Turnkey Industrial Mobilization · Project Logistics

Project Logistics and Heavy Lift Cargo Services in the Philippines

Execute complex engineering cargo movements with turnkey project logistics services. We coordinate factory-to-foundation transport for energy substations, wind turbine generators, oil refinery pressure vessels, mining machinery, and industrial manufacturing plants. Our operations integrate marine heavy chartering, hydraulic multi-axle modular transport, civil route bypass engineering, and customs project cargo clearances for EPC contractors and international project importers and exporters.

Turnkey Project Cargo Milestones EPC Execution
Route Reconnaissance & Swept-Path 3D CAD clearance modeling, bridge load rating, utility wire surveys
Stage 1
Heavy Lift Ocean Charter & LCT Barging Dedicated roll-on roll-off landing craft tank marine chartering
Stage 2
Hydraulic Modular SPMT Linehauls Multi-axle synchronized steering with DPWH highway clearances
Stage 3
On-Site Tandem Rigging to Foundation Jack-and-pack skidding and precision anchor bolt placement
Stage 4

Specialized Industrial Sectors in Project Logistics

Engineered cargo solutions tailored to sector-specific safety standards, lifting constraints, and installation timelines.

Renewable Energy

Wind Farm & Solar Infrastructure Logistics

Under our project logistics services, specialized extendable blade trailers haul wind turbine blades up to 75 meters long, tower sections, and heavy nacelles through mountainous terrain to wind farm installation sites across Luzon and the Visayas.

  • Extendable hydraulic steering blade carriers
  • Substation step-up transformer delivery
  • Integrated with heavy lowbed haulage
  • Port storage marshalling yards for solar arrays
Book Wind Logistics
Oil & Petrochemical

Refinery Vessel & Modular Skid Transport

Mobilizing oversized refining components demands engineered project logistics operations. We transport distillation columns, industrial autoclave pressure vessels, heat exchangers, and prefabricated pre-commissioned modular processing skids.

  • Multi-axle hydraulic Goldhofer modular transporters
  • Roll-on roll-off marine transport on barges
  • Direct seaport handling at Batangas and Subic Bay
  • Coordinated with heavy rigging teams
Book Refinery Haul
Power Generation

Turbine Generator & Substation Logistics

Delivering critical utility infrastructure requires precision project logistics coordination. We mobilize heavy gas turbine generators, steam turbines, condensers, and high-voltage power transformers from international ocean vessels to concrete plinths.

  • Hydraulic jack-and-slide skidding systems
  • Synchronized tandem picks with cranes
  • Single-contract MTO coverage under multimodal
  • Full civil bridge reinforcement and temporary bypasses
Book Power Transport
Mining & Heavy Industry

Turnkey Factory & Mining Plant Relocation

When industrial facilities expand or relocate, our project logistics services provide complete turnkey engineering: dismantling heavy ball mills, rotary kilns, crushers, and stamping presses, managing convoy linehauls, and re-erecting on new foundations.

  • Heavy industrial mechanical match-marking & packing
  • Bonded factory moves coordinated with customs
  • Integrated with nationwide road linehauls
  • Comprehensive on-site project management team
Book Factory Relocation
Civil Infrastructure Engineering

Route Feasibility, Bridge Bypasses & Beach Landing Ramps

Under our project logistics standards, moving super-heavy or extra-long cargo requires civil engineering interventions to ensure structural safety and avoid highway bottlenecks.

Our in-house civil engineers design temporary steel bridge bypasses, construct compacted aggregate beach landing ramps for roll-on roll-off landing craft tanks (LCT), coordinate high-voltage power line lifts with electrical utilities, and secure DPWH Special Permits.

3D Swept-Path Analysis CAD simulation of trailer turning envelopes at roundabouts and intersections
Temporary Steel Bypasses Bridge propping and portable Bailey bridge crossings for over-limit loads
LCT Beach Ramps Turnkey shoreline ramp construction for direct beach roll-off in remote islands
Utility Wire Elevation Coordinated bucket trucks lifting telecommunications and power lines

Project Logistics Equipment & Heavy Lift Engineering Matrix

Engineered transport configurations, civil constraints, and offloading methods for critical industrial cargo.

Project Cargo ClassTypical Dimensions / WeightSpecialized Transport ModeRoute Engineering RequirementFoundation Setting Method
Wind Turbine BladesUp to 75 Meters / 22 TonsTriple-Extendable Blade CarrierSwept-path widening at hairpinsSingle crane pick with tailing crane
Substation Transformers120 Tons to 250 TonsHydraulic Modular SPMT TransporterBridge axle load limit calculationsHydraulic jack-and-slide skidding
Refinery Pressure Columns45 Meters Length / 180 TonsMulti-Axle Bolster TurntablesOverhead high-voltage wire liftingTandem mobile crane upending
Industrial Gas Turbines280 Tons Unit WeightSPMT with Heavy LCT Marine BargeShoreline beach ramp engineeringDirect drive-on foundation positioning
Mining Rotary Ball Mills6.5 Meters Diameter / 95 TonsLow-Profile Vessel Bed LowbedToll booth barrier bypass routesGantry crane track installation

Marine Warranty & Project Logistics FAQs

Risk engineering protocols safeguarding billion-peso industrial assets throughout transit.

Marine Warranty Surveyor (MWS) & Rigging Standards

Rigging Method Statements & 3D Lift Plans Before any heavy cargo is lifted, our project logistics engineers draft comprehensive Method Statements with 3D CAD rigging drawings detailing crane outrigger loads and ground bearing pressure.
Independent Marine Warranty Surveyor (MWS) Approvals All ocean barge loadouts, seafastening calculations, roll-on roll-off ballasting plans, and towage arrangements are formally reviewed and stamped by certified Marine Warranty Surveyors.
Transit Insurance & Comprehensive Cargo Liability We coordinate project cargo insurance policies including Delay in Start-Up (DSU) coverage, marine transit policies, and contractor all-risks (CAR) liability for EPC joint ventures.

Frequently Asked Questions About Project Logistics Services

How early should we engage a project logistics team before project kickoff? For major EPC projects, engaging 3 to 6 months prior to equipment arrival is recommended to allow route reconnaissance, permit applications, bridge assessments, and barge chartering.
Can you handle customs clearance for duty-exempt BOI / PEZA project cargo? Yes. Our in-house customs brokerage team handles Board of Investments (BOI) duty-free import tax exemptions and PEZA green-lane customs clearances.
Do you manage beach landings where commercial port cranes do not exist? Yes. We construct engineered temporary gravel and steel plate landing ramps for specialized Landing Craft Tank (LCT) barges, rolling heavy modular trailers directly onto the shore.
Project Logistics Engineering Desk

Request a Project Logistics Feasibility Assessment

Submit your equipment dimensions, gross weights, destination job site, port of origin, and mobilization timeline. Our project cargo engineers will conduct route feasibility reviews and issue equipment recommendations.

Project SLA: Initial engineering feasibility review and equipment allocation response within 2 hours.