Company Record | Hyperscale Data Centers | Singapore

Princeton Digital Group: 1.8 GW Across Seven Markets, None in the Philippines

Princeton Digital Group builds and runs hyperscale data centers for cloud and artificial intelligence tenants across Asia, from a head office in Singapore and a portfolio above 1.8 GW. It operates in Singapore, Malaysia, Indonesia, Japan, India, China, and South Korea, and it holds no land, no hall, and no permit in the Philippines. This record sets out what the company is, where its campuses sit, and what a Philippine entry would take.

Headquarters Singapore
Founded 2018
Markets Seven
Portfolio More than 1.8 GW
Philippine sites Zero
National live capacity About 150 MW
1.8 GW Operating and developing portfolio
500 MW Powered land acquired in 2024
$5B Debt programme targeted for 2026
0 Philippine campuses, land banks, or filings
01 | Company record

Six Years from Zero to 1.8 GW

PDG was founded in 2018 with Warburg Pincus and grew by acquisition, carve out, and greenfield development rather than by a single build. The milestones below are the company's own, published on its corporate site.

01 The model

One operating platform, seven in country teams, and a single standard for design, procurement, and commissioning. PDG buys or leases powered land, builds to hyperscale specification, and contracts capacity to a small number of investment grade tenants rather than to a retail colocation market. That model needs land with firm power, not land with a promise of power.

02 The capital

Four institutional shareholders sit behind the platform: Warburg Pincus, Ontario Teachers Pension Plan, Mubadala, and Stonepeak, which invested 1.3 billion US dollars in August 2025. In March 2026 the company converted a 750 million US dollar holding company facility into a sustainability linked loan with seven banks, and said it would raise up to 5 billion US dollars of debt across the year.

03 The shift

In October 2026 PDG agreed to sell its Indonesian enterprise data center business to SM+ and kept a 400 MW hyperscale portfolio in Greater Jakarta. The direction is consistent across markets: exit small enterprise colocation, concentrate capital in large AI ready campuses, and enter new countries with a single anchor site before scaling. South Korea was entered in November 2025 with a 48 MW campus and a plan for up to 500 MW.

Capital and capacity ledger
DateEventSize
19 September 2024Powered land acquired in Mumbai, Chennai, Johor, and Jakarta, over 88 acres500 MW, $5B programme
August 2025Stonepeak equity investment$1.3B
17 November 2025Entry into South Korea with a Greater Seoul campus$700M, 48 MW
11 March 2026Holding company facility converted to a sustainability linked loan$750M, $5B target
4 November 2026Green financing for the JH1 campus in JohorAbout $1.3B
Warburg PincusFounding investor
Ontario TeachersPension Plan
MubadalaSovereign investor
StonepeakInfrastructure
02 | Market grid

Seven Markets, One Empty Cell

Each cell names the route PDG took into the market and the capacity it now claims there. The eighth cell is the Philippines, drawn as it is: no campus, no land bank, no announced entry.

Home market

Singapore

SG1 and SG2 in an enterprise campus near Tai Seng, with SG3 in the western cluster by Jurong and Tuas. Two substations and two points of entry.

More than 20 MW
Greenfield

Malaysia

Johor, the land bridge beside Singapore. The JH1 campus is the anchor, and the company has said the region will reach 370 MW.

370 MW region
Acquisition

Indonesia

Greater Jakarta, built from the carve out of a mobile operator portfolio. JC3 is 120 MW and JC4 adds 240 MW of powered land.

400 MW market
Greenfield

India

Mumbai, Chennai, and Hyderabad. MU1 in Navi Mumbai becomes a 150 MW campus, and the country portfolio is now about 1 GW.

About 1 GW
Greenfield

Japan

TY1 in the Saitama corridor north of Tokyo, one of the first three PDG campuses certified OCP Ready for hyperscale.

TY1 campus
Acquisition

China

The 2019 entry market, built from acquired assets and a campus in the Shanghai region, sized for domestic cloud tenants.

Shanghai region
New entry

South Korea

Greater Seoul, entered November 2025 with a 48 MW first campus and a stated path to 500 MW in the country.

48 MW, up to 500 MW
Not present

Philippines

No campus, no land bank, no announcement, and no registration. The second most populous country in ASEAN is the one ASEAN market the platform has not entered.

Zero

The 2024 land programme is the clearest statement of method: 500 MW of powered land across four existing markets, over 88 acres, tied to a 5 billion US dollar investment programme. PDG expands where it has already proved delivery, and it chooses markets where a single anchor campus can serve several countries.

03 | The gap

Three ASEAN Markets. The Fourth Is Missing.

PDG runs campuses in Singapore, Malaysia, and Indonesia. The Philippines is the fourth large digital economy in the same bloc, and it is absent from the map. That absence is the commercial opening this page documents, and it is also the risk that has to be priced.

1.8 GW Portfolio across seven markets
3 ASEAN markets in operation
0 Philippine campuses
150 MW National live IT capacity, industry estimate

The Philippine market is small by the standards PDG now builds to, and that is exactly the point. About 150 MW is live nationwide against 473 MW committed within two years by the operators already here. The gap between those two numbers is the build programme, and a single 100 MW campus would be a material share of it. The country also brings something Johor and Jakarta do not: a domestic outsourcing industry of 1.9 million full time employees, a government data residency order that took effect in July 2026, and two new cable landings on the Pacific side.

None of that makes the Philippines an easy market. The honest counterweight belongs on the same page as the case, not in a footnote.

What a serious entry has to answer. Power is the first constraint: the Meralco residential rate reached 15.0615 pesos per kWh in October 2026, and the Department of Energy described Philippine rates as the highest in Southeast Asia in July 2026. The second is physical: about 20 tropical cyclones cross the country each year, so a campus carries wind, flood, and seismic design premiums that Johor does not. The third is human: the outsourcing industry is deep, but data center commissioning engineers and critical facility technicians are thin, and a 100 MW campus needs a trained shift roster from day one.
04 | Investment case

Six Instruments a Data Center Can Use

The fiscal and ownership framework is not theoretical. Each instrument below is a statute or a regulator decision in force in 2026, and each changes the arithmetic of a Philippine campus.

01 | Republic Act 12066

CREATE MORE

A registered enterprise pays 20 percent corporate income tax instead of 25 percent. It can take an income tax holiday of four years, extended to five, six, or seven years where the project sits in a higher tier of the Strategic Investment Priority Plan, then move to the 5 percent special corporate income tax on gross income earned or to the enhanced deductions regime.

20% CIT
02 | Enhanced deductions

Power expense

Under the enhanced deductions regime a registered project may deduct 200 percent of its power expense. For a campus where electricity is the largest operating cost after people, that single line does more work than most headline incentives.

200% of power
03 | Republic Act 11647

Foreign equity

Data center and digital infrastructure activity is open to full foreign ownership. A Singapore or United States parent can hold 100 percent of the Philippine operating company without a local partner, a nominee, or a cap table workaround.

100% foreign
04 | Republic Act 7652

Land tenure

Foreign investors cannot own private land, but they can lease it for 75 years: 50 years with a single 25 year renewal. For a campus with a 20 to 30 year asset life, that is long enough to underwrite the build.

75 years
05 | PEZA

Ecozone route

A campus inside an accredited ICT park or IT building can access the income tax holiday and the 5 percent gross income tax, duty free import of capital equipment, and zero rated VAT on local purchases. Sta. Rosa, Clark, and Cebu are the established corridors.

5% GIT
06 | RA 12234 and ERC

Open access and power choice

The Konektadong Pinoy Act removed the legislative franchise requirement for data transmission and lapsed into law in August 2025. On the power side, the retail choice threshold fell from 500 kW to 100 kW on 26 June 2026, which puts a data center in the contestable market from its first phase.

100 kW
05 | Site readiness

Six Tests Before a Megawatt Is Committed

A hyperscale tenant does not buy a building. It buys firm capacity, route diversity, and a permit that will not be withdrawn. The matrix scores the country against those tests, and it does not pretend every line is green.

Land

Freehold is closed to foreign buyers, so the route is a lease of up to 75 years or a building inside a PEZA zone. Industrial land in Clark, Laguna, Cavite, and Batangas is available at scale, and the Narra Technology Park in New Clark City has been planned at 300 MW.

Conditional

Power

Firm capacity depends on the corridor, not on the country. A campus needs a dedicated substation, a switching scheme, and a fuel plan. Retail choice at 100 kW helps on price, but it does not create a megawatt that the grid does not have.

Conditional

Fibre

Eleven international submarine systems are in service and six more are under construction. The Apricot cable alone carries a design capacity of 190 Tbps and lands at Baler and Digos, giving the country Pacific facing routes as well as the South China Sea routes.

Strong

Water and cooling

Tropical wet bulb temperatures and water stress in parts of Luzon push design toward closed loop cooling, reclaimed water, and high density liquid cooling. That raises capital cost and lowers water risk at the same time.

Conditional

People

The outsourcing industry employs 1.9 million full time staff and holds 17 percent of global IT-BPM headcount. Call centre and back office depth is not the same as critical facility depth, so a first campus will import commissioning leads and train locally.

Conditional

Permits

PEZA or Board of Investments registration, local government permits, and an environmental compliance certificate are the standard sequence. Strategic projects can be endorsed to the Green Lane under Executive Order 18, which compresses coordination but not the technical review.

Workable
06 | Corridors

Five Places a Campus Could Actually Sit

Each corridor is judged on the same four lines: power, fibre, land, and the risk that does not appear in a brochure. Travel times are road estimates outside peak traffic.

New Clark City, Tarlac

Power
A dedicated 230 kV substation serves the Clark corridor.
Fibre
Landing routes to Baler and the northern Luzon backbone.
Land
Planned 300 MW Narra Technology Park, three phases of 100 MW.
Risk
Two hours from the Metro Manila engineering labour pool.

Sta. Rosa to Calamba, Laguna

Power
Mature industrial load and existing transmission.
Fibre
Metro south rings and the Batangas landing corridor.
Land
PEZA parks with industrial land already titled.
Risk
Land cost and grid congestion at peak.

Cavite to Batangas

Power
Generation nearby and industrial feeders.
Fibre
Batangas cable landing station and southern rings.
Land
ePLDT VITRO Cavite is planned at 100 MW on this belt.
Risk
Seismic design and competing industrial demand.

Metro Manila edge

Power
Dense, expensive, and closest to the latency core.
Fibre
The deepest metro mesh in the country.
Land
STT Fairview scales to 124 MW and Converge is building 49 MW in Paranaque.
Risk
Flood exposure, land assembly, and neighbour consent.

Davao, Mindanao

Power
A separate grid with surplus generation and lower tariffs.
Fibre
SEA-US and Apricot landings, plus domestic backhaul north.
Land
Industrial estates with room for a campus and buffer.
Risk
Thinner engineering bench and a smaller local tenant base.

What is missing

Power
No published firm capacity offer for a 100 MW single campus.
Fibre
No carrier neutral meet me room at hyperscale standard outside Manila.
Land
No assembled site with a substation and a 75 year lease ready to sign.
Risk
First mover pays for the site work that later entrants inherit.
07 | Entry route

Three Rungs, Not One Leap

PDG has entered every market the same way: a first commitment that is small enough to stop, followed by land, followed by a campus. The Philippine sequence would follow the same shape.

01
Month 0 to 12 | Anchor tenancy

Lease the first block

Take 2 to 10 MW from an existing operator in Manila or Cavite, put a hyperscale tenant into it, and learn the power, permitting, and fibre reality from inside the market. Capital is fit out and power, not land.

Constraint

Large contiguous blocks above 10 MW are scarce, and the best halls are already committed.

02
Month 12 to 36 | Land and power

Secure the site

Buy or lease 50 to 100 MW of powered land in Clark, Laguna, Cavite, or Batangas, with a 75 year lease, a substation agreement, and a route to the grid. This is the step where the 2024 land programme in Johor and Jakarta repeats.

Constraint

The lease is signable, the power allocation is the negotiation, and it is decided corridor by corridor.

03
Month 36 to 60 | Own campus

Build to standard

Greenfield 100 MW and above, designed for liquid cooling, certified to Uptime Tier III and OCP Ready, and operated by a local team under the group platform. Capital is 1 billion US dollars class for the first phase alone.

Constraint

Typhoon and seismic design add cost, and the commissioning team has to be imported and then replaced by trained local staff.

08 | Power and fibre

Two Tracks Run in Parallel

A data center is a power project with a fibre attachment. Both tracks have to close before a tenant signs, and in the Philippines they close in different places: power in the corridor, fibre at the landing station.

Power track

Generation Grid and green auction
Transmission National grid
Distribution Meralco or cooperative
Retail choice 100 kW threshold
Campus Substation and fuel

Fibre track

Cable landing Baler, Digos, Batangas
Backbone Domestic long haul
Metro ring Route diversity
Meet me room Carrier neutral
Halls Cross connect

01 Price

The Philippines has the most expensive power in Southeast Asia after Singapore, and unlike Singapore it does not import its way out of the problem with a single buyer. The Meralco rate for a household reached 15.0615 pesos per kWh in October 2026. A campus negotiates a different number, but the direction of the fuel market is the same.

02 Choice

Retail Competition and Open Access lets a contestable customer buy from a retail electricity supplier instead of the local utility. The threshold fell to 100 kW on 26 June 2026, and Mindanao joined the retail market in 2024. For a campus this means a power purchase agreement, not a monthly bill.

03 Resilience

Two new Pacific facing landings at Baler and Digos shorten the route to the United States and reduce dependence on the South China Sea paths. Eleven systems in service and six under construction make the country one of the more cable dense markets in the region, which is the strongest line on the readiness matrix.

09 | Manufacturing and people

What the Country Can Build Beside the Campus

A data center imports most of its equipment. The Philippine opportunity is not the server. It is the fit out, the cable assemblies, the enclosures, and the clothing worn by the people who build and run the halls.

Equipment and fit out

  • Cable assemblies, harnesses, and busway sections
  • Precision sheet metal, racks, and enclosures
  • Cooling distribution units and air handling
  • Switchgear and power distribution assembly
  • Packaging, crating, and site logistics

The electronics and semiconductor base already supplies global equipment makers. The ASEAN semiconductor framework and the biotechnology build out use the same industrial estates and the same technical workforce.

Workwear for the build and the shift

  • ESD anti static shirts and smocks
  • Cleanroom compatible outerwear
  • Technician polos and site uniforms
  • Corporate and visitor apparel
  • Embroidered identification and rank trim

RB Advertising cuts and prints these in Tagum City and Cagayan de Oro. Programmes start at twelve pieces per design. See ESD and cleanroom garments, anti static t shirts, and EU GMP Annex 1 cleanroom clothing.

People and skills

  • 1.9 million IT-BPM full time employees
  • 40.3 billion US dollars of export revenue in 2025
  • 17 percent of global IT-BPM headcount
  • Engineering graduates from Laguna, Cavite, and Cebu
  • English as the working language of the sector

The gap is not headcount, it is certification. Critical facility technicians, high voltage switching staff, and commissioning engineers are the scarce roles, and a serious entrant budgets for a training pipeline in the first two years.

10 | Site visit

One Trip, Four Corridors, One Flight South

A site visit that covers Clark, Laguna, Cavite, and Batangas fits in three working days from Manila. Adding Davao adds one domestic flight and a different grid, a different labour market, and a different set of landings.

30 days Visa free entry on a United States or European Union passport
72 hours eTravel registration window before arrival
2 hours Manila to Clark by road outside peak traffic
1h 50m Manila to Davao by air

The Luzon leg

  1. Day one: Manila arrivals, a meeting with PEZA or the Board of Investments, and a metro site.
  2. Day two: Sta. Rosa and Calamba in the morning, Cavite and Batangas in the afternoon.
  3. Day three: Clark and New Clark City, with the substation and the Narra site, then back to Manila.

Carry a passport valid for six months beyond the stay, a return ticket, and a printed address for the first hotel. Immigration asks for the last two more often than the first.

The Mindanao leg

  1. Day four: fly Manila to Davao, inspect industrial estates and the cable landing route.
  2. Day five: meet the local grid operator and the economic zone authority, then return or extend.

Mindanao is a separate grid with lower tariffs and its own surplus, which makes it the cheapest power in the country and the thinnest engineering bench. A visit is the only way to see the trade.

11 | Questions

Eight Questions Buyers Ask First

Each answer carries the headline figure beside it, so the page can be read in a meeting without scrolling for the number.

Does PDG operate a data center in the Philippines?

No

No. PDG operates in Singapore, Malaysia, Indonesia, Japan, India, China, and South Korea. It has no Philippine campus, no announced land acquisition, and no registration with PEZA or the Board of Investments as of November 2026.

Can a foreign company own 100 percent of a Philippine data center?

Yes

Yes. Republic Act 11647 opened the activity to full foreign equity. The land under the campus is leased for up to 75 years under Republic Act 7652, or the campus sits in a PEZA zone and leases the building.

What tax rate applies to a registered data center?

20 percent

Twenty percent corporate income tax under CREATE MORE, with an income tax holiday of four to seven years, then the 5 percent special corporate income tax on gross income earned or the enhanced deductions regime, which allows 200 percent deduction of power expense.

How long can a foreign investor lease the site?

75 years

Seventy five years: an initial 50 year term with one 25 year renewal under the Investors Lease Act. That covers a campus asset life, but the lease has to be registered and the land title has to be clean before the first pile is driven.

Can a campus choose its electricity supplier?

100 kW

Yes, above the contestable threshold. The Energy Regulatory Commission cut the Retail Competition and Open Access threshold from 500 kW to 100 kW on 26 June 2026, and Mindanao joined the retail market in 2024, so a campus can contract with a retail electricity supplier rather than accept the default utility rate.

Do United States passport holders need a visa for a site visit?

30 days

No. Entry is visa free for 30 days and extendable at the Bureau of Immigration. Register on eTravel within 72 hours before arrival, hold a return or onward ticket, and carry a passport valid for at least six months beyond the stay.

Can RB Advertising supply the workwear for a Philippine operation?

12 pieces

Yes. RB Advertising produces ESD anti static shirts, cleanroom compatible outerwear, technician polos, and corporate uniforms from Tagum City and Cagayan de Oro. Programmes start at twelve pieces per design, which suits a pilot team before a shift wide rollout.

Is this page affiliated with Princeton Digital Group?

No

No. This is independent research published by RB Advertising. PDG has not commissioned it, reviewed it, or endorsed it, and nothing here is investment, legal, tax, or regulatory advice.

Philippine Advisory Desk

Site Visit, Permit Question, or Workwear Programme

Tell us which rung of the ladder you are on. We will map the visit, list the documents each agency will ask for, and quote the apparel a team needs when the site opens. The desk answers as an independent research desk, not as an agent for PDG.

Mankilam Main Office, Tagum City

Naungayan Building, Aala Road, Barangay Mankilam, Tagum City, Davao del Norte 8100, Philippines. Production coordination and freight handover for Mindanao shipments.

Mon to Sat, 8:30 AM to 5:00 PM (PHT)

Cagayan de Oro Office

Ficcoville, Iponan, Cagayan de Oro City, Misamis Oriental, Philippines. Account support for buyers consolidating through the Northern Mindanao corridor.

Mon to Sat, 8:30 AM to 5:00 PM (PHT)

Sources

  1. Princeton Digital Group, Who we are, and Our Portfolio, princetondg.com, retrieved 6 November 2026.
  2. PDG press releases: 19 September 2024 on the 500 MW powered land programme, 17 November 2025 on South Korea, 19 November 2025 on the JC3 campus, 11 March 2026 on the debt programme, 24 March 2026 on the India acquisition, 30 April 2026 on JC4, 7 May 2026 on the JC3 financing, 12 October 2026 on the Indonesia enterprise disposal, and 4 November 2026 on the JH1 green financing.
  3. Data Center Dynamics, reporting the Stonepeak investment of August 2025.
  4. Republic Act 12066, the Corporate Recovery and Tax Incentives for Enterprises to Maximize Opportunities for Reinvigorating the Economy Act, with its implementing rules and the Strategic Investment Priority Plan.
  5. Republic Act 11647, amending the Foreign Investments Act, and Republic Act 7652, the Investors Lease Act.
  6. Republic Act 12234, the Konektadong Pinoy Act, which lapsed into law on 24 August 2025, and its implementing rules of December 2025.
  7. Executive Order 119 on government data residency, signed 13 July 2026, and Executive Order 18 on the Green Lane.
  8. Energy Regulatory Commission decisions on Retail Competition and Open Access, including the 100 kW threshold effective 26 June 2026, and Department of Energy statements on national power rates.
  9. Meralco rate advisories for October 2026, and Submarine Networks country data for the Philippines, including the Apricot system.
  10. Philippine Economic Zone Authority zone directory, Data Center Association of the Philippines capacity figures, IBPAP industry data for 2025 and 2026, and Department of Tourism arrivals for 2025.
  11. Trade reporting on the Philippine data center pipeline, including STT Fairview, ePLDT VITRO Cavite, Converge Paranaque, and the Narra Technology Park in New Clark City.

This is an independent research page published by RB Advertising of Tagum City and Cagayan de Oro. Princeton Digital Group, PDG, and the names of its campuses and investors are the property of their respective owners. RB Advertising is not affiliated with Princeton Digital Group, has received no payment from it, and makes no representation about its plans in the Philippines. Capacity figures for the Philippine market are industry estimates and will move as projects reach financial close. Nothing here is investment, legal, tax, or regulatory advice.