer publish a page about a data center REIT?

Because the investment case and the supply chain case are the same conversation. A campus that lands in Laguna or Clark buys site workwear, high visibility kit, visitor uniforms and commissioning apparel locally, and the buyers are the contractors and the owner team. The research desk publishes destination briefs for the sectors that buy what Philippine factories make.

Is the Philippines too expensive in power for data centers?

It is expensive, and pretending otherwise wastes a meeting. The Meralco industrial rate was 11.33 pesos per kilowatt hour in October 2026, roughly 0.20 US dollars. One megawatt at 90 percent load costs about 89.3 million pesos a year in energy. The competitive argument has to be connectivity, permits, talent and renewable procurement, not tariff.

Can a foreign company own a data center in the Philippines?

Yes. Data centre operation is not on the foreign investment negative list, so a foreign company can own 100 percent of the operating entity. Land is different. The Constitution keeps land ownership with Philippine nationals, so the site is held on a long term lease. Republic Act No. 12252 raised the maximum aggregate lease period for approved investments to 99 years.

What incentives apply to a Philippine data center project?

Under CREATE MORE and the 2026 Strategic Investment Priority Plan, a registered project can receive a four to seven year income tax holiday, then either a 5 percent special corporate income tax on gross income or enhanced deductions for up to 10 years. Qualifying projects also get duty and VAT relief, including a zero percent VAT rate on electricity, water and building leases directly attributable to the registered activity. Data centres sit in the Tier III frontier technology list.

How big is the Philippine data center market today?

BMI Research put it at 44 facilities and about 140 megawatts of live IT capacity in September 2026, with 43 megawatts under construction and 221 megawatts in the planned pipeline. The market was valued at about 633 million US dollars in 2024 and is forecast to reach about 1.97 billion by 2030, a compound annual growth rate near 21 percent. Cloud spending alone is forecast at 2.5 billion US dollars in 2026.

Which Philippine corridors matter for a campus?

Santa Rosa and Biñan in Laguna, Cainta in Rizal, Fairview in Quezon City, Cavite, and New Clark City in Capas, Tarlac. The first five are Greater Manila and CALABARZON sites with existing fibre and industrial estates. New Clark City is the greenfield option, with a 300 megawatt powered land project and a PEZA approved facilities package.

Could a Philippine supplier win work on a campus build?

Yes, in the layers around the imported core: cable trays and containment, sheet metal enclosures, panel assemblies, earthing, fire stopping, signage, commissioning consumables, temporary site protection and site apparel. The imported core, meaning chillers, generators, uninterruptible power supplies and the IT load, is not a realistic local pitch. A supplier that brings a test report and a paid first article offer gets a second meeting.

Is the national 1.5 gigawatt target realistic?

Not on the current conversion rate. The country has about 140 megawatts of live capacity and a target of 1.5 gigawatts by 2033, with roughly 221 megawatts in the planned pipeline. Hitting the target requires almost every announced project to reach energisation, plus new demand that has not yet been announced. The target is a policy instrument, not a forecast, and should be treated as one.

11 · Advisory desk

Site Visit, Supplier File or Commissioning Crew Kit

Tell us which one you are working on. We will map the corridor visit, list the documents each agency will ask for, and quote the apparel a commissioning team needs before the first rack lands.

Mankilam Main Office, Tagum City

Naungayan Building, Aala Road, Barangay Mankilam, Tagum City, Davao del Norte 8100, Philippines. Production coordination and freight handover for Mindanao shipments.

Mon to Sat, 8:30 AM to 5:00 PM (PHT)

Cagayan de Oro Office

Ficcoville, Iponan, Cagayan de Oro City, Misamis Oriental, Philippines. Account support for buyers consolidating through the Northern Mindanao corridor.

Mon to Sat, 8:30 AM to 5:00 PM (PHT)

Company sources. Digital Realty Trust third quarter 2026 results release and 2026 outlook table, 29 October 2026. Digital Realty Singapore investment release, 9 April 2026. Digital Realty investor relations company description and frequently asked questions. Public market data as of 6 November 2026.

Philippine sources. Philippines AI+ Infrastructure Masterplan 2033 as reported September 2026. 2026 Strategic Investment Priority Plan, Memorandum Order No. 47. Republic Act No. 12252. CREATE MORE Act. Board of Investments approvals for January to September 2026. PEZA approvals for January to October 2026. United States Department of State 2026 Investment Climate Statement for the Philippines. BMI Research data centre estimates, September 2026. Department of Energy capacity list, March 2026. Meralco October 2026 rate schedule. Data Center Dynamics investment forum programme, June 2026.

Method. Figures are reported as published and dated in the text. Grades in the destination scorecard are the editorial judgement of RB Advertising and are not a credit rating or an investment recommendation.