Digital Realty Trust and the Philippines: Data Centers, Capital and the Investment Case
Digital Realty is the largest listed, carrier neutral data center platform in the world, with 311 facilities and 3.2 gigawatts of IT capacity across 30 or more countries. It has no Philippine campus. This memo sets out how the company actually earns, what it has been buying in Asia Pacific, and the honest case for the Philippines as the next destination on a list like this one.
Independent research by RB Advertising. Digital Realty has not reviewed or endorsed this page. Every figure carries its source and its date, because this sector moves faster than any page can.
A Landlord Built for Data Gravity
Digital Realty Trust, Inc. was listed on the New York Stock Exchange in October 2004 and has spent two decades buying, building and operating the buildings that cloud and enterprise workloads sit in. It is a real estate investment trust, not a technology company, and that distinction explains almost everything about how it behaves as an investor.
The portfolio at 30 September 2026 was 311 data centers, including 88 held through unconsolidated investments, with roughly 3.2 gigawatts of IT capacity live and 9.8 gigawatts of buildable capacity either under development or held for future development. The footprint spans more than 55 metros in 30 or more countries on six continents. It is the closest thing the sector has to a utility with a global balance sheet.
What it sells is not floor space. It sells proximity: to clouds, to carriers, to internet exchanges, to other enterprises that a customer needs to reach inside a few milliseconds. The company calls the resulting problem data gravity, and its answer is a platform that lets a customer land once and then expand across metros without renegotiating the architecture.
The Philippine relevance is direct. A market that is trying to attract a platform of this kind is not competing on land price. It is competing on whether an anchor campus can be energised, permitted and connected on a schedule that a listed REIT can defend to its shareholders.
- Legal name
- Digital Realty Trust, Inc.
- Listing
- New York Stock Exchange, ticker DLR, S and P 500 component
- Structure
- Real estate investment trust, operating through Digital Realty Trust, L.P.
- Domicile
- Austin, Texas, United States
- Leadership
- Andy Power, President and Chief Executive Officer. Matt Mercier, Chief Financial Officer.
- Workforce
- Approximately 4,280 people
- Philippine campus
- None announced as of November 2026
There is no Digital Realty data center, office or announced project in the Philippines. The company is relevant to the country for two reasons: it is the benchmark against which a Philippine data centre investment case will be judged, and its Asia Pacific capital programme shows what a market has to assemble to win a cheque. This page is an investment destination brief, not a company announcement.
Two Engines, One Balance Sheet
Digital Realty runs two businesses that look similar from the outside and behave very differently underneath. One signs very large leases with hyperscale cloud customers and waits. The other signs small leases with enterprises, networks and service providers and monetises them through interconnection. The second engine is the one a Philippine market should study first.
The hyperscale engine
A single hyperscale lease can commit a whole building for a decade. It arrives with a long lead time, a demanding power specification and a customer that negotiates hard. In the third quarter of 2026 the weighted average lag between a new lease being signed and rent commencing was 17 months. That lag is the price of the business: capital goes out years before the first rent cheque arrives.
What makes the engine work is the backlog. Signed but not yet commenced leases reached $2.5 billion of annualised GAAP base rent at 100 percent share at the end of the quarter, and $1.8 billion at Digital Realty's share. That backlog is a visible queue of future revenue, and it is the number to watch when judging whether a market is delivering capacity on time.
The interconnection engine
The 0 to 1 megawatt plus interconnection category is where the margins and the stickiness live. In the third quarter it contributed $152 million of the $627 million booked at Digital Realty's share, a record for the category. These are the leases that put a customer's router next to a cloud on ramp, and once a customer has built that topology, moving is expensive.
This is the part of the model that fits the Philippines today. The country's demand base is enterprises, banks, outsourcers, government agencies and cloud providers serving a domestic market. That is a colocation and interconnection business long before it is a 100 megawatt hyperscale business, and the operator that wins the interconnection layer usually gets first refusal on the hyperscale lease that follows.
| Metric | 100 percent share | Digital Realty share | What it tells a market |
|---|---|---|---|
| Total bookings | $855M | $627M | Record demand, signed not yet billed |
| 0 to 1 MW plus interconnection | Not split | $152M | Record colocation and interconnection demand |
| Renewals signed | $261M | $261M | Existing customers staying and paying more |
| Renewal increase, cash basis | 11.8% | 11.8% | Pricing power in tight markets |
| Backlog, annualised | $2.5B | $1.8B | Revenue already contracted but not commenced |
| Signing to commencement lag | 17 months | 17 months | Why power and permits decide the winner |
Source: Digital Realty third quarter 2026 results, 29 October 2026.
The Numbers, as Filed
A REIT is judged on funds from operations rather than net income, because depreciation on a data centre is enormous and says little about cash. The table below keeps both, so the difference is visible. All figures are the company's own, for the quarter ended 30 September 2026, unless a date is given.
| Line item | Figure | Basis |
|---|---|---|
| Total revenue | $1.9B | Third quarter 2026, 21 percent above the prior year |
| Net income | $194M | Third quarter 2026 |
| Net income to common | $185M | $0.48 per share |
| Adjusted EBITDA | $978M | 13 percent above the prior year |
| Funds from operations | $742M | $1.97 per share |
| Core FFO, excluding net promote | $2.10 | Per share, third quarter 2026 |
| Core FFO, nine months | $6.27 | Per share, January to September 2026 |
| Revenue guidance | $7.05B to $7.13B | Full year 2026, excluding promote income |
| Adjusted EBITDA guidance | $3.80B to $3.85B | Full year 2026 |
| Core FFO guidance | $8.30 to $8.35 | Per share, full year 2026 |
| Same capital cash NOI growth | 5.25% to 5.75% | Full year 2026 guidance |
| Renewal spreads, cash | 10% to 12% | Full year 2026 guidance |
| Dispositions and contributions | $1.5B to $2.0B | Full year 2026 guidance |
| Annual dividend | $4.88 | Quarterly payments of $1.22 |
Source: Digital Realty third quarter 2026 results release and 2026 outlook table, 29 October 2026. Market capitalisation and enterprise value from public market data as of 6 November 2026.
The company is guiding to more than $7 billion of revenue and still selling assets. It recycles capital out of mature assets and into markets where demand is undersupplied. That is the behaviour a destination is competing with: not a company looking for cheap land, but a company looking for the highest risk adjusted return on the next dollar, measured against Singapore, Tokyo, Sydney, Mumbai and Jakarta.
The Asia Pacific Cheque, and What It Buys
In April 2026 Digital Realty put a number on Singapore: nearly S$7 billion of total investment, including more than S$4.3 billion of new data center development. The shape of that commitment is more instructive than the size, because it shows what a winning market actually assembles.
- Capital, not just a lease. More than S$4.3 billion of the package is new construction, layered on existing assets. A market wins when it can absorb a multi year build programme, not a single building.
- People, with a local ratio. The Singapore team has nearly doubled in three years to more than 300 employees and is expected to reach 400 by 2030. Around 90 percent are Singapore nationals. Workforce depth is part of the investment case, not a public relations footnote.
- Operations, physically located. The Global Command Center in Singapore runs round the clock monitoring and response. A regional operating hub creates a second, stickier layer of demand that a pure construction incentive cannot buy.
- Innovation infrastructure. A Digital Realty Innovation Lab is expected to open at the Loyang facility in the second half of 2026, giving customers a place to test AI and hybrid cloud designs before wider deployment. Early stage quantum data center work is attached to the same ecosystem.
- An Asia Pacific head office. The regional office moved and expanded to IOI Central Boulevard in July 2025, with further expansion expected in 2026. That is a decision about where senior people live, and it is harder to reverse than a lease.
Where the Philippines appears
On 10 June 2026 a Digital Realty senior director for acquisitions and investments, Woon Teng Koh, appeared on a Data Center Dynamics investment forum panel on tier two Asia Pacific markets covering Thailand, Indonesia, Vietnam and the Philippines. The session framing asked what investment is required for the Philippines to reach its 1.5 gigawatt potential.
That is engagement, not commitment. It should be read as evidence that the Philippine file is open on the desk, not that a cheque is written. A market that wants to convert a panel appearance into a site visit has to arrive with power, land tenure, a permit path and an anchor customer already assembled.
Singapore did not win S$7 billion because it was cheap. It won because a developer could promise a customer power, connectivity, permits and a trained operating team on a predictable schedule, and could hire the people to run it. The Philippines does not need to match Singapore on cost. It needs to match it on certainty, and certainty is a policy product.
The Philippines, Graded on Eight Tests
This is the centre of the memo. A data centre underwriter does not ask whether a country is promising. It asks eight specific questions, in roughly this order, and it walks away when two or three of them have no answer. The grades below are ours, based on published figures, and each one names the evidence behind it.
| Test | Evidence on file | Grade |
|---|---|---|
| Power quantity and date | 32,074 MW of installed generating capacity and 27,908 MW dependable across 323 plants in March 2026, against a projected national peak of 21,007 MW for the year. Headroom exists nationally. The constraint is a connection date in Laguna or Cavite, not a national number. | Conditional |
| Power price | The Meralco industrial rate was 11.33 pesos per kilowatt hour in October 2026, roughly 0.20 US dollars. One megawatt at 90 percent load costs about 89.3 million pesos a year in energy alone. This is not a low cost jurisdiction and should never be sold as one. | Gap |
| Land and tenure | Republic Act No. 12252 extended the maximum aggregate lease of private land for approved foreign investments to 99 years, up from 50 years renewable by 25. The Constitution still keeps land ownership with Philippine nationals. Long tenure is settled. Freehold is not available. | Ready |
| Permits and incentives | CREATE MORE, the 2026 Strategic Investment Priority Plan under Memorandum Order No. 47, and the PEZA ecozone regime together offer a four to seven year income tax holiday, a 5 percent special corporate income tax or enhanced deductions for up to 10 years, and duty and VAT relief on qualifying inputs. Data centres sit in the Tier III frontier technology list. | Ready |
| Fibre and interconnection | Multiple international subsea landings on Luzon, a domestic carrier market with several competing backbone operators, and a live internet exchange scene in Metro Manila. The gap is not international reach. It is the density of on ramps inside individual buildings. | Conditional |
| Customer depth | 44 facilities and about 140 MW of live capacity, 43 MW under construction and 221 MW planned, per BMI Research in September 2026. Cloud spending is forecast at 2.5 billion US dollars in 2026. Demand is real and small. It is a fraction of what a hyperscale anchor would need. | Conditional |
| Operating talent | A large information technology and business process management industry that already runs 24 hour operations, shift rosters and service level reporting, plus a deep electronics manufacturing base. Facility technicians and commissioning staff exist, though specialised high density cooling experience is thin. | Ready |
| Execution risk | BMI's project risk metric scores the Philippines 2.57 out of 10 against a global average just above 1.5, with grid constraints and permitting delays named as the drivers. The pipeline is announced faster than it is energised, which is the single largest risk to the national target. | Gap |
Sources: Department of Energy capacity list for March 2026, Meralco October 2026 rate schedule, Republic Act No. 12252, CREATE MORE, Memorandum Order No. 47, BMI Research September 2026, and PEZA and Board of Investments releases cited below.
The verdict, stated plainly
The Philippines passes four of the eight tests outright, is conditional on three, and fails on two, with power price counted among the failures. That is not a rejection. It is a description of a market that should be entered with an interconnection led product, a renewable power strategy and a patient capital structure, not with a speculative 100 megawatt campus.
The policy case is stronger than the physical case. The national plan has a number, a budget line and a delivery agency. The grid does not yet have the queue discipline to match it. An investor who underwrites the policy without the queue will be disappointed, and an investor who ignores the policy will miss the cheapest window the country has offered in a decade.
The numbers behind the national target
The Philippines AI+ Infrastructure Masterplan 2033 targets 1.5 gigawatts of AI ready data centre capacity by 2033, from roughly 50 megawatts today, with 400 megawatts as a first phase by 2030. The plan carries 34.4 billion US dollars of total investment, of which about 18.2 billion is already covered by existing public and private programmes, leaving roughly 21 billion to be mobilised from private capital.
It also targets about 152,000 GPUs, 500,000 AI related jobs and training for more than 1.3 million professionals. The Department of Information and Communications Technology has put the investment opportunity at around 30 billion US dollars. Those are ambition numbers. The scorecard above is the delivery test.
Where a Campus Actually Lands
The Philippine market is not national. It is a set of six corridors, each with a different power profile, landlord and customer base. A developer scouting the country is really choosing between these rows, and the choice is usually made by the substation rather than the brochure.
| Corridor | Anchor | Capacity | Status |
|---|---|---|---|
| Santa Rosa, Laguna | ePLDT VITRO | 50 MW | Live, AI ready, the largest single facility in the country |
| Biñan, Laguna | A-FLOW ML1, a FLOW and AyalaLand Logistics joint venture | 6 MW to 36 MW | First phase opened November 2025, Board of Investments registration approved 18 November 2025 |
| Cainta, Rizal | Digital Halo MNL1 | 6.5 MW to 70 MW | First building financed with 2.78 billion pesos from RCBC in January 2026, the first data centre project finance in the country |
| Fairview, Quezon City | ST Telemedia Global Data Centres | 124 MW | Four building campus planned, liquid cooling showroom, NVIDIA DGX ready certification |
| Cavite | ePLDT prospective campus | 100 MW or more | Announced, not yet energised |
| New Clark City, Capas, Tarlac | ENDEC Development and Narra Technology Park | 300 MW | PEZA approved 19 strategic facilities projects in August 2026, including a 32.544 billion peso first phase of powered land |
| Laguna | DAMAC Digital | Up to 250 MW | Announced after presidential talks in Abu Dhabi, January 2026, under study |
Sources: BMI Research September 2026, PEZA August 2026, Board of Investments December 2025, Digital Halo January 2026, and Presidential Communications Office statements January 2026.
New Clark City is the row to watch for a greenfield investor. It combines a 300 megawatt powered land project, a PEZA approved facilities package and a government that is actively assembling the site rather than waiting for a developer to assemble it. If the Philippines produces a hyperscale anchor in the next three years, the odds favour a corridor where the state has already done the land and power work.
What a Build Actually Buys in the Country
Most of a data centre budget leaves the country. Chillers, generators, uninterruptible power supplies, switchgear and the IT load itself are imported, and no amount of industrial policy changes that in the near term. The realistic Philippine opportunity is the fabricated, assembled and consumable layer around the imported core, where freight, lead time and site access favour a local supplier.
| Category | Who buys it | Local capability | The qualifying question |
|---|---|---|---|
| Cable trays, containment and supports | Electrical and mechanical contractors | Sheet metal fabricators in Metro Manila, Laguna and Cavite already serve electronics and semiconductor plants | Can you supply to a stamped drawing with a galvanising certificate and a two week call off? |
| Enclosures and panel assemblies | Systems integrators and electrical contractors | Established panel builders with test equipment and licensed electricians | Do you have a type test report, or only a catalogue? |
| Earthing and lightning protection | Electrical contractors | Local fabrication and installation crews, imported copper and components | Can you install to the earthing design and provide as built resistance readings? |
| Fire stopping and sealing | Mechanical and electrical trades | Certified applicators for imported systems, labour trained per project | Which system is specified, and are your applicators certified on that system? |
| Signage, labelling and wayfinding | Commissioning team and facilities | Signage and print shops with durable substrate experience | Will the labels survive a twenty year life in a hot aisle? |
| Commissioning consumables | Commissioning agents | Local distribution and same week delivery, which matters more than unit price | Can you hold stock within 48 hours of the site? |
| Site workwear and visitor kit | Construction manager, owner team, security | Philippine garment manufacturing with full sublimation, embroidery and low minimum runs | Can you dress a 400 person commissioning crew in matched, branded, high visibility kit inside one production cycle? |
| Temporary site protection | Main contractor | Local fabrication of barriers, covers and protection frames | Can you deliver to a phased site programme rather than a single drop? |
Category assessment by RB Advertising, based on published Philippine data centre project scopes and the country's electronics and garment manufacturing base.
The workwear row is the one this desk knows best. A data centre build has an unusual apparel profile: a small owner team that needs to look like the client, a large contractor population that needs high visibility and durability, security and visitor cohorts that turn over weekly, and a commissioning phase where a matched crew is part of how the site is judged. That is a low minimum, fast turnaround, full sublimation problem, which is exactly what Philippine garment manufacturing is good at. See manufacturing workwear in the Philippines for the production detail.
Four Ways In, and What Each One Costs
A platform like Digital Realty does not enter a market by renting an office and waiting. It picks one of four structures, and each one demands something different from the destination. The table is written from the investor's side of the desk.
| Route | What it looks like | Fastest realistic timeline | What the market must provide |
|---|---|---|---|
| Greenfield build | Buy or lease land, register with PEZA or the Board of Investments, build to the platform standard | Three to five years to first revenue | Powered land, a grid connection date, a permit path and a construction workforce |
| Joint venture | Partner with a Philippine developer or conglomerate that already holds land, power relationships and a licence | Two to three years | A credible local partner with a live pipeline, and a governance model both sides can live with |
| Acquire or lease operating capacity | Buy a facility or take a long lease from an operator, then upgrade it to platform standard | Six to twelve months | Assets for sale at a sensible price, and a seller who is not the only buyer in the room |
| Anchor tenant first | Sign a hyperscale or enterprise consortium before committing capital, then build to that contract | Two to four years | A customer with a Philippine requirement large enough to underwrite a building |
The route the Philippines is most likely to win
Joint venture, then acquisition. The country already has operating platforms with land, power relationships and construction experience, and it has a live pipeline of assets that will need a second balance sheet within five years. A greenfield hyperscale campus is the least likely first move, because the customer depth is not yet there to fill it.
The acquisition route has a local precedent. Equinix entered the Philippines in 2024 by acquiring three sites from Total Information Management rather than building. That is a template a large platform can copy quickly when the assets and the price align.
What the destination should do about it
Three things move the needle, and none of them is a brochure. Publish connection dates, not connection queues. Put a named officer on strategic projects with authority to clear a permit. Keep the incentive regime stable across administrations, because a 99 year lease is only as good as the policy that sits on top of it.
The country is already doing part of this. The Strategic Investment Priority Plan puts data centres in the frontier technology tier and the Board of Investments has a Green Lane process for strategic projects. The gap is execution capacity at the local government level, where the building permit actually lives.
Five Signals to Watch in 2027
A destination case should be falsifiable. These are the five events that would tell an investor the Philippine file is moving from policy to delivery, in the order they are likely to appear.
- A firm connection date for a new 100 megawatt class campus. Not a memorandum, not a feasibility study. A transmission connection agreement with a date and a capacity number, attached to a named project. Until that exists, the pipeline is a press release.
- New Clark City converts powered land into a signed anchor. The 300 megawatt ENDEC and Narra project is the clearest test of whether the state can assemble a site that a hyperscaler will take. A signed lease there would change the national conversation.
- A record PEZA year closes above 311 billion pesos. PEZA approvals reached 309.63 billion pesos by October 2026 against a full year target of 300 billion, and the historical record is 311 billion set in 2012. Clearing it is a lagging but clean confirmation that manufacturing and information technology locators are still choosing the country.
- Board of Investments approvals hold above the one trillion peso target. The agency approved 900.06 billion pesos in the first nine months of 2026, up 53 percent, with 90 percent of that from domestic investors. Foreign approvals of 90.40 billion pesos are the number to watch for a data centre signal, because that is where a platform investor would appear.
- Digital Realty or a peer hires for a Philippine market role. The hiring signal precedes the capital signal. A country manager, a development director or an acquisitions lead based in Manila is a stronger indicator than a conference panel, and it usually appears twelve to eighteen months before a first close.
Moving from about 50 megawatts of AI ready capacity to 1.5 gigawatts in seven years is a thirtyfold increase. The country has 140 megawatts of total live capacity today, which means even the current fleet is small relative to the ambition. The target is achievable only if every announced project converts, and the base rate for announced data centre projects anywhere in the world is well below that.
The Questions Buyers Actually Ask
Short answers, with the figures attached. Where the honest answer is no, the answer is no.
Does Digital Realty Trust have a data center in the Philippines?
No. As of November 2026 there is no Digital Realty facility, office or announced project in the Philippines. The company's nearest operating markets in the region are Singapore, Japan, Australia, Hong Kong, South Korea and India. The Philippine file is on the agenda, not in the portfolio.
What exactly is Digital Realty?
A United States real estate investment trust listed on the New York Stock Exchange since October 2004, headquartered in Austin, Texas. It owns, develops and operates data centers and sells colocation and interconnection services. At 30 September 2026 it operated 311 data centers with about 3.2 gigawatts of IT capacity and 9.8 gigawatts of buildable capacity.
Why does a Philippine apparel manufacturer publish a page about a data center REIT?
Because the investment case and the supply chain case are the same conversation. A campus that lands in Laguna or Clark buys site workwear, high visibility kit, visitor uniforms and commissioning apparel locally, and the buyers are the contractors and the owner team. The research desk publishes destination briefs for the sectors that buy what Philippine factories make.
Is the Philippines too expensive in power for data centers?
It is expensive, and pretending otherwise wastes a meeting. The Meralco industrial rate was 11.33 pesos per kilowatt hour in October 2026, roughly 0.20 US dollars. One megawatt at 90 percent load costs about 89.3 million pesos a year in energy. The competitive argument has to be connectivity, permits, talent and renewable procurement, not tariff.
Can a foreign company own a data center in the Philippines?
Yes. Data centre operation is not on the foreign investment negative list, so a foreign company can own 100 percent of the operating entity. Land is different. The Constitution keeps land ownership with Philippine nationals, so the site is held on a long term lease. Republic Act No. 12252 raised the maximum aggregate lease period for approved investments to 99 years.
What incentives apply to a Philippine data center project?
Under CREATE MORE and the 2026 Strategic Investment Priority Plan, a registered project can receive a four to seven year income tax holiday, then either a 5 percent special corporate income tax on gross income or enhanced deductions for up to 10 years. Qualifying projects also get duty and VAT relief, including a zero percent VAT rate on electricity, water and building leases directly attributable to the registered activity. Data centres sit in the Tier III frontier technology list.
How big is the Philippine data center market today?
BMI Research put it at 44 facilities and about 140 megawatts of live IT capacity in September 2026, with 43 megawatts under construction and 221 megawatts in the planned pipeline. The market was valued at about 633 million US dollars in 2024 and is forecast to reach about 1.97 billion by 2030, a compound annual growth rate near 21 percent. Cloud spending alone is forecast at 2.5 billion US dollars in 2026.
Which Philippine corridors matter for a campus?
Santa Rosa and Biñan in Laguna, Cainta in Rizal, Fairview in Quezon City, Cavite, and New Clark City in Capas, Tarlac. The first five are Greater Manila and CALABARZON sites with existing fibre and industrial estates. New Clark City is the greenfield option, with a 300 megawatt powered land project and a PEZA approved facilities package.
Could a Philippine supplier win work on a campus build?
Yes, in the layers around the imported core: cable trays and containment, sheet metal enclosures, panel assemblies, earthing, fire stopping, signage, commissioning consumables, temporary site protection and site apparel. The imported core, meaning chillers, generators, uninterruptible power supplies and the IT load, is not a realistic local pitch. A supplier that brings a test report and a paid first article offer gets a second meeting.
Is the national 1.5 gigawatt target realistic?
Not on the current conversion rate. The country has about 140 megawatts of live capacity and a target of 1.5 gigawatts by 2033, with roughly 221 megawatts in the planned pipeline. Hitting the target requires almost every announced project to reach energisation, plus new demand that has not yet been announced. The target is a policy instrument, not a forecast, and should be treated as one.
Site Visit, Supplier File or Commissioning Crew Kit
Tell us which one you are working on. We will map the corridor visit, list the documents each agency will ask for, and quote the apparel a commissioning team needs before the first rack lands.
Mankilam Main Office, Tagum City
Naungayan Building, Aala Road, Barangay Mankilam, Tagum City, Davao del Norte 8100, Philippines. Production coordination and freight handover for Mindanao shipments.
Mon to Sat, 8:30 AM to 5:00 PM (PHT)Cagayan de Oro Office
Ficcoville, Iponan, Cagayan de Oro City, Misamis Oriental, Philippines. Account support for buyers consolidating through the Northern Mindanao corridor.
Mon to Sat, 8:30 AM to 5:00 PM (PHT)Company sources. Digital Realty Trust third quarter 2026 results release and 2026 outlook table, 29 October 2026. Digital Realty Singapore investment release, 9 April 2026. Digital Realty investor relations company description and frequently asked questions. Public market data as of 6 November 2026.
Philippine sources. Philippines AI+ Infrastructure Masterplan 2033 as reported September 2026. 2026 Strategic Investment Priority Plan, Memorandum Order No. 47. Republic Act No. 12252. CREATE MORE Act. Board of Investments approvals for January to September 2026. PEZA approvals for January to October 2026. United States Department of State 2026 Investment Climate Statement for the Philippines. BMI Research data centre estimates, September 2026. Department of Energy capacity list, March 2026. Meralco October 2026 rate schedule. Data Center Dynamics investment forum programme, June 2026.
Method. Figures are reported as published and dated in the text. Grades in the destination scorecard are the editorial judgement of RB Advertising and are not a credit rating or an investment recommendation.