United Kingdom headquarters · Founded from Econet · Fibre, data centres and AI capacity

Cassava Technologies and the Philippines: Digital Infrastructure, Hardware Manufacturing and Investment Hub

Cassava Technologies is the UK headquartered infrastructure group built out of Econet, chaired by Strive Masiyiwa, and now running about 100,000 kilometres of fibre, carrier neutral data centres, cloud services and an NVIDIA powered AI factory programme across five countries. It publishes no Philippine operation. This dossier sets out what the group builds and buys, and the Philippine supply, site and skills case for the next stage of that footprint.

01 · The group

A telecoms fortune, reassembled into fibre, data halls and compute

Cassava is not a startup. It is the consolidation of three decades of African telecoms assets into one balance sheet, and that history explains why it buys hardware in volume and sells it as service.

Strive Masiyiwa built Econet Wireless in Zimbabwe after a five year legal fight for a mobile licence, then expanded into Botswana, Nigeria, New Zealand and beyond. The fibre business that became Liquid Intelligent Technologies grew out of that estate, laying cable where incumbents would not. Cassava Technologies is the holding structure created to put those businesses, plus data centres, cloud, payments and artificial intelligence capacity, under one management team and one capital plan.

The group describes itself as a global technology leader of African heritage. That phrasing matters commercially. Its customers are African enterprises, governments and multinationals operating on the continent, and its pitch is data sovereignty: compute, storage and network capacity that sits inside the jurisdiction rather than in Frankfurt, Singapore or Virginia.

Hardy Pemhiwa, a former group chief executive of Econet, runs the company as president and group chief executive. Masiyiwa remains founder and executive chair. The register combines African institutional capital, development finance institutions and two United States technology companies, which is an unusual mix and one that shapes what the group can commit to.

For a Philippine supplier, the practical read is simple. This is an operator that will keep buying racks, cable, power equipment and thermal hardware for years, in multiple countries, under development finance procurement standards. It is not a company looking for a low cost country to make a consumer product.

Legal name
Cassava Technologies
Headquarters
United Kingdom
Founder and chair
Strive Masiyiwa
President and group CEO
Hardy Pemhiwa
Business units
Liquid Intelligent Technologies, Africa Data Centres, Cassava AI, Liquid C2, Sasai Fintech
Footprint
Africa, the Middle East, Latin America and the United States
Fibre network
About 100,000 kilometres, with more than 40 licences
Ownership
Econet Group, British International Investment, Public Investment Corporation, Royal Bafokeng Holdings, Afreximbank, Gateway Capital, DFC, Finnfund, Google and NVIDIA
02 · Unit ledger

Five businesses, one supply chain behind them

Each unit buys something different. The fibre business buys cable and optical equipment, the data centre business buys power and cooling, the payments business buys terminals and field support.

Liquid Intelligent Technologies

Fibre, metro networks, sea cable capacity and enterprise connectivity

The operating backbone of the group and the oldest part of the estate, grown out of Econet. It runs terrestrial fibre from Cape Town to Cairo and from Kenya to Nigeria, holds licences across its markets, and resells capacity on the sea cables that connect the continent to Europe, the Gulf and Asia.

Terrestrial fibre Sea cable capacity Enterprise links

About 100,000 km of network

Africa Data Centres

Carrier neutral colocation across Tier III and Tier IV sites

The largest carrier neutral data centre network on the continent by the company statement, with sites certified to ISO and payment card standards and hubs in Johannesburg, Cape Town, Nairobi, Lagos, Cairo and Casablanca. This is the unit that buys racks, power shelves, busway, cooling and cabling in volume.

Colocation Tier III and IV Cross connects

Nine certified sites in six countries

Cassava AI

Graphics processor capacity sold as a service

The youngest unit and the one setting the group pace. It buys NVIDIA accelerators, builds them into data halls, and sells training and inference capacity to enterprises, governments and model builders, including sovereign AI programmes that require the compute to sit inside the country.

GPU as a service Sovereign AI Model hosting

Five AI factories announced

Liquid C2

Cloud, cyber security and managed services

The cloud and security arm, built on partnerships with Microsoft, Google, Amazon Web Services, Cisco, Oracle and Palo Alto Networks. It is the unit closest to a Philippine capability centre conversation, because the work is delivered by engineers rather than shipped in containers.

Cloud Cyber security Managed services

Hyperscaler partner stack

Sasai Fintech

Payments, wallets and merchant acquiring

A consumer and merchant payments business with 21 million customers and 220,000 point of sale terminals deployed by 2025 by the company statement. Payments is a hardware and support business as much as a software one, which is why terminal assembly, repair and field support matter to it.

Wallets Merchant acquiring Terminals

US$4.9B annual transaction value

03 · Capital and AI

Two years that turned a connectivity group into a compute buyer

The December 2024 raise, the NVIDIA relationship and the five site AI factory programme are the sequence a supplier should understand, because each step converts capital into hardware orders.

December 2024

The capital raise that reset the balance sheet

The group closed US$310 million, made up of US$90 million of equity from the United States International Development Finance Corporation, Finnfund and Google, and US$220 million of debt refinancing. The raise followed a reorganisation that put the fibre, data centre, cloud, payments and AI businesses under one management team.

2025

South Africa first

The first AI factory went into service in South Africa, built on the NVIDIA accelerated computing platform and offered to customers as capacity rather than as hardware. The group framed it as infrastructure for African model builders, governments and enterprises that cannot send sensitive data offshore.

2026

Five sites and a joint venture

South Africa, Nigeria, Kenya, Egypt and Morocco form the announced footprint, with all five targeted for operation by late 2026. Egypt is run as a joint venture with Vodafone Business under the Africa Data Centres Egypt name, reported at about US$1 billion, and Egypt and the first national AI factory opened under that arrangement.

2026

Two Silicon Valley shareholders

Google came in with the December 2024 equity. NVIDIA followed as the second United States technology investor in the group, alongside the development finance institutions and South African pension capital already on the register. Capital of that kind buys data halls, power equipment and cable, and it buys them from Asian suppliers.

04 · Philippine market

The Philippine capacity ladder is short, and it is being climbed now

Operators already in the country have energised tens of megawatts and announced hundreds more. That pipeline is the order book for every rack, busway and cold plate a supplier could quote.

ST Telemedia Global Data CentresSeven facilities across Metro Manila and Cavite

32 MW energised at the flagship campus

ePLDTIncumbent telco subsidiary, Cavite site planned

Up to 100 MW planned in Cavite

Digital EdgeNARRA1 facility in Laguna, live since 2023

10 MW operating

Market revenueUnited States Department of Commerce estimate

US$638.75M in 2025

Bar lengths show announced or energised capacity against the largest Philippine pipeline, not a like for like comparison of live load. Figures come from operator statements and market reporting summarised in the sources line.

US$49.6B Philippine electronics exports in 2025, about 59 percent of merchandise exports
358,000 Direct jobs in registered electronics enterprises, PEZA reporting
1.82M Direct jobs in IT and business process services, 2024, IBPAP
+33% International capacity added by the Apricot cable at its Digos landing

The connectivity side is moving too. The Apricot system landed at Digos and lifted PLDT international capacity by about a third, Jupiter and the Asia Submarine cable system land at Daet, and a Davao landing station serves the south. Globe has been preparing three new undersea cables of its own. For a group whose model is continental fibre plus data halls, the Philippine east coast is a plausible eastern anchor rather than a distant market.

Policy moved as well. The Konektadong Pinoy Act, Republic Act 12234, lapsed into law on 24 August 2025 and its implementing rules were signed on 5 November 2025. It created a data transmission industry participant licence and an open access regime, so a new entrant can build and share transmission capacity without assembling a full telco franchise first.

05 · Supply chain

What a data hall actually buys, and which of it the Philippines can supply

Nine categories, rated honestly. Three are ready today, four are partial, and two are gaps that no amount of enthusiasm will close this year.

CategoryPhilippine baseVerdict
Rack integration and enclosure build
Racks, containment, cable trays and blanking panels
Sheet metal fabrication, powder coating, electromechanical assembly and test in PEZA zones across Laguna, Cavite and Batangas. Ready
Cable assemblies and harnesses
Power whips, fibre patch cords, trunk assemblies
A mature harness industry serving automotive, appliance and networking customers, with English documentation and traceability as standard. Ready
Power distribution and busway
Busway, remote power panels, distribution boards
Electrical equipment manufacturing for construction and utilities, including switchgear assembly, panel building and busbar fabrication. Partial
Uninterruptible power and conversion
Sub assemblies, magnetics, control boards
Electronics manufacturing services with power supply experience, though high power three phase conversion is dominated by Chinese and European brands. Partial
Thermal and liquid cooling
Cold plates, manifolds, heat exchangers
Heat exchanger, radiator and HVAC manufacturing for automotive and appliance lines, with brazing, pressure test and leak test capability. Partial
Printed circuit board assembly
Boards for monitoring, control and power
Deep surface mount and box build capacity, the same base that serves networking and power customers today, with functional test in house. Ready
Semiconductor assembly and test
Components, sensors, power discretes
About 73 percent of the electronics sector by value, with packaging, test and advanced packaging clusters in Calamba, Cabuyao, Baguio and Clark. Ready
Modular data hall and skid build
White space modules, power skids
No dedicated prefabricated data centre industry yet. The inputs exist, the integration and factory acceptance test discipline is the missing layer. Gap
Optical fibre drawing
Fibre, loose tube, ribbon
No optical fibre drawing plant in the country. Cable assembly is real, the glass is imported, and energy cost makes a greenfield draw plant hard to justify today. Gap
06 · Talent

The part of the build that is not made of metal

A distributed estate needs people who can answer a ticket at three in the morning in the customer's language. That is where the Philippines is strongest and where the margin is least exposed to freight cost.

The IT and business process industry closed 2024 with 1.82 million direct employees and US$38 billion in revenue, according to the industry association, and it was tracking toward about 1.9 million jobs and US$40 billion for 2025. That workforce is not a call centre stereotype any more. It includes network operations, security operations, cloud engineering, data engineering and technical support, delivered in English on shift patterns built around North American, European and African time zones.

For a group running sites from Johannesburg to Cairo to Lagos, a Manila or Cebu operations centre offers something a European one cannot: a team awake during the African business day and the Asian business day at once, at a cost base closer to the African sites than to London. Remote hands coordination, spares dispatch, ticket triage and monitoring are the obvious first functions.

The same workforce supports the factory floor. English is the language of engineering documents, quality records and customs paperwork, which removes a translation layer that costs most manufacturers a review cycle on every drawing revision.

07 · Rules

The fiscal and licensing stack a data centre programme would use

Two laws carry most of the weight: CREATE MORE for the tax package, and Konektadong Pinoy for the right to move data across infrastructure you did not build yourself.

InstrumentWhat it givesWho it applies to
CREATE MORE, Republic Act 12066Four to seven year income tax holiday, set by location and industry tierRegistered export enterprises, effective 28 November 2024
Special corporate income taxFive percent of gross income in place of national and local taxesAn alternative to the enhanced deductions regime
Enhanced deductionsTwenty percent corporate income tax with additional deductionsOne hundred percent on power, fifty percent on direct labour and domestic inputs
Capital equipmentDuty exemption on importation and VAT zero rating on local purchasesFor equipment and inputs tied to the registered export activity
Local business taxCapped at two percent of gross incomeDuring the incentive period, which matters for a power heavy site
Konektadong Pinoy, Republic Act 12234A data transmission industry participant licence and an open access regimeLapsed into law on 24 August 2025, rules issued on 5 November 2025
PEZA registrationSingle window permitting, bonded warehousing and customs supportAcross IT parks and economic zones in Luzon, the Visayas and Mindanao
Luzon Economic CorridorCoordinated infrastructure and permitting around Subic, Clark, Manila and BatangasA Philippine, United States and Japan initiative

Incentive terms follow Republic Act 12066 and its implementing rules, and Republic Act 12234 with the rules issued in November 2025. Availability depends on the registered activity, the zone and the investment promotion agency decision. Confirm with the agency and counsel before modelling a project.

08 · Scorecard

Five things the Philippines can win, four it cannot

A dossier that only lists advantages is a brochure. This is the split a site selection team would actually argue over in the second meeting.

Realistic wins

  • Rack, tray and containment build The sheet metal and coating base is already qualified by networking and appliance customers, so a first article is weeks rather than years.
  • Cable and harness programmes Automotive grade traceability transfers directly to data hall power whips and fibre trunks, and English documentation is routine.
  • Board level assembly and test Surface mount capacity with in house functional test is the natural entry for monitoring, metering and power control boards.
  • Remote operations and network engineering English first engineering, a 1.82 million person IT and business process industry, and shift patterns built for customers in other time zones.
  • Repair and reverse logistics Component level repair, refurbishment and spare pool management for African and Middle Eastern sites, shipped from a bonded zone.

Honest limits

  • Optical fibre drawing There is no glass draw plant, and industrial electricity is among the most expensive in the region. Importing fibre and assembling cable is the realistic role.
  • High volume consumer electronics on price Vietnam, Thailand and mainland China beat the Philippines on scale and logistics depth. A Philippine line wins on engineering content and mix, not on unit cost.
  • Very large single site power A 100 megawatt campus needs a grid connection and a utility agreement years in the making. Philippine sites are feasible, they are not quick.
  • Silicon wafer fabrication There is no wafer fab and no announced one. Assembly, test and packaging is the industrial base, not front end manufacturing.
09 · First programme

How a supply or site programme actually starts

Four stages, each with a deliverable the customer can hold. Nothing here needs a memorandum of understanding to begin.

01

Define the bill of materials

Send the data hall design, the annual unit volume, the destination port and the acceptance standard. The first output is a split of what can be built in country, what can be assembled from imported kits, and what should stay with the existing supplier.

Typically one to two weeks
02

Match the zone to the load

Rack and cable work fits Laguna, Cavite, Batangas or Clark. Operations work fits Metro Manila, Cebu or Davao. A site with heavy power draw needs a different conversation with the distribution utility than a warehouse fit out does.

Two to four weeks with the zone
03

Qualify the supplier

Process capability, gauge repeatability, electrostatic discharge controls, traceability and a social compliance audit, with English documents issued to the customer quality team. A pilot lot and first article follow before any volume commitment.

Four to eight weeks
04

Operate and second source

Volume runs against a weekly schedule with buffer stock in the zone, bonded transfer and a named account engineer. Once the first line is stable, a second Philippine site can be qualified for continuity.

Ongoing, reviewed quarterly
11 · Questions

Cassava Technologies and Philippine manufacturing questions answered

The questions buyers, brokers and journalists ask first, answered without overstating what exists.

Does Cassava Technologies operate in the Philippines?

No. Cassava Technologies publishes no Philippine office, data centre, factory or announced investment. This page is not a claim of an existing presence and it is not affiliated with the company. It profiles the group from public statements and sets out the Philippine manufacturing, site and skills case for a future programme.

What is Cassava Technologies?

A UK headquartered digital infrastructure group of African heritage, built out of the Econet businesses founded by Strive Masiyiwa. It combines fibre and connectivity through Liquid Intelligent Technologies, colocation through Africa Data Centres, graphics processor capacity through Cassava AI, cloud and cyber security through Liquid C2, and payments through Sasai Fintech.

How large is the group and who owns it?

The company states that its products and services reach 94 countries, that its network runs about 100,000 kilometres with more than 40 licences, and that Africa Data Centres operates nine ISO and payment card certified sites in six countries. Shareholders include Econet Group, British International Investment, the Public Investment Corporation, Royal Bafokeng Holdings, Afreximbank, Gateway Capital, the United States International Development Finance Corporation, Finnfund, Google and NVIDIA.

What are the AI factories and where are they?

Five graphics processor facilities announced for South Africa, Nigeria, Kenya, Egypt and Morocco, built on the NVIDIA accelerated computing platform and sold as capacity rather than hardware. South Africa went into service first, Egypt is run with Vodafone Business under the Africa Data Centres Egypt joint venture, and the group has targeted all five for operation by late 2026.

Why would a Philippine manufacturer matter to an African infrastructure group?

Because the equipment is bought globally. Racks, power shelves, cable assemblies, cold plates and boards for an African data hall are sourced from Asian factories today. The Philippines already supplies electronics manufacturing services to global networking, automotive and power customers, so it competes for that order book on engineering content, English documentation and delivery reliability rather than on the lowest unit price.

What can the Philippines actually make for a data centre build?

Racks, containment, cable trays, cable assemblies and harnesses, distribution boards and busbar work, cold plates and heat exchangers, printed circuit board assemblies and box build, semiconductor assembly and test, plus component level repair and spare pool management. The template file on this page rates each of those as ready, partial or a gap.

What can it not make, honestly?

Optical fibre is drawn elsewhere and there is no glass plant in the country. Very high volume consumer electronics on price is a losing contest against Vietnam and mainland China. A 100 megawatt campus needs a utility agreement measured in years. There is no wafer fabrication. A programme that respects those limits starts with assembly, integration and test work.

Which incentives apply to a data centre supplier or operator?

The CREATE MORE Act, Republic Act 12066, offers a four to seven year income tax holiday followed by either a five percent special corporate income tax on gross income or the enhanced deductions regime at twenty percent corporate income tax. The enhanced regime allows a full additional deduction on power, which suits a power heavy site. PEZA registration adds single window permitting and bonded warehousing, and the Konektadong Pinoy Act, Republic Act 12234, opened data transmission to a new participant licence class.

Where does the apparel desk fit into an infrastructure programme?

A site visit, a commissioning crew and an operations floor all need kit that arrives on schedule. The desk supplies technical workwear, high visibility safety wear for construction and logistics, corporate uniforms for the operations floor and hospitality uniforms for the visiting team, quoted per programme with serialised cartons for multi site distribution.

12 · Contact

Talk to the Philippine infrastructure supply desk

Whether you are benchmarking an ecozone for a data hall, quoting rack or harness volume, or staffing an operations floor for a customer in another time zone, send the specification, the monthly volume and the destination port. The team works from Tagum City and Cagayan de Oro, Mon to Sat, 8:30 AM to 5:00 PM.

Mankilam Main Office, Tagum City

Naungayan Building, Aala Road, Barangay Mankilam, Tagum City, Davao del Norte 8100, Philippines. Production coordination and freight handover for Mindanao shipments.

Mon to Sat, 8:30 AM to 5:00 PM (PHT)

Cagayan de Oro Office

Ficcoville, Iponan, Cagayan de Oro City, Misamis Oriental, Philippines. Account support for buyers consolidating through the Northern Mindanao corridor.

Mon to Sat, 8:30 AM to 5:00 PM (PHT)

What to send

Drawing set, bill of materials, annual volume, destination port and the acceptance standard. For a site question, send the load profile and the target zone.

Reply within one business day

Company figures reflect the Cassava Technologies company site, including the about page and business unit statements, the December 2024 funding announcement covering US$90 million of equity from the United States International Development Finance Corporation, Finnfund and Google alongside US$220 million of debt refinancing, the AI factory announcements for South Africa, Nigeria, Kenya, Egypt and Morocco, the Africa Data Centres Egypt joint venture with Vodafone Business, and reporting on the NVIDIA investment. Philippine figures reflect Semiconductor and Electronics Industries in the Philippines Foundation export data for 2025, Philippine Statistics Authority merchandise trade statistics, PEZA investment and employment statements, IT and Business Process Association of the Philippines data for 2024 and 2025, United States Commercial Service market reporting on Philippine data centres, operator statements from ST Telemedia Global Data Centres, ePLDT and Digital Edge, PLDT and Globe statements on the Apricot, Jupiter, Asia Submarine and Davao cable systems, Republic Act 12066 and its implementing rules, and Republic Act 12234 with the rules issued in November 2025. Cost, transit time and qualification durations are indicative and must be confirmed with the carrier, the zone, the utility and the counterparty before commitment.