Project Logistics and Heavy Lift Cargo Services in the Philippines
Execute complex engineering cargo movements with turnkey project logistics services. We coordinate factory-to-foundation transport for energy substations, wind turbine generators, oil refinery pressure vessels, mining machinery, and industrial manufacturing plants. Our operations integrate marine heavy chartering, hydraulic multi-axle modular transport, civil route bypass engineering, and customs project cargo clearances for EPC contractors and international project importers and exporters.
Specialized Industrial Sectors in Project Logistics
Engineered cargo solutions tailored to sector-specific safety standards, lifting constraints, and installation timelines.
Wind Farm & Solar Infrastructure Logistics
Under our project logistics services, specialized extendable blade trailers haul wind turbine blades up to 75 meters long, tower sections, and heavy nacelles through mountainous terrain to wind farm installation sites across Luzon and the Visayas.
- Extendable hydraulic steering blade carriers
- Substation step-up transformer delivery
- Integrated with heavy lowbed haulage
- Port storage marshalling yards for solar arrays
Refinery Vessel & Modular Skid Transport
Mobilizing oversized refining components demands engineered project logistics operations. We transport distillation columns, industrial autoclave pressure vessels, heat exchangers, and prefabricated pre-commissioned modular processing skids.
- Multi-axle hydraulic Goldhofer modular transporters
- Roll-on roll-off marine transport on barges
- Direct seaport handling at Batangas and Subic Bay
- Coordinated with heavy rigging teams
Turbine Generator & Substation Logistics
Delivering critical utility infrastructure requires precision project logistics coordination. We mobilize heavy gas turbine generators, steam turbines, condensers, and high-voltage power transformers from international ocean vessels to concrete plinths.
- Hydraulic jack-and-slide skidding systems
- Synchronized tandem picks with cranes
- Single-contract MTO coverage under multimodal
- Full civil bridge reinforcement and temporary bypasses
Turnkey Factory & Mining Plant Relocation
When industrial facilities expand or relocate, our project logistics services provide complete turnkey engineering: dismantling heavy ball mills, rotary kilns, crushers, and stamping presses, managing convoy linehauls, and re-erecting on new foundations.
- Heavy industrial mechanical match-marking & packing
- Bonded factory moves coordinated with customs
- Integrated with nationwide road linehauls
- Comprehensive on-site project management team
Route Feasibility, Bridge Bypasses & Beach Landing Ramps
Under our project logistics standards, moving super-heavy or extra-long cargo requires civil engineering interventions to ensure structural safety and avoid highway bottlenecks.
Our in-house civil engineers design temporary steel bridge bypasses, construct compacted aggregate beach landing ramps for roll-on roll-off landing craft tanks (LCT), coordinate high-voltage power line lifts with electrical utilities, and secure DPWH Special Permits.
Project Logistics Equipment & Heavy Lift Engineering Matrix
Engineered transport configurations, civil constraints, and offloading methods for critical industrial cargo.
| Project Cargo Class | Typical Dimensions / Weight | Specialized Transport Mode | Route Engineering Requirement | Foundation Setting Method |
|---|---|---|---|---|
| Wind Turbine Blades | Up to 75 Meters / 22 Tons | Triple-Extendable Blade Carrier | Swept-path widening at hairpins | Single crane pick with tailing crane |
| Substation Transformers | 120 Tons to 250 Tons | Hydraulic Modular SPMT Transporter | Bridge axle load limit calculations | Hydraulic jack-and-slide skidding |
| Refinery Pressure Columns | 45 Meters Length / 180 Tons | Multi-Axle Bolster Turntables | Overhead high-voltage wire lifting | Tandem mobile crane upending |
| Industrial Gas Turbines | 280 Tons Unit Weight | SPMT with Heavy LCT Marine Barge | Shoreline beach ramp engineering | Direct drive-on foundation positioning |
| Mining Rotary Ball Mills | 6.5 Meters Diameter / 95 Tons | Low-Profile Vessel Bed Lowbed | Toll booth barrier bypass routes | Gantry crane track installation |
Marine Warranty & Project Logistics FAQs
Risk engineering protocols safeguarding billion-peso industrial assets throughout transit.
Marine Warranty Surveyor (MWS) & Rigging Standards
Frequently Asked Questions About Project Logistics Services
Request a Project Logistics Feasibility Assessment
Submit your equipment dimensions, gross weights, destination job site, port of origin, and mobilization timeline. Our project cargo engineers will conduct route feasibility reviews and issue equipment recommendations.
Project SLA: Initial engineering feasibility review and equipment allocation response within 2 hours.
